Prepare effectively for your APICS CPIM-Part-2 Certified in Planning and Inventory Management(Part 2) certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 2 / 3
Total 151 questions

Which of the following actions best supports a company's strategic focus on delivery speed to improve competitiveadvantage?

A.

Maintaininghigh-capacityutilization

B.

Developing flexible operations

C.

Cross-training workers

D.

Implementing rapid process improvements

What priority control technique is most appropriate for a firm using a cellular production system?

A.

Shortest processing time (SPT) rule

B.

Distribution requirements planning (DRP)

C.

Pull production activity control (PAC)

D.

Push production activity control (PAC)

Which of the following activities would be effective to mitigate the bullwhip effect?

A.

Implement track and trace technology.

B.

Use a push system.

C.

Reduce lead times.

D.

Increase inventory.

A company with stable demand that uses exponential smoothing to forecast demand would typically use a:

A.

low alpha value.

B.

low beta value.

C.

high beta value.

D.

high alpha value.

Operations strategy:

A.

is a bottom-up reflection of what the whole group or business wants to do.

B.

involves translating market requirements into operations decisions.

C.

involves exploiting operations capabilities in the global market.

D.

is a top-down activity where operations improvements cumulatively build strategy.

Which of the following statements is true about the mean time between failures (MTBF) measure?

A.

Itis used for non-repairable products.

B.

An increase in MTBF is proportional to an increase in quality.

C.

Itis a useful measure of reliability.

D.

Itis the same as operating life or service life.

Which of the following outcomes is a benefit of mixed-model scheduling?

A.

Increased inventory

B.

Improved demand response

C.

Fewer setups

D.

Fewer material shortages

A machine is suddenly having excessive downtime. Which of the following tools would be used in a root cause correctiveaction process to determine the problem?

A.

Failure mode effects analysis (FMEA)

B.

Standardized work analysis chart

C.

Balance chart

D.

A3 method

The production plan relates to a firm's financial planning because it is used to:

A.

calculate standard product costs.

B.

determine variable costs.

C.

project payroll costs.

D.

identify future cash needs.

Which of the following conditions is required for an effective single-sourcing relationship?

A.

Demand for the customer's products must be stable.

B.

The supplier must offer the lowest price per unit.

C.

The organizations must be mutually dependent.

D.

The organizations must be located close to each other.

When procuring for innovative products, the focus should be on:

A.

unit cost.

B.

total landed cost.

C.

lead times.

D.

lot sizes.

An effective process to create meaningful change begins with:

A.

reviewing financial outcomes and metrics over the last 4 quarters year-over-year.

B.

identifying and discussing a past crisis, a potential crisis, or major opportunities.

C.

refreshing corporate strategy to align with current marketplace realities for your industry.

D.

using consultants to provide in-depth analysis of current management opportunities.

When a certified supplier's delivery performance declines, a company should respond initially by:

A.

tightening performance criteria for the supplier.

B.

establishing a temporary buffer of finished goods inventory at the supplier.

C.

communicating with the supplier to investigate the source of the problem.

D.

increasing the standard lead time of the component to allow for supplier delays.

In a make-to-order (MTO) environment, inputs to sales and operations planning (S&0P) should include the:

A.

projected backlog of customer orders.

B.

work-in-process (WIP) inventory.

C.

finished goods inventory.

D.

available-to-promise (ATP) data.

"We have observed the inventory system does not handle plastic parts well." Whatshould be added to the problemstatement to make it more useful?

A.

Measurements that help describe the problem

B.

Guidance to which problem-solving tools should be used

C.

Criteria for selecting the improvement team

D.

Description of who is responsible for the problem

The cost accountant has discovered a consistent overage in actual run time for one operation. This informationshould besent first to the:

A.

product manager to increase the selling price of the product.

B.

quality manager to add a new quality measurement to the operation.

C.

production supervisor to review and explain the overage.

D.

the engineering manager to evaluate the run time for the routing.

An advantage of applying ABC classification to a firm's replenishment items is that:

A.

it distinguishes independent demand from dependent demand.

B.

it allows planners to focus on critical products.

C.

it provides better order quantities than the economic order quantity (EOQ]).

D.

it allows the firm to utilize time-phased order point (TPOP).

Which of the following types of operational strategies typically would result in the lowest inventory cost?

A.

Mixed-model

B.

Level

C.

Chase

D.

Hybrid

Which of the following trade-offs should be evaluated when determining where to place inventory in a multi-echelon supplychain network?

A.

Production cost and lot sizequantity

B.

Purchase cost and shrinkage rates

C.

Transportation cost and delivery time

D.

Customer price and order quantity

Shop backlogs remain constant when:

A.

work input equals work output,

B.

forecasts are updated on the basis of the longest lead time item.

C.

capacity is assumed to be infinite.

D.

shop orders are released at a steady rate.