Weekend Sale - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmaspas7

Easiest Solution 2 Pass Your Certification Exams

CQE ASQ Certified Quality Engineer Exam Free Practice Exam Questions (2025 Updated)

Prepare effectively for your ASQ CQE Certified Quality Engineer Exam certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 2 / 3
Total 175 questions

Which of the following techniques is used when implementing single minute exchange of die?

A.

Using more fasteners and clamps

B.

Eliminating the use of intermediate jigs

C.

Separating internal and external setup operations

D.

Adjusting and eliminating mechanization

An engineer is part of a new product team and has found an issue with one of the product's parts. The part's supplier has documented that the part is known to follow a normal distribution, but it has a large variance when produced. The engineer's product design has accounted for variations and incorporated the pan. Which of the following design processes did the engineer follow?

A.

Design-to-cost

B.

Design for robustness

C.

Axiomatic design

D.

Design for test

Failure to cite the significant contributions of other individuals in a final manuscript for publication violates which category of the ASQ Code of Ethics?

A.

Fundamental Principles

B.

Relations with the Public

C.

Relations with Employers and Clients

D.

Relations with Peers

The primary purpose of the material review board is to

A.

monitor scrap and rework costs

B.

minimize quality costs

C.

disposition nonconforming product

D.

determine the root cause of problems

A process has the following output characteristics:

Mean = 28.65

Median = 24

Mode = 20

The uniniodal distribution with these characteristics is defined as

A.

skewed left

B.

skewed right

C.

not skewed

D.

s-shaped

80° o of weekly inspection non-conforming reports presented to the material review board (MRB) at Marathon Manufacturing Co. end up not being dispositioned for corrective action. Project management developed a risk management plan which included a standard repair manual (SRM) to help mitigate these issues. Only conditions that exceed SRM requirements or specifications will now be forwarded for MRB review. A week after releasing the SRM. the quality engineering team decided to generate and distribute weekly alert reports of non-conformities that exceed SRM requirements or specifications to all inspectors. They also instructed all employees involved in the creation of those discrepancies be re-trained.

Which of the following processes may be considered a risk treatment?

A.

Generating a weekly report of non-conformities that exceed SRM requirement and specifications

B.

Distributing weekly alert report of non-conformities to all inspectors

C.

Instructing that all employees involved creating those discrepancies be re-trained

D.

Reducing throughput at Marathon Manufacturing Co.

A graph of a data set, composed of a series of rectangles, each proportional in width to the range of values in a class and proportional in height to the number of items or fraction of items falling in these classes, is called which of the following?

A.

Histogram.

B.

Raw data.

C.

Ogive.

D.

Venn diagram.

Which of the following statements is always true about an effective design review?

A.

It occurs when the design is complete.

B.

It is informal in order to brainstorm more ideas.

C.

It is based on defined criteria.

D.

It is conducted by the development team.

During a daily production meeting, the materials manager discusses a priority shipment that is being delayed due to material being placed on hold from a nonconformance. The process engineer was present when the material was placed on hold and states that the nonconformance will not impact fit. form or function. The manufacturing manager shares that per the ISO standard, the risk should be accepted and the product should be shipped. Which action would be most appropriate for the quality engineer to take first?

A.

Commit to initiating a deviation and allow the material to ship but complete a corrective action

B.

Commit to completing a corrective action but insist that the material be scrapped since it is nonconforming

C.

Commit to expediting the review and disposition of the nonconforming material with the MRB

D.

Commit to getting approval from the quality manager to allow the material to ship

A system was designed with 3 capacitors. When the system is first activated all capacitors are operating. The system continues to operate as long as at least 1 capacitor is operating. This is an example of

A.

Redundancy.

B.

A series system.

C.

An active parallel system.

D.

A standby parallel system.

Which of the following quantitative methods does NOT apply to the assessment of actual system/component reliability?

A.

Statistical analysis of field test and failure data.

B.

Statistical allocation of reliability goals.

C.

Evaluation of laboratory test data.

D.

Analysis of results of reliability demonstration tests.

If the probability of two cars starting on a cold morning is 0.6 for each car. what is the probability of at least one of the cars starting?

A.

0.16

B.

0.24

C.

0.36

D.

0.84

In a sample of 2.000 items taken from a large lot. 80 are found to be nonconforming. What is the 95% confidence interval for the proportion of nonconforming items?

A.

[0.0328. 0.0472]

B.

[0.0314. 0.0486]

C.

[0.0308. 0.0499]

D.

[0.0302. 0.049

The following data sets were presented to top management.

Which problem area should be targeted for improvement first?

A.

A

B.

B

C.

C

D.

D

Typically Pareto diagrams are used for which of the following reasons?

Ⅰ. To display the significant few categories.

Ⅱ. To compliment attribute data charting.

Ⅲ. To eliminate insignificant categories.

Ⅳ. To focus attention in priority order.

A.

I and III only

B.

I, II and III only

C.

II, III and IV only

D.

I, II, III and IV

A process produces rejects at a rate of 6° o. If multiple samples of 5 are drawn from a population of 100.000. what is the expected number of rejects per sample?

A.

0.3

B.

30.0

C.

5,000.0

D.

6,000.0

When a 24 experiment is fractionated to a 24'5 experiment, the fractioned design is also known as a

A.

90% fraction

B.

75% fraction

C.

fraction

D.

fraction

Which of the following tools should be used to break a broad goal into increasingly detailed levels?

A.

Affinity diagram

B.

Interrelationship digraph

C.

Matrix diagram

D.

Tree diagram

If a quality engineer discovers a situation in which unlabeled finished product could be shipped to customers, what would be an appropriate preventive action to take?

A.

Train the shipping department staff in quality tools and techniques

B.

Identify the unlabeled product and have it labeled

C.

Form a team to error-proof the process

D.

Conduct a backward trace of the process

Rank in order, from most to least effective, the controls for mitigating risk.

1. Safety devices

2. Design change

3. Training

A.

1,2,3

B.

1,3,2

C.

2,1,3

D.

2,3,1

Page: 2 / 3
Total 175 questions
Copyright © 2014-2025 Solution2Pass. All Rights Reserved