Prepare effectively for your ASQ CSQE Certified Software Quality Engineer Exam certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2026, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 3 / 5
Total 280 questions

Once a problem has been identified in the problem resolution process, which of the following steps should be taken next?

A.

Search for solutions

B.

Take corrective action

C.

Determine probable causes

D.

Seek authority to act

A software configuration baseline is best described as

A.

the installation of the configuration library

B.

one or more configuration items tested

C.

one or more configuration items approved

D.

one or more configuration items packaged for shipment

Which of the following steps is taken first when managing earned value metrics?

A.

Determining the critical resources to be tracked

B.

Calculating the planned value, earned value, and actual value metrics

C.

Analyzing the earned value metric compared to the other metrics to date

D.

Allocating the resource budget to individual tasks in the work breakdown structure

Which of the following items is an appropriate topic to be discussed in a daily scrum meeting?

A.

A product backlog item from the current sprint and move it to future sprints

B.

An impediment one of the team member was facing yesterday

C.

The list of all product backlog items that need to be addressed in current sprint

D.

A change in the product roadmap which impacts current future releases

A project manager has decided to modify a project schedule to allow some of the low-level design to begin before all of the high-level design has been completed. Is this approach appropriate?

A.

No, because high-level design must be completed before low-level design is started.

B.

Yes, provided the same people perform both the high-level and the low-level designs.

C.

Yes, provided the activities have a relationship to one another.

D.

Yes, provided no unfinished high-level design will impact a specific area to be low-level designed.

The following data flow diagram was created for a project.

The X in this diagram represents which of the following?

A.

A timing delay

B.

A data store

C.

An I/O interrupt

D.

A sub-process of P1

If N equals the number of defects originating and found in phase X, and S equals the number of defects originating in phase X and found in subsequent phases, which of the following represents the efficiency rate of error detection for phase X?

A.

(N + S) / N

B.

N / (N + S)

C.

N × S

D.

N / (N − S)

A software maintenance release is conducted to deliver new

A.

features

B.

functionality

C.

defect corrections

D.

software products

The following chart was developed to compare defects in two projects. Which of the following conclusions can be drawn from this chart?

A.

The projects have the same defect rates.

B.

The projects have different defect profiles.

C.

More defects were removed per phase from Project 1 than Project 2.

D.

More defects were removed per phase from Project 2 than Project 1.

Which of the following techniques is used to measure the number of test cases needed to execute each code statement at least once?

A.

Function point analysis

B.

Cause and effect diagram

C.

Cyclomatic complexity

D.

Defect removal effectiveness

Which of the following statements from a software requirements document is an example of a functional requirement?

A.

“The system must reject non-numeric input.”

B.

“The system must be 99.9% operational.”

C.

“The system’s response time must be less than three seconds.”

D.

“The system must be developed according to IEEE standards.”

Which of the following is a management practice that will provide business continuity?

A.

Creating and documenting a business continuity’ plan

B.

Defining an organizational policy for business continuity

C.

Analyzing and assessing the organization for business continuity’

D.

Identifying and selecting appropriate strategies for business continuity

Which of the following describes when a test plan should be changed?

A.

After product stability has been assessed

B.

After changes to the design specifications

C.

After each code review

D.

When the configuration management tool is updated

Which of the following items are examined regularly at a program review meeting?

A.

Project dependencies

B.

Change request approvals

C.

Quality system updates

D.

Problem reports

Which of the following types of meetings is structured most like a program review meeting?

A.

Daily feedback

B.

Scrum of Scrums

C.

Iteration planning

D.

Backlog refinement

Which of the following software security requirements objectives is met by limiting access to the system through passwords?

A.

Supplying an audit trail

B.

Preserving data integrity

C.

Maintaining access control

D.

Providing backup and/or recovery

A software requirements specification (SRS) for software that is part of multiple systems should include which of the following elements?

A.

Training requirements

B.

System quality characteristics

C.

Physical requirements

D.

External interfaces

Which of the following goals is important when a defect tracking system is being established?

A.

Collecting as much data as possible

B.

Defining how to classify the defects

C.

Approving the test team’s validation plan

D.

Determining how to prevent defects

In a software development company, which of the following authorities is responsible for establishing the company ' s quality policies?

A.

Senior management

B.

Quality management

C.

Engineering development teams

D.

A cross-functional ream of developers and managers

A function point analysis uses counts of which of the following elements^

A.

Data definitions

B.

Physical lines

C.

Executable lines

D.

External inquiries