Prepare effectively for your ASQ CSSBB Certified Six Sigma Black Belt certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 4 / 5
Total 300 questions

Time is always the metric on the horizontal scale of a(n) ___________ Chart.

A.

Pareto

B.

Xbar

C.

Multi-Vari

D.

NP

Questions that can be best answered by a Visual Factory include all of these except _____________________.

A.

Are downtime issues easily noted?

B.

Can extra inventory be seen easily?

C.

Are unneeded tools or supplies easily noted?

D.

Are setups optimized for lower scrap levels?

The validity of the decision made with Hypothesis Testing is dependent upon all of these except ___________________.

A.

Beta risk

B.

Alpha risk

C.

Range of data

D.

Sample size

The Control Limits width varies if the sample size varies for which type of chart?

A.

P Charts

B.

NP Charts

C.

Xbar-R Charts

D.

Time Series Charts

Situations where standardized work needs to be incorporated include all of these except _____________________.

A.

Changeover instructions incomplete

B.

Lack of a system to assure proper inventory levels at repair stations

C.

Machines continually operating to reduce the labor cost per piece

D.

Process flow for the same product assembly taking various cycle time for completion

The _______ is the most frequently occurring value in a distribution of data.

A.

Median

B.

Mean

C.

Mode

D.

Center Point

A ___________ problem in the Measurement System suggests that there is a lack of consistency in the measurement over time.

A.

Linearity

B.

Bias

C.

Stability

D.

Magnitude

If a Six Sigma project was to reduce changeover times and the team found the project success was decreasing over time since changeover times began to creep back up, which Lean tools should be considered in the Control Phase to reestablish and sustain the project success?

A.

Improve the lighting to assure adequate visibility

B.

Confirm a Visual Factory exists to assure proper communication of status of machines

C.

Implement Kanbans to assure enough inventory for the process step

D.

Reword the standardized work instructions to use active verbs and not passive phrases

If the results from a Hypothesis Test are located in the "Region of Doubt" area, what can be concluded?

A.

Rejection of the Alpha

B.

We fail to reject the Null Hypothesis

C.

The test was conducted improperly

D.

We reject the Null Hypothesis

The primary objective in removal of waste is to improve the Order Production Cycle where the time from _________________ to the time of receipt of payment is compressed.

A.

Shift start

B.

Product development

C.

Receipt of an order

D.

New fiscal year

What conclusion is most correct about the Experimental Design shown here with the response in the far right column?

A.

No factor has enough statistical confidence greater than 95% to have an impact on the response rate

B.

Constant, Adv and Bev are the only factors statistically affecting the response rate with 95% confidence or more

C.

If the Adv is increased from the low level to the high level, the response rate increases

D.

The response level is statistically concluded to only need the Adv and Bev factors set at the low level to get the largest response rate

E.

This design does not have enough experimental runs to conclude anything as evidenced by the lack of P-values in the MINITABTM output

A statistical test or Hypothesis Test is performed to reject or fail to reject a stated hypothesis and it converts the Practical Problem into a Statistical Problem.

A.

True

B.

False

A(n) ________________ has occurred when two inputs have a greater impact on a change in the output than either of the inputs has by itself.

A.

Dependency

B.

Bimodal reaction

C.

Interaction

D.

Amplified effect

When analyzing the behavior of our process to assess customer satisfaction we are concerned about both the variation such that it stays within the spec limits and how well the Mean is __________________ the process requirements.

A.

Balanced against

B.

Over and above

C.

Twice as great as

D.

Centered relative to

As a means of measuring the effects on other areas of a process as a result of changes in the primary metric we also define and track ________________.

A.

Parallel process metrics

B.

Secondary metrics

C.

Tertiary metrics

D.

Industry standards

Cost of Poor Quality (COPQ) can be classified as Visible Costs and Hidden Costs. Which of these items is a Visible Cost?

A.

Lost Customer Loyalty

B.

Time Value of Money

C.

Returns

D.

Late Delivery

Which statement(s) are incorrect about Fractional Factorial Designs?

A.

A Half Fractional Design for 5 factors has the same number of experimental runs as a Full Factorial Design for 4 factors assuming no repeats or replicates or Center Points

B.

Quarter Fractional experiments can exist for those with 4 factors

C.

Resolution V design is desired while controlling costs of experimentation

D.

Half Fractional experiments do not exist for those designs with only 2 factors

“A calculated time frame that matches customer demand” is a definition of what Lean Principles term?

A.

Value Stream

B.

Kaizen event

C.

Takt time

D.

Kanban

If the production is for higher volume and monitoring and the Mean and variability is to be monitored for four machines producing product and the characteristic to be monitored is Variable Data, which SPC Chart is best to be selected?

A.

Xbar-R Chart

B.

Individual-MR Chart

C.

NP Chart

D.

CUSUM Chart

How many experimental runs exist in a Full Factorial and fully randomized design for 5 factors with 2 replicates for the Corner Points and no Center Points? The factors in the experiment are only at 2-levels.

A.

10

B.

128

C.

256

D.

64

Page: 4 / 5
Total 300 questions
Copyright © 2014-2025 Solution2Pass. All Rights Reserved