Summer Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: s2p65

Easiest Solution 2 Pass Your Certification Exams

CTS-I AVIXA Certified Technology Specialist – Installation Free Practice Exam Questions (2025 Updated)

Prepare effectively for your AVIXA CTS-I Certified Technology Specialist – Installation certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 6 / 8
Total 477 questions

Which topics should not be covered in an end-user training session? (Choose all that apply.)

A.

How to turn the system on and off

B.

How to change the IP addresses of the devices

C.

How to switch between the various program sources

D.

How to use the control system interface

The purpose of electrical grounding is to _____.

A.

ensure safety

B.

close a circuit

C.

consume extra power

D.

save money

Which of the following steps should be undertaken before attempting the troubleshooting process? (Choose all that apply.)

A.

Familiarize yourself with the AV systems and equipment

B.

Have the system documentation at hand

C.

Order a spare system controller

D.

Get an understanding of the warranty and maintenance agreements

Which one of these is an unsafe lift practice?

A.

Do not bend your knees and do the lifting with your back.

B.

Be sure to keep a firm footing and balance the weight between your feet

C.

Do not perform the lift alone; Always have a partner or helper.

D.

Perform the lift slowly; Do not make sudden movements or rotate during the lift

Place a cable label on ____ of every cable.

A.

the cable jacket on the load end

B.

the cable jacket of the source end

C.

every connector

D.

both ends of the cable jacket

If you go up one octave from 250 Hz, you arrive at _____.

A.

251 Hz

B.

125 Hz

C.

500 Hz

D.

1250 Hz

What is a power system that is solely used for computer and electronic systems called?

A.

Power distribution system

B.

Isolated ground system

C.

Supplemental ground system

D.

Individual branch circuit

In what applications is an A-weighted SPL most useful?

A.

In large concert halls and other Class A venues

B.

In environments with low listening levels such as speech applications

C.

At high-volume levels greater than 85dB SPL

D.

When using a DSP-based system

Most transformers have multiple wires on the primary side that allow you to adjust the ____ each loudspeaker.

A.

Placement of

B.

Impedance of

C.

Wiring scheme for

D.

Voltage level to

What type of drawing would you use to find out exactly how the projector should be mounted to the ceiling?

A.

Reflected ceiling plan

B.

Mechanical drawing

C.

Detail drawing

D.

Section drawing

HDMI builds on the DVI standard by adding _____.

A.

device protection

B.

ISDN

C.

video

D.

content protection

What can cause a mounting malfunction? (Choose all that apply.)

A.

Exceeding the load limit

B.

Improperly placing bolts

C.

Installing a mount directly to a ceiling tile

D.

Connecting a mount to blocking

Attenuation occurs when the signal level is _________.

A.

Decreased

B.

0 V

C.

Faulty

D.

Increased

The point at which power enters a building is called the _____.

A.

service entrance

B.

hot spot

C.

facility drop

D.

demark

A key objective for mounting AV equipment in a rack is to:

A.

hide it discretely in a closet

B.

protect the integrity of the system

C.

ensure only technical personnel can access it

D.

roll the gear in and out easily

Who should attend the construction kick off meeting for a project?

A.

Owner representative, architect, general & electrical contractors, AV providers

B.

Owner's lead technician, head of maintenance, the lead research developer

C.

Manufacturer's representative, computer programmers, AV cabling crew

D.

Local building inspector, owner, general contractor, electrical contractor

What is the measurement for frequency?

A.

DC

B.

Wavelength

C.

Hertz

D.

AC

Why is a plumb bob used during the installation process for a ceiling mounted projector?

A.

To locate high pressure fire control water lines

B.

To locate the spot on the ceiling tile for the projector mount opening

C.

To calculate the throw line distance to the screen from the mount

D.

To locate a direct line for stable mounting

____ transfers audio, video, power, and data signals all over one cable at 10Gbps in two directions.

A.

Thunderbolt

B.

DVI

C.

SDI

D.

HDMI

A scope statement should include:

A.

Only the items within the project scope

B.

Only the items within the deliverable scope

C.

All the tasks that have to be performed

D.

Both in-scope and out-of-scope items

Page: 6 / 8
Total 477 questions
Copyright © 2014-2025 Solution2Pass. All Rights Reserved