Prepare effectively for your Autodesk BIM_MGT_101 Autodesk Certified Professional in BIM Management for Building Design certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2026, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 1 / 1
Total 57 questions

Refer to the exhibit.

A designer cannot see a 2x4 tile ceiling in the hallway area of their Reflected Ceiling Plan, but that same ceiling is visible in a 3D view. The 2x2 ceilings in the other rooms are visible in both views.

What are two possible reasons for this? (Select two.)

A.

The ceiling was inadvertently deleted.

B.

A View Filter has been applied for that ceiling type.

C.

A View Template has been assigned with ceilings category visibility off.

D.

A Plan Region with a higher cut level has been applied to that area.

E.

Hide in View by Category was applied to that ceiling.

During a model review, several linked files appear missing or unloadable in the federated coordination file. The files were present and working the day before, and no changes were made to the Revit host model itself.

As the BIM manager, what is the most appropriate step to troubleshoot the issue?

A.

Check that file paths to linked models were set as relative and validate that the folder structure remains unchanged.

B.

Ask the modelling team to rebind all linked models using absolute file paths.

C.

Remove the missing links and advise each team to reinsert their models before the next coordination meeting.

D.

Recreate the host model using a previous backup and manually reload each link.

A client’s project schedule requires a rigorous milestone/gateway review process, defined in the BIM Execution Plan. The design firm has its own internal checklist.

What should a BIM manager do to ensure the team is complying with the client’s requirements?

A.

Add the client as a member on Autodesk Forma and allow them access to the published model.

B.

Import the client requirements as a PDF on the Revit opening view.

C.

Remap the phase of the model to match the client phase most aligned to Design Development.

D.

Review BEP requirements against the checklist and create Issues in Autodesk Forma for non-standard requirements.

The BIM manager receives an external lighting CAD file to link into the Architectural model and realizes the link is not vertically or horizontally aligned.

What fix needs to happen to resolve this misalignment?

A.

The BIM manager needs to go to a 3D view and move the model to align with the architectural geometry.

B.

The Lighting team needs to fix its shared coordinates to match those of the Architectural model and reissue the file.

C.

The BIM manager needs to acquire the shared coordinates of the CAD file.

D.

The Lighting team needs to add gridlines so the BIM manager can align its CAD file to the architectural gridlines.

The BIM manager on a large mixed-use development is leading the development of the project’s information-delivery strategy. The client has strict handover requirements for both asset data and spatial coordination. The design schedule includes overlapping packages, and some task teams are unfamiliar with structured data exchanges.

What is the most appropriate approach to establish the project’s information-delivery plans?

A.

Rely on each task team to define its own data requirements and delivery formats, then consolidate them into a mixed-use matrix mid-project.

B.

Assign each discipline a default set of file-naming conventions and assume its internal processes will align with delivery needs.

C.

Develop a task and information-delivery plan to coordinate when, how, and by whom specific project information will be delivered.

D.

Focus first on model-coordination planning, then address information delivery later in the construction phase.

The project manager would like to verify Autodesk Forma folder permissions assigned to team members but is not familiar with cloud-sharing platforms to access this information.

How can the BIM manager generate the required information?

A.

Word document.

B.

Revit Show History report.

C.

Report exported from Autodesk Forma.

D.

Excel spreadsheet.

The BIM Execution Plan (BEP) has just been completed for a new project. To ensure all multidisciplinary team members review and understand their roles and responsibilities, what is the most effective way to distribute the BEP before the project starts and ensure it remains accessible to everyone throughout the project?

A.

Include the BEP as part of the project contract and distribute it at project kickoff.

B.

Conduct a mandatory training session to review the BEP and archive it as official once approved by all disciplines.

C.

Upload the BEP to Autodesk Forma in a shared folder location to serve as a live copy.

D.

Email the BEP to all team members and request that they sign and return it as confirmation of review and agreement.

A project team has been ignoring their model warnings, and from talking with the team, it is apparent that they are intimidated by the number of warnings and unwilling to tackle resolving them.

What steps can the BIM manager take to educate the team and alleviate their reluctance to address these issues?

A.

Show the team how warnings are sorted by type and advise them on how to research and resolve them.

B.

Advise the team to export the warnings list, then bulk delete the elements creating the warnings.

C.

Install a third-party add-in that allows the team to mark all warnings with “ignore.”

D.

Create Autodesk Forma issues for each warning and assign them to specific team members.

Due to unpredictable material tariffs, a campus project anticipates possibly changing its structural framing system once pricing is finalized. This could affect floor-to-floor heights across several buildings.

What method would best ensure both initial and ongoing coordination of Levels and Grids across a large multidisciplinary Revit project?

A.

Use the Copy/Monitor tool on Levels and Grids.

B.

Establish a Main Model in Autodesk Forma through Design Collaboration.

C.

Provide consultants a model with Shared Coordinates pre-acquired.

D.

Export Property Lines, Report Shared Coordinates, and Levels and Grids.

During a project onboarding meeting, the client provides their current BIM standards and templates to the BIM manager. The project will involve multiple consultants across different regions and is being delivered under a fast-track schedule with a high volume of design iterations. The client has also indicated that they plan to use a new collaboration platform not previously piloted on similar project types.

The BIM manager must evaluate whether the client’s materials are sufficient and aligned with digital-delivery expectations, collaboration goals, and coordination requirements.

Given these factors, which two of the client’s BIM resources must be prioritized for review to evaluate their ability to support digital delivery and coordination across regions, teams, and time constraints? (Select two.)

A.

Confirm that shared-parameter files and naming conventions are consistent across provided templates and documentation to support data consistency.

B.

Review the provided project templates to confirm whether units, naming conventions, and view organization are consistent and support coordination.

C.

Prioritize identifying which users from the client’s team will need Revit training or software access before the project begins.

D.

Review previous projects’ sample sheets and title blocks to assess the visual style preferred by the client.

E.

Confirm whether the templates allow full customization by each discipline so teams can adapt the setup to their own preferences.

A government facility project requires unique data formatting and export requirements that comply with a global data-management initiative. A workflow utilizing a newly released add-on tool is developed to perform this task.

How should a BIM manager define training and ensure the appropriate staff receive it?

A.

Create training tutorials for the unique tasks and assign them to the members whose roles are responsible for the tasks.

B.

Develop a full training curriculum and assign all members of the project team, regardless of role.

C.

Assign the task to the team and provide training to any user whose Journal reveals a crash.

D.

Review each project model at milestone deliveries and assign the team training on items that fail the quality-control review.

A Revit model has become very slow for the team immediately after a regularly scheduled file distribution across all disciplines.

What two steps can the BIM manager take to review issues across the connected files? (Select two.)

A.

Flatten all elements in a linked model and reload the link.

B.

Remove all linked files and relink them, reviewing Task Manager during each action.

C.

Open the model using Specify Worksets to validate that the issue is isolated to the updated linked files.

D.

Review and fix all warnings appearing in linked models from consultants.

E.

Check the Manage Links panel for file paths that may be creating access issues for team members.

A BIM manager is preparing to share a federated model package with an external cost estimator. The estimator only needs access to quantities and location-based metadata, but not design intent or proprietary elements from other teams.

What is the first step the BIM manager should take to ensure appropriate use and minimize data-related risk?

A.

Export the models as PDFs to prevent the third party from modifying geometry.

B.

Confirm that the model content, format, and permissions match the recipient’s defined scope of use.

C.

Verify that the file sizes are small enough for email transmission.

D.

Convert the models into 2D views to avoid exposing embedded metadata.

During a model health check, a BIM manager notices that an international airport project’s models are 1 GB each. The team has not mentioned any issues, but they did miss a recent 50% Construction Documents deadline.

What should the BIM manager do?

A.

Create a separate model for sheets and ask the team to audit and compact the models every day.

B.

Proceed to check another project’s model health since the team has not mentioned any issues.

C.

Coordinate with the project team to purge the model, remove unused views, and address warnings.

D.

Assign multiple BIM managers to the project and take one week to clear every warning.

A BIM manager is running clash detection for the first time on a large retail project during the Design Development phase. After copying all the models to the coordination space on Autodesk Forma, the matrix shows no clashes among any of the models.

How should the BIM manager proceed?

A.

Add sheets to the publish settings and rerun the clash.

B.

Verify the shared coordinates for each model and republish.

C.

Continue forward on the project because there are no coordination issues.

D.

Use the project as a case study for a firm-wide presentation.

A BIM manager is preparing to onboard a group of subcontractors into Autodesk Forma for a large healthcare project. These subcontractors need access to a limited set of model files related only to interior partitions, but should not be able to view or modify structural, MEP, or scheduling content.

What two actions should the BIM manager take to manage data security in this scenario? (Select two.)

A.

Create and share a Package with specific set-up content.

B.

Provide access to the entire model set but watermark any non-applicable content.

C.

Assign full project access and ask team leads to verbally explain access limitations.

D.

Hide coordination issues from the subcontractors to limit liability.

E.

Assign role-based permissions and folder-level access aligned with the subcontractors’ scope.

For a project that is well into its Design Development phase, it is discovered that there is an easement on the property that increases the setback by 1 ft 6 in. (450 mm).

Which method for updating the geolocation of the project would be least disruptive to the extended design team?

A.

Specify coordinates at a point along the setback edge using the new data.

B.

Reposition the civil site property-boundary resource file, then publish the new position coordinates to the civil file.

C.

Select all model elements in a 3D view and move them away from the increased setback boundary.

D.

Reset coordinates, reposition the site property-boundary resource file, then acquire coordinates from the repositioned civil file.