Prepare effectively for your CMAA Construction-Manager Certified Construction Manager (CCM) certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 1 / 1
Total 65 questions

When applying BIM to a project, which method checks for interferences by searching for intersecting volumes?

A.

BIM Integration

B.

Parametric Modeling

C.

Virtual Design and Construction (VDC)

D.

Clash Detection

Which of the following would MOST likely help provide benchmarking for a sustainable project?

A.

Environmental Protection Agency

B.

Department of Transportation

C.

Energy Star program

D.

Housing and Urban Development

Lifecycle analysis of a project will provide the greatest impact during which of the following phases?

A.

Pre-Design

B.

Design

C.

Construction

D.

Procurement

A CM is providing support on a $150 million construction project. The agency has a well-developed safety program; however, the contractor is planning to use an innovative, high-risk method for constructing the project. To minimize the owner's risk, the CM should recommend that the owner

A.

modify the CM contract to include safety management to protect the owner's interests.

B.

provide a safety coordinator to perform the necessary project safety functions on behalf of the contractor.

C.

have the contractor submit a safety management plan for review and approval by the owner.

D.

ensure they have a contractor-controlled insurance program (CCIP) to cover the safety risk for the project.

A CM team on a new project which is in the pre-design phase is planning their climate resiliency strategy. Which of the following is the team's BEST first step in this process?

A.

Collect relevant data and reports.

B.

Establish a third-party certification.

C.

Establish QA/QC specifications.

D.

Hire a commissioning agent.

When applying Business Intelligence (also known as data mining) to manage large volumes of construction project data, the source data must

A.

first exist in hard copy format.

B.

include advanced algorithms.

C.

first exist in digital format.

D.

include outliers and missing data.

A dispute arises during construction after the contractor encounters what they feel is unsuitable material. The CM is not notified about the areas of concern, and the contractor hauls 10.000 cy of material offsite. Three months later, the contractor submits a claim for additional cost to haul the material off. The CM should advise the owner that

A.

the owner should pay for the haul.

B.

the claim is not valid because the contractor failed to provide timely notice.

C.

the owner should pay the claim due to lack of owner information.

D.

the owner should pay 50% of the haul since the contractor did not notify the CM first.

Which of the following statements BEST describes the recommended approach CMs should take with respect to building information modeling (BIM)?

A.

The CM should assure the owner has considered using BIM.

B.

The CM should not recommend the use of BIM.

C.

The CM should require the owner to use BIM.

D.

The CM should not discuss BIM unless requested by the owner.

Which of the following is a key element of a safety culture?

A.

Time is of the essence

B.

Maximizing profit

C.

Prompt accident notification

D.

Ownership and management buy-in

An agency CM is assigned to a new construction project using the CMAA A-2 Standard Form of Agreement between owner and contractor. The project is experiencing concurrent critical path delays caused by the contractor and the architect. What is the BEST guidance the agency CM could give the owner for dealing with these events?

A.

The owner should plan for delayed completion.

B.

Direct both the architect and GC to mitigate each delay and have the agency CM perform a schedule impact analysis to allocate delay responsibility.

C.

The architect and GC should be directed to add resources to mitigate each of their delays at no additional cost to the owner.

D.

The owner should charge the contractor daily liquidated damages.

During the design phase of a CM agency project, the designer submits several design options for the stakeholders to review and provide input on. Whose responsibility is it to ensure that the stakeholders are able to provide input on the designs?

A.

Owner

B.

Designer

C.

Commissioning agent

D.

CM

= P × [(C + T + Q) + 3]

P is Probability

C is Cost

T is Time

Q is Quality

This equation best describes a(n)

A.

overall risk score.

B.

cost time quality evaluation.

C.

risk variable score.

D.

Monte Carlo simulation equation.

A written safety program should include all applicable laws, codes, and regulations, and must

A.

be approved by the Owner.

B.

be developed by the CM.

C.

meet the contractual requirements.

D.

be a shared responsibility with the project team.

A project manager is working on a new transit station project. This client has never used an agency CM before. The project manager wishes to engage the client in defining the scope, budget, schedule, environmental conditions, and basic systems to be utilized. Which of the following would be MOST useful in engaging the client and defining the project requirements?

A.

Quality Management Plan

B.

Project Procedures Manual

C.

Kickoff Partnering Meeting

D.

Project Management Plan

As the owner's rep, a CM is providing on-site construction management services to a municipality for their new design-build city mall project.

The state requires a 40-hour value engineering workshop for all projects over $10 million. What are the key talking points about the VE process that the CM will highlight to the city's director of public works?

A.

Life cycle and maintenance costs should not be considered.

B.

A multi-discipline review on functions and alternate solutions.

C.

Scope reduction will reduce overall project budget.

D.

Interface with the design-build team is not needed at this time.

The chief estimator for a construction company is asked to provide an estimate based on known project characteristics, such as square footage and unit prices. The estimator will MOST likely be employing which technique?

A.

Conceptual Estimating

B.

Parametric Estimating

C.

Bottom Up Estimating

D.

Analogous Estimating

The narrative accompanying a CM-developed construction cost estimate during the design phase should include which of the following?

A.

Written confirmation of verbal data and assumptions made

B.

Suggestions for value management of building systems and other opportunities for savings

C.

CM's recommendation of improvements to specifications and quality of materials

D.

Means and methods of construction

The current construction market is extremely busy, and the trade/sub-contractors are being very selective in the projects they bid on. What options do owners have when the marketplace is vastly different from when their project was a concept to when its ready to be advertised?

A.

Market conditions should not be a factor in when a project is advertised.

B.

Postpone advertising for one year.

C.

Advertise the project and award to lowest bidder.

D.

Consider the impacts of current market conditions and revise project strategy.

When the CM assists the owner in prequalifying, evaluating, or screening potential contractors, especially as it relates to safety programs, the CM should evaluate the contractor's lost time frequency rate; lost time severity average; OSHA 200; OSHA 300; experience modification rate; and an up-to-date list of any OSHA citations issued to them in the last three years, including the disposition of each citation. This is important because:

A.

a contractor with a poor safety record may increase the owner's risk and worker compensation costs.

B.

a contractor with a poor safety record is likely to be a low bidder.

C.

contractors only monitor safety if they understand the owner's emphasis on safety.

D.

extensive documentation is required to demonstrate sufficient due diligence.