Prepare effectively for your Exin CDCS EXIN EPI Certified Data Centre Specialist certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.
When shielding material reaches its saturation point, what will be the impact?
What precaution shall be taken for cabling leading into an equipment rack when a data center is in a seismic-prone area?
You have three UPS systems connected in parallel. The UPS systems have an imbalance in the load sharing of approximately 20%.
What should you recommend?
You want to make cooling more effective by setting cold aisle temperature to 4 °C (39 °F). Is this acceptable?
What is the floor loading requirement for a Rated-3 data center according to ANSI/TIA-942?
What is a disadvantage of hypoxic-based fire suppression?
The noise levels in the data center are approximately 91 dB (A).
Do employers need to take precautions?
What is a significant difference between a halocarbon gas-based fire suppression system and an inert gas-based fire suppression system?
What is the advantage of using Multi-fiber Push-On (MPO) connectors?
Can you install a raised floor tight to the perimeter of the room?
In which stage of the data center life cycle does commissioning take place?
The temperature in the computer room is increased from 18 °C (64 °F) to 27 °C (81 °F). What is the impact on the amount of gas required to suppress a fire assuming a halocarbon agent?
What is a potential disadvantage of using a hypoxic-based fire suppression system as a fire extinguishing system?
A data center requires an audit for ANSI/TIA-942 Rated-3 compliance. Will the network architecture be part of this audit?
What is the advantage or disadvantage of using MPO (Multi-fiber Push On)/pre-terminated fiber?
You are installing new copper cabling.
What is the advantage or disadvantage of choosing pre-terminated category 6 or 6A cabling?
The logical overview of the data center looks as pictured below. To what TIA-942 Rating is this design made based on electrical only?
What indicates the breaking capacity of a fuse or breaker?
A data center scores Rated-3 in mechanical, Rated-4 in electrical, and Rated-2 in telecommunications. What is the overall rating?
What should be implemented when an Inergen-based fire suppression system is installed in the computer room?