Prepare effectively for your GAQM CDCP-001 Certified Data Centre Professional (CDCP) certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 1 / 1
Total 40 questions

is the degree to which a system or component is operational and accessibility when required for use.

A.

Scalability

B.

Agility

C.

Reliability

D.

Availability

Which source is used in fiber cable to transmit data?

A.

Signals

B.

Electric

C.

Light

D.

Pulse

True or False: Equipment Failure can pose significant threat to Reliability.

A.

True

B.

False

Which one of the following is the last stage in Stages of Combustion?

A.

Visible Smoke

B.

Intense Heat

C.

Incipient

D.

Flaming Fire

True or False: Equipment Failure can occur from Humidity.

A.

True

B.

False

Which type of Humidifier rapidly vibrates waster to create a fog or mist?

A.

Infrared Humidifier

B.

Water Canister Humidifier

C.

Steam Canister Humidifier

D.

Ultrasonic Humidifier

Measuring "Business Values" begins first with.

A.

Physical Infrastructure

B.

Topology

C.

Network

D.

Budget

Which one of the following represents the three elements (oxygen, heat and fuel) to interact in order for the fire to exist?

A.

The Fire Hexagon

B.

The Fire Class

C.

The Fire Triangle

D.

The Fire Technology

The three elements of the fire triangle are,and. (Choose three.)

A.

Oxygen

B.

Earth

C.

Heat

D.

Water

E.

Fuel

Which one of the following is a factor that can affect Availability and Reliability?

A.

Inadequate Cooling

B.

Employee Salaries

C.

Radio Active Waves

D.

Attenuation

Which one of the following does a Physical Infrastructure consists of in a Data Centre?

A.

Hub

B.

Switch

C.

Rack

D.

Server

The expected time to Recover/Repair from a system from a failure is defined as.

A.

MTBF

B.

MCBF

C.

MLBF

D.

MTTR