Month End Sale - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmaspas7

Easiest Solution 2 Pass Your Certification Exams

CLSSBB GAQM Certified Lean Six Sigma Black Belt (CLSSBB) Free Practice Exam Questions (2025 Updated)

Prepare effectively for your GAQM CLSSBB Certified Lean Six Sigma Black Belt (CLSSBB) certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 3 / 6
Total 357 questions

Ratio and Interval Scale of measurements are based on ______________type of data.

A.

Discrete & Attribute

B.

Discrete & Continuous

C.

Variable & Continuous

D.

Continuous & Attribute

This QFD matrix was used in the design process for a ball point pen. What symbol is appropriate for the square labeled 16?

A.

B.

C.

D.

none of the above

When a team consists of five black belts and eight quality engineers, how many unique meetings could be held consisting of one black belt and two quality engineers?

A.

40

B.

80

C.

140

D.

280

Find Cp

A.

2.00

B.

0.56

C.

1.33

D.

0.44

A correct statement about the relationship between the terms parameter and statistic is:

A.

a population statistic is more accurate than a parameter

B.

a sample parameter is used to estimate a statistic

C.

a sample statistic is used to estimate a population parameter

D.

standard deviation calculations requires both statistics and parameters

A complex system has many causes and effects. These may be illustrated on which of the following:

A.

matrix diagram

B.

cause and effect diagram

C.

process decision program chart

D.

affinity diagram

E.

activity network diagram

F.

tree diagram

G.

prioritization matrix

Poka-yoke is best defined as

A.

improving machine efficiency

B.

reducing field failures to virtually zero

C.

capturing the voice of the customer

D.

preventing controllable defects

Which of the following is most important in evaluating and understanding design intent?

A.

Identifying the functional requirement

B.

Brainstorming failure modes

C.

Conducting computer simulations

D.

Developing FMEA

Which of the following tools is used extensively in quality function deployment (QFD)?

A.

Affinity diagram

B.

Matrix diagram

C.

Cause and effect diagram

D.

Activity network diagram

A robust design is one which:

A.

has high reliability

B.

has low maintenance frequency

C.

is simple to manufacture

D.

is resistant to varying environmental conditions

Which of the following techniques is NOT effective when a team leader is giving feedback to the team?

A.

Describing the behavior in context

B.

Describing the reasons for giving feedback

C.

Giving feedback when it is convenient

D.

Providing actionable guidance

For a normal distribution, two standard deviations on each side of the mean would include what percentage of the total population?

A.

47%

B.

68%

C.

95%

D.

99%

A measurement system analysis is designed to assess the statistical properties of?

A.

gage variation

B.

process performance

C.

process stability

D.

engineering tolerances

One of the metrics commonly used in Lean Six Sigma is DPU. This acronym stands for ___________________.

A.

Date per usage

B.

Deferred planned usage

C.

Decreased production utilization

D.

Defects per unit

A black belt plans to test the performance of workers before and after training. Which of the following hypothesis tests should be used to determine whether the training actually improved the workers’ performance?

A.

2-sample z test

B.

2-sample t test

C.

Paired t test

D.

F test

In regression analysis, which of the following techniques can be used to reduce the higher-order terms in the model?

A.

Large samples

B.

Dummy variables

C.

Transformations

D.

Blocking

According to Juran, when a major quality improvement project is launched, which of the following describes the desired change in performance level?

A.

Six sigma

B.

Continuous

C.

Breakthrough

D.

Sporadic

At a particular time, three components are in series and each has a reliability of 0.98. What is the reliability of the system?

A.

0.98

B.

0.94

C.

0.37

D.

0.26

E.

none of the above

The statistics that summarize a population are referred to as?

A.

categorical statistics

B.

descriptive statistics

C.

probabilistic statistics

D.

control statistics

Critical to Quality parameters are derived from?

A.

Voice of Customer

B.

Measure of central tendency

C.

Data dispersion diagrams

D.

Regression analysis

Page: 3 / 6
Total 357 questions
Copyright © 2014-2025 Solution2Pass. All Rights Reserved