Month End Sale - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmaspas7

Easiest Solution 2 Pass Your Certification Exams

CLSSGB GAQM Certified Lean Six Sigma Green Belt (CLSSGB) Free Practice Exam Questions (2025 Updated)

Prepare effectively for your GAQM CLSSGB Certified Lean Six Sigma Green Belt (CLSSGB) certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 3 / 3
Total 200 questions

Skewed, or Mixed, Distributions occur when data comes from several sources that are supposed to be the same yet are not.

A.

True

B.

False

As part of a Visual Factory plan __________ cards are created and utilized to identify areas in need of cleaning and organization.

A.

Kanban

B.

Kaizen

C.

Poke-Yoke

D.

WhoSai

The purpose of a Process Map is to identify the complexity of the process and to record all actions and decision points in the process.

A.

True

B.

False

If a process has Outliers which pair of charts is most preferable if subgroups will exist for the Continuous Data?

A.

Individual-Moving Range

B.

Xbar-R Charts

C.

Xbar-S Charts

D.

nP and P Charts

Which statement(s) are correct for the Regression Analysis shown here? (Note: There are 2 correct answers).

A.

This Regression is an example of a Multiple Linear Regression.

B.

This Regression is an example of Cubic Regression.

C.

%Cu explains the majority of the process variance in heat flux.

D.

Thickness explains over 80% of the process variance in heat flux.

E.

The number of Residuals in this Regression Analysis is 26.

Multiple Linear Regressions (MLR) is best used when which of these are applicable? (Note: There are 3 correct answers).

A.

Non-linear relationships between the inputs X’s and output Y

B.

Uncertainty in the slope of the linear relationship between an X and a Y

C.

Relationships between Y (output) and more than one X (Input)

D.

Preventing the use of a Designed Experiment if unnecessary

E.

We assume that the X’s are independent of each other

The reason(s) for not marking the customer Specification Limits (SL) on a Control Chart is which of these? (Note: There are 4 correct answers).

A.

Process control teams should not control a process based on SLs

B.

Displaying the SLs on a Control Chart sends a wrong signal toward process control

C.

Marking the SLs on a Control Chart is against the principle of charting

D.

By marking the SLs, one can confuse the operator as to what limits are critical

E.

By using mere Control Limits the process only needs to be in Statistical Control

A primary benefit of using a Multi-Vari Chart is it provides a visual presentation of two-way interactions.

A.

True

B.

False

Voice of the Customer is a Lean Six Sigma technique to determine __________________ attributes of a product or service.

A.

At least 6

B.

The profitable

C.

Critical-to-Quality

D.

The majority of the

Inferential Statistics is largely about Significance. There are both Practical and _______________ Significance to consider during an analysis of data in a Lean Six Sigma project.

A.

Problematic

B.

Impractical

C.

Usable

D.

Statistical

The Six Sigma methodology had its origins at __________________ in the late 1980’s when William Smith coined the name for quality related work being done there.

A.

Motorola

B.

Allied Signal

C.

General Electric

D.

Honeywell

When constructing a Fishbone Diagram using the ________ approach is the most classic arrangement.

A.

6M

B.

4M

C.

5M

D.

Alphabetical

The Standard Deviation for the distribution of Means is called the ___________ and approaches zero as the sample size reaches 30.

A.

Standard Error

B.

Mean Deviation

C.

Mean Spread

D.

Mean Error

A Belt experienced an Alpha of .05 and a Beta of .10 and knew these are the most common risk levels when running a Statistical test.

A.

True

B.

False

Bias in Sampling is an error due to lack of independence among random samples or due to systematic sampling procedures.

A.

True

B.

False

Non-parametric testing is done when which of these are applicable? (Note: There are 3 correct answers).

A.

When the traditional t tests don’t produce the results we need

B.

A Hypothesis Test for the Median of the population is in question

C.

It does not require data to come from Normally Distributed populations

D.

They look at the Median rather than the Mean of populations

E.

When there are no parameters to measure in the process

Customers make a purchase decision based on a number of factors. In Lean Six Sigma we refer to these decision points as CTQ’s which stands for __________.

A.

Cost of the quantity

B.

Conscious thought qualities

C.

Conspicuous time quandaries

D.

Critical-to-quality

The perfect sample size is the minimum number of data points required to provide exactly 6% overlap or risk if one wants a 95% confidence level.

A.

True

B.

False

The 80:20 rule is associated with which of these tools?

A.

Pareto Chart

B.

Simon's Cross-Functional Tool

C.

SIPOC

D.

Framing Tool

A Belt concludes a Lean Six Sigma project with the creation of a Control Plan. At what point can the Control Plan be closed?

A.

Never, a Control Plan is a living document

B.

As soon as the Champion signs off

C.

Within 30 days of the LSS project review team meeting

D.

After the project has been presented at the recognition event

Page: 3 / 3
Total 200 questions
Copyright © 2014-2025 Solution2Pass. All Rights Reserved