Winter Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: s2p65

Easiest Solution 2 Pass Your Certification Exams

HQT-4180 Hitachi Vantara Qualified Professional - VSP Midrange Family Installation Free Practice Exam Questions (2026 Updated)

Prepare effectively for your Hitachi HQT-4180 Hitachi Vantara Qualified Professional - VSP Midrange Family Installation certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2026, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 1 / 1
Total 35 questions

Your customer wants to connect multiple servers to a new port on a VSP G700. The correct topology has already been set for the port.

What should you do next?

A.

Enable Port Security.

B.

Enable Host Group security.

C.

Create a Host Group.

D.

Scan for all WWNs.

You need to replace a broken disk drive on a VSP G700.

What are two prerequisites? (Choose two.)

A.

You must use the Replace button in the Maintenance Utility before removing the drive.

B.

You must wear a wrist strap for ESD protection.

C.

The red LED on the drive must be lit.

D.

The Drive Box where the drive is located must be powered down.

What are two consequences when a “New Installation” procedure is performed on a VSP Midrange system? (Choose two.)

A.

The SVP drive is formatted.

B.

The MPC software is updated.

C.

All the data on RAID groups is lost.

D.

The license keys are deleted.

A customer wants to change a production RAID group from RAID 5 (7D+1P) to RAID 6 (6D+2P) on a VSP G600 during normal operations. They have just unmapped the LUNs from the channel ports.

What needs to be performed next?

A.

Parity groups must be deleted.

B.

The RAID level must be changed in Storage Navigator.

C.

The RAID level in the SVP Maintenance window must be changed.

D.

The RAID 5 group must be put into DRU mode in Storage Navigator.

Which tool can be used to change System Option Modes (SOMs)?

A.

Hitachi Ops Center

B.

Webconsole

C.

HSAe

D.

MPC software

Which tool is used for the remote monitoring of a VSP N800 system?

A.

Hitachi Remote Ops SVP Agent

B.

Hitachi Remote Ops Monitor Agent

C.

MPC Software

D.

Hitachi Performance Monitor

A drive in a 3D + 1P RAID group fails in a VSP G700 and there is no spare drive available.

Which two actions are automatically performed by the system? (Choose two.)

A.

An alert is generated.

B.

Dynamic Sparing is started.

C.

The Correction Copy process starts.

D.

The RAID group is placed in Correction Access.

How many batteries does a VSP E1090 have per controller (CTL)?

A.

1

B.

2

C.

3

D.

4

Which program is used to perform the “New Installation” procedure on a VSP midrange system?

A.

MPC

B.

Webconsole

C.

GUM

D.

BECK

You are installing a new VSP G700 and are using the Initial Setup Wizard (ISW) for the network configuration.

Which set of IP addresses is configured with the ISW?

A.

IP addresses of maintenance ports

B.

IP addresses of management ports

C.

IP addresses of all the ports

D.

IP addresses of all the ports and of the SVP

Page: 1 / 1
Total 35 questions
Copyright © 2014-2026 Solution2Pass. All Rights Reserved