Weekend Sale - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmaspas7

Easiest Solution 2 Pass Your Certification Exams

HQT-4420 Hitachi Vantara Qualified Professional - Content Platform Installation Free Practice Exam Questions (2025 Updated)

Prepare effectively for your Hitachi HQT-4420 Hitachi Vantara Qualified Professional - Content Platform Installation certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 1 / 1
Total 34 questions

You are preparing to perform an offline upgrade on an HCP G10 and the pre-upgrade check procedure fails. The error message says that you do not have enough capacity on node 103 to perform the upgrade.

Which service procedure should you run to resolve this problem?

A.

Recover an HCP Node

B.

Free Space On Nodes

C.

Install a Hotfix

D.

Change Region Count

How should the RAID group(s) and logical volume(s) be configured on an HCP G10 node with six internal drives?

A.

a single RAID group with a single logical volume

B.

a single RAID group with three logical volumes.

C.

three RAID groups each with a single logical volume

D.

three RAID groups each with three logical volumes

When do you need to check the BIOS configuration on an HCP G10 node?

A.

when replacing an entire node

B.

when upgradingthe HCP software version

C.

when replacinga HBA

D.

when replacing a failed hard disk drive

What is the maximum number of drives supported in one HCP S10 enclosure?

A.

24

B.

30

C.

60

D.

128

Which two VMware deployment packages are supported by HCP systems running v7.2 or later? (Choose two.)

A.

HCP VMware edition

B.

HCP VMware edition with S10 VM

C.

HCP VMware evaluation edition

D.

HCP VMware with SAN option

You are installing an HCP G10 with attached storage. A VSP G1000 is used to provision the storage and is used by several applications.

Which action should be performed?

A.

Shutdown the applications that use the VSP G1000

B.

Enable shared storage optimization in the System Management Console

C.

Enable the shared storage option on the G10 HBA

D.

Specify that shared storage is used when prompted by the installation program

Which two ports on an HCP G10 node are used for back-end network connection"? (Choose two.)

A.

eth0

B.

eth1

C.

eth2

D.

eth3

After adding new nodes to an HCP G10 system, which two actions should be performed? (Choose two.)

A.

Upgrade the new nodes software

B.

Run the capacity balancing service

C.

Adjust the region count

D.

Reboot all the new nodes

You are installing an HCP G10 and are now setting the front-end connectivity. The customer has provided you with IP addresses for their network for each node.

Which two actions should be performed on each node as part of the OS installation? (Choose two.)

A.

Set the BMC IP address

B.

Set the NTP IP address(es)

C.

Set the front-end IP address

D.

Set the gateway IP address

How is the software update package uploaded to an HCP S10?

A.

using BMC

B.

usingan SFTP connection

C.

usingan SSH connection

D.

using the Management Console

Page: 1 / 1
Total 34 questions
Copyright © 2014-2025 Solution2Pass. All Rights Reserved