Prepare effectively for your Huawei H19-105_V2.0 HCSA-Sales-Data Center Facility V2.0 certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2026, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 1 / 1
Total 60 questions

Is the following statement true or false?

Huawei Certified Partner Instructors (HCPIs) are individuals who have passed the Huawei Digital Power specialist certification exam and are employed by Huawei authorized partners.

A.

True

B.

False

What is the general air supply mode used by a fanwall solution?

A.

Downstream air supply

B.

Horizontal air supply

C.

Upstream air supply

Which of the following statements correctly describe the application scenarios of the Huawei smart modular data center solution?

Select all that apply

A.

FusionModule500 applies to one to two cabinets. The IT load power of a single module is less than 3 kW.

B.

FusionModule2000 applies to 4 to 48 cabinets. The IT load power of a single module is less than 310 kW.

C.

FusionModule5000 applies to 50 to 100 cabinets. The IT load of a single module is less than 1000 kW.

D.

FusionModule800 applies to 1 to 12 cabinets. The IT load of a single module is less than 40 kW.

How does Huawei SmartLi 3.0 ensure reliability?

Select all that apply

A.

Pack fire extinguishing solution.

B.

Redundant monitoring system to prevent single points of failure.

C.

Cell material is LFP, which has stable structure and has passed needle test, during thermal runaway there is no oxygen generation.

D.

Three-layer BMS management that identifies risks at the system level, cabinet level, and pack level.

Which of the following are components included in the QMS model?

Select all that apply

A.

Process operations

B.

Leadership

C.

Performance appraisal

D.

Planning

Which roles are part of the SQA LBPGP role model?

Select all that apply

A.

Safety and quality requirement practitioner

B.

Safety and quality result guardian

C.

Continuous improvement pusher

D.

Safety and quality culture builder

In a large-scale water-cooled chilled water data center, how many key parameters is Huawei iCooling capable of sampling?

A.

500 +

B.

600 +

C.

800 +

D.

700 +

An indirect evaporative cooling solution supports multiple operating modes that can switch automatically depending on cooling demand as well as the ambient temperature and humidity, in order to make the best use of natural cooling sources. Which of the following are typical operating modes?

Select all that apply

A.

Hybrid mode

B.

Dry mode

C.

Spray mode

D.

Direct ventilation mode

In the fan wall solution, which of the following components support hot-swap maintenance?

Select all that apply

A.

EC fan

B.

Main control module

C.

Fan drive module

D.

Power module

What credentials or prerequisites must a worker have before performing work at heights?

A.

No qualifications required.

B.

Working at heights after completing related training.

C.

Working at heights only after completing related training and obtaining the Work at Heights Permit.

D.

If the task is urgent, you can work at heights without completing the related training.

iSitePower-S can supply customers with uninterruptible power. The power-off switchover time is less than ( ___ ) ms, with no interruption to the service.

A.

10

B.

15

C.

25

D.

20

The hardware clamping patent is one of the core technologies that enables the PowerPOD 3.0 S-ECO mode to achieve 0 ms switching from normal mode to battery mode. This technology is also referred to as the "3 zero" technology.

Which of the following descriptions are correct?

Select all that apply

A.

0 delay: no inverter start delay and no communication delay

B.

0 waiting: no waiting for the mains detection and zero-crossing of the mains

C.

0 current: zero current hot backup

D.

0 voltage: zero-voltage hot backup

Within the Digital Power BU global partner policy framework, which of the following are considered part of the partner policies?

Select all that apply

A.

Partner operation policies

B.

Capability development policies

C.

Partner development policies

D.

Partner registration policies

E.

Incentive and support policies

F.

Partner policy outline

Regarding the Huawei smart modular module solution, which of the following statements are correct?

Select all that apply

A.

FusionModule800 and FusionModule500 integrate cooling and electrical control. They are highly integrated and fully prefabricated, featuring a fully enclosed aisle with wet-film humidification and supporting smart mobile management.

B.

Huawei FusionModule800 is a modular data center solution designed for financial outlets and small enterprise data centers. It is easy to deploy, clean, and reliable, and can perfectly meet the application requirements of these scenarios.

C.

The FusionModule2000 adopts the simplified design concept. It has low footprint and high requirements on low floors. It does not require raised floors. It supports modular deployment and supports one-click commissioning. The implementation time is shortened from 30 days to 7 days.

D.

In the FusionModule800 and FusionModule500, fire extinguishers can be deployed in the fire extinguishing module. The built-in fire extinguishing gas can meet the fire extinguishing requirements of the entire room.

fire/accident at Data Center A caused widespread disruption to network services, including a widely used chat application and a major e-commerce platform, with outages lasting more than 24 hours. About 32,000 servers went down, affecting the services of tens of millions of users. In response, the country's president issued a public apology for the disruption to the online platforms.

Is this statement true or false?

A.

True

B.

False

According to the certificate replacement rule for sales partners, one HCSP certificate can be replaced by two HCSA certificates within the same certification direction. Once the certificate has been replaced by the two HCSA certificates, the original HCSP certificate is no longer considered valid.

Is this statement true or false?

A.

True

B.

False

Which of the following partner types are required to sign a framework agreement with our company once the certification decision has been made?

Select all that apply

A.

VAP

B.

Gold reseller

C.

Silver Dealer

D.

Distributor

True or False: Compared with a traditional switch, the load switch used in the PowerPOD 3.0 has its width reduced by 80%.

A.

True

B.

False