Prepare effectively for your International Code Council M2 Commercial Mechanical Inspector certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2026, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 1 / 1
Total 50 questions

Exhibit:

What hp is EF-2?

A.

1/2

B.

1

C.

1.5

D.

2

Indoor combustion air shall be provided within:

A.

1 foot of the ceiling and 1 foot of the floor.

B.

1 foot of the ceiling and 2 feet of the floor.

C.

2 feet of the ceiling and 1 foot of the floor.

D.

2 feet of the ceiling and 2 feet of the floor.

Floor furnaces shall not be closer than _____ inches to the ground.

A.

[option text not fully visible in the material you sent]

B.

[option text not fully visible in the material you sent]

C.

[option text not fully visible in the material you sent]

D.

12

Shutoff valves in plastic pipe ground-source heat pump loop systems shall be installed on both sides of which one of the following?

A.

Expansion tanks

B.

Heat-fusion joints

C.

Change-in-material joints

D.

Pressure-reducing valves

Air mechanically exhausted from a room must be:

A.

filtered.

B.

recirculated.

C.

discharged into the attic.

D.

discharged to the outdoors.

The minimum dimension for rectangular air ducts used to supply combustion air for natural draft systems is _____ inches.

A.

2

B.

3

C.

4

D.

6

For the installation of listed fuel-burning appliances, the required clearances should be found:

A.

in the mechanical code.

B.

on the nameplate of the appliance.

C.

on the approved plans and specifications for the building.

D.

by using a calculation based on the Btu/h output rating of the appliance.

Where located on a roof with a 5:12 slope, a level platform shall be provided along the access panel of the furnace at least _____ inches wide.

A.

[option text not fully visible in the material you sent]

B.

24

C.

30

D.

36

Given: a six-story, sprinklered, multifamily building with a continuously ventilated shaft extending vertically from the first floor to the roof and used for exhaust.

Which of the following requirements must also be met?

A.

kitchen exhaust that penetrates the shaft without a fire damper and extends vertically 12 inches.

B.

fire dampers are installed that are connected to an emergency generator rated for 1 hour.

C.

have steel subducts with wall thickness of 0.0186 inch extending 22 inches horizontally into the shaft.

D.

kitchen exhaust that penetrates the shaft without a fire damper and extends vertically 22 inches.

Exhibit:

CEF-5 is a ceiling exhaust fan manufactured by:

A.

G.E.

B.

Carnes

C.

Markel

D.

Nutone

What type of cooking appliance is required to have its own independent hood and exhaust system?

A.

Light-duty

B.

Medium-duty

C.

Heavy-duty

D.

Extra-heavy-duty

Supports for hazardous exhaust duct shall be constructed of:

A.

plastic.

B.

fibrous material.

C.

noncombustible material.

D.

material complying with UL 181.

The minimum size for access openings for fire dampers shall be:

A.

the same as the dimension of the duct.

B.

one-half the diagonal of the access opening.

C.

adequate to permit maintenance and resetting of the damper.

D.

12 inches by 12 inches.

Horizontal terminations for mechanical draft systems that are adjacent to public walkways shall be located a minimum of _____ feet above grade.

A.

7

B.

8

C.

9

D.

10

When a permit is issued, the code requires that one set of approved plans and specifications be returned to the applicant.

This set of plans and specifications shall be:

A.

kept on the building site.

B.

returned to the architect.

C.

filed with the county clerk or jurisdiction to properly record the property.

D.

retained by the applicant for at least one year after the job is finished in the event modifications are made.

Page: 1 / 1