Prepare effectively for your PECB ISO-IEC-42001-Lead-Auditor ISO/IEC 42001:2023 Artificial Intelligence Management System Lead Auditor Exam certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.
Total 198 questions
Scenario 2 (continued):
Empsy HR Solutions is a human resources consulting company that provides innovative HR solutions to diverse industries. Recognizing the significant impact of artificial intelligence Al in HR processes, including its ability to automate repetitive tasks, analyze vast amounts of data for insights, improve recruitment and talent management strategies, and personalize employee experiences, the company has initiated the implementation of an artificial intelligence management system AIMS based on ISO/IEC 42001.
Initially, the top management established an Al policy that was aligned with the company's objectives. The Al policy provided a framework for defining Al objectives, a commitment to meeting relevant requirements, and a dedication to continually improve the AIMS. However, it
did not refer to other organizational policies, although some were relevant to the AIMS. Afterward, the top management documented the policy, communicated it internally, and made it accessible to interested parties.
The top management designated specific individuals to ensure that the AIMS meets the standard's requirements. Additionally, they ensured that these individuals were responsible for overseeing the AIMS, reporting its performance to the top management, and facilitating continual improvement. Moreover, in its awareness sessions, the company focused exclusively on ensuring that all personnel
were informed about the Al policy, emphasizing their role in ensuring the effectiveness of the AIMS and the benefits of enhanced Al performance.
The company also planned, implemented, and monitored processes to meet AIMS requirements. Additionally, it set clear criteria and implemented controls based on them, ensuring effective operation, alignment with organizational objectives, and continual improvement. Empsy HR Solutions decided to implement strict measures to control changes to documented information within the AIMS. To ensure the integrity and accuracy of documentation, the company adopted version control practices. Each document update was tracked using a versioning system, with clear records of what was modified, who made the changes, and when the updates occurred. Access to make changes was restricted to authorized personnel, and any proposed modifications required approval from the designated management team before being implemented.
Moreover, considering past experiences where the company encountered unforeseen risks, Empsy HR Solutions established a comprehensive Al risk assessment process. This process involved identifying, analyzing, and evaluating Al risks to determine if it is necessary to implement additional controls than those specified in Annex A. The company also referred to Annex B for guidance on implementing controls and, ultimately, produced a Statement of Applicability So A. The SoA contained the necessary controls, including all the controls of Annex A and justifications for their inclusion or exclusion.
Lastly. Empsy HR Solutions decided to establish an internal audit program to ensure the AIMS conforms to both the company's requirements and ISO/IEC 42001. It defined the audit objectives, criteria, and scope for each audit, selected auditors, and ensured objectivity and impartiality during the audit process. The results of the first audit were documented and reported only to the top
management of the company.
Question:
Does the company's implementation of version control practices for documented information align with the requirements of ISO/IEC 42001?
Based on Scenario 4, the audit team employed the same level of effort and techniques across all audit areas. Is this recommended?
Scenario 4: Finalogic leads the application of artificial intelligence in the financial services sector, which is used to improve risk assessment, fraud detection, and
customer service. The company has implemented an artificial intelligence management system AIMS based on ISO/IEC 42001 to ensure operational quality, ethical Al
use, regulatory compliance, and transparency, allowing for consistent oversight and structured governance.
This month, Finalogic is undergoing an audit to obtain certification against ISO/IEC 42001, a critical step in demonstrating its commitment to responsible Al. To
evaluate Finalogic's conformity to the audit criteria, the audit team adopted a comprehensive, evidence-based approach. The gathered evidence ranged from analyses
of unquantifiable information to analyses of samples related to determining the audit criteria-including internal reports generated by Finalogic's own Al system-which
assert successful integration and compliance with the standard.
Additionally, presentations by the company’s Al team during the audit highlighted the system’s success in customer service enhancements and fraud detection,
emphasizing improved efficiency, decision making accuracy, and user trust. An evaluation report prepared by an independent third party firm specializing in Al systems
also provided an objective review of Finalogic's AIMS. It assessed the system's effectiveness, bias, and compliance through a thorough examination.
During the audit, the audit team applied the same level of effort and utilized the same techniques across all audit areas, regardless of their risk level. This strategy
ensured a consistent and thorough evaluation of the AIMS, uncovering any latent weaknesses or inefficiencies that might otherwise go unnoticed.
Despite Finalogic's advanced AIMS and adherence to ISO/IEC 42001 for ethical Al practices, there remains a risk of Al algorithms inadvertently perpetuating bias or
making inaccurate predictions due to unforeseen flaws in training data or algorithmic models. This could lead to unfair loan rejections or approvals, potentially causing
financial losses or damaging the company’s reputation for fairness and accuracy in its financial services. By acknowledging these risks. Finalogic remains committed
to refining its Al governance, implementing bias mitigation strategies, and enhancing transparency to uphold its reputation as a leader in Al driven financial services.
Scenario 7 (continued):
Scenario 7: ICure, headquartered in Bratislava, is a medical institution known for its use of the latest technologies in medical practices. It has introduced groundbreaking Al-driven diagnostics and treatment planning tools that have fundamentally transformed patient care.
ICure has integrated a robust artificial intelligence management system AIMS to manage its Al systems effectively. This holistic management framework ensures that ICure's Al applications are not only developed but also deployed and maintained to adhere to the
highest industry standards, thereby enhancing efficiency and reliability.
ICure has initiated a comprehensive auditing process to validate its AIMS's effectiveness in alignment with ISO/IEC 42001. The stage 1 audit involved an on-site evaluation by the audit team. The team evaluated the site-specific conditions, interacted with ICure's personnel,
observed the deployed technologies, and reviewed the operations that support the AIMS. Following these observations, the findings were documented and communicated to ICure. setting the stage for subsequent actions.
Unforeseen delays and resource allocation issues introduced a significant gap between the completion of stage 1 and the onset of stage 2 audits. This interval, while unplanned, provided an opportunity for reflection and preparation for upcoming challenges.
After four months, the audit team initiated the stage 2 audit. They evaluated AIMS's compliance with ISO/IEC 42001 requirements, paying special attention to the complexity of processes and their documentation. It was during this phase that a critical observation was made:
ICure had not fully considered the complexity of its processes and their interactions when determining the extent of documented information. Essential processes related to Al model training, validation, and deployment were not documented accurately, hindering effective control and management of these critical activities. This issue was recorded as a minor nonconformity, signaling a need for enhanced control and management of these vital activities.
Simultaneously, the auditor evaluated the appropriateness and effectiveness of the "AIMS Insight Strategy," a procedure developed by
ICure to determine the AIMS internal and external challenges. This examination identified specific areas for improvement, particularly in
the way stakeholder input was integrated into the system. It highlighted how this could significantly enhance the contribution of relevant
parties in strengthening the system's resilience and effectiveness.
The audit team determined the audit findings by taking into consideration the requirements of ICure, the previous audit records and
conclusions, the accuracy, sufficiency, and appropriateness of evidence, the extent to which planned audit activities are realized and
planned results achieved, the sample size, and the categorization of the audit findings. The audit team decided to first record all the
requirements met; then they proceeded to record the nonconformities.
Based on the scenario above, answer the following question:
Question:
Based on Scenario 7, for which of the following ISO/IEC 42001 clauses was the minor nonconformity issued?
Which requirement of Clause 7 (Support) of ISO/IEC 42001 did OptiFlow NOT implement? Refer to Scenario 2.
Scenario 2: OptiFlow is a logistics company located in New Delhi, India. The company has enhanced its operational efficiency and customer service by integrating AI across various domains, including route optimization, inventory management, and customer support. Recognizing the importance of AI in its operations, OptiFlow decided to implement an Artificial Intelligence Management System (AIMS) based on ISO/IEC 42001 to oversee and optimize the use of AI technologies.
To address Clauses 4.1 and 4.2 of the standard, OptiFlow identified and analyzed internal and external issues and needs and expectations of interested parties. During this phase, it identified specific risks and opportunities related to AI deployment, considering the system's domain, application context, intended use, and internal and external environments. Central to this initiative was the establishment and maintenance of AI risk criteria, a foundational step that facilitated comprehensive AI risk assessments, effective risk treatment strategies, and precise evaluations of risk impacts. This implementation aimed to meet AIMS’s objectives, minimize adverse effects, and promote continuous improvement. OptiFlow also planned and integrated strategies to address risks and opportunities into AIMS’s processes and assessed their effectiveness.
OptiFlow set measurable AI objectives aligned with its AI policy across all organizational levels, ensuring they met applicable requirements and matched the company’s vision. The company placed strong emphasis on the monitoring and communication of these objectives, ensuring they were updated annually or as needed to reflect changes in technology, market demands, or internal processes. It also documented the objectives, making them accessible across the company.
To guarantee a structured and consistent AI risk assessment process, OptiFlow emphasized alignment with its AI policy and objectives. The process included ensuring consistency and comparability, identifying, analyzing, and evaluating AI risks.
OptiFlow prioritizes its AIMS by allocating the necessary resources for its comprehensive development and continuous enhancement. The company carefully defines the competencies needed for personnel affecting AI performance, ensuring a high level of expertise and innovation.
OptiFlow also manages effective internal and external communications about its AIMS, aligning with ISO/IEC 42001 requirements by maintaining and controlling all required documented information. This documentation is meticulously identified, described, and updated to ensure its relevance and accessibility. Through these strategic efforts, OptiFlow upholds a commitment to excellence and leadership in AI management practices.
To comply with Clause 9 of ISO/IEC 42001, the company determined what needs to be monitored and measured in the AIMS. It planned, established, implemented, and maintained an audit program, reviewed the AIMS at planned intervals, documented review results, and initiated a continuous feedback mechanism from all interested parties to identify areas of improvement and innovation within the AIMS
Which of the following examples is frequent analysis?
Scenario 1 (continued):
To ensure the integrity of the AI system, Future Horizon Academy has implemented measures to ensure that training data remain isolated from data that could lead to harmful or undesirable outcomes. The institution adds significant data elements as metadata, transforms the data into a format usable by the AI system, and uses data from one or more trusted sources.
Committed to standardization and continual improvement, Future Horizon Academy decided to implement an artificial intelligence management system (AIMS) based on ISO/IEC 42001 that would help the institution increase operational efficiency, resulting in improved processes.
After having the AIMS in place for a year, the institution decided to apply for a certification audit to get certified against ISO/IEC 42001. Prior to the certification audit, the institution conducted an internal audit and management review to ensure that the AIMS aligns with the institution’s own requirements and that the system is being maintained effectively.
Question:
Based on Scenario 1, which of the following processes regarding data did Future Horizon Academy NOT conduct?
Did ImoAI take the correct initial step after the major nonconformity was detected?
Scenario 9: ImoAl, headquartered in California. USA, provides Al solutions for various industries such as finance, healthcare, retail, and manufacturing. Its clients
include major financial institutions seeking Al powered fraud detection systems, healthcare providers leveraging Al for diagnostics and patient care, retailers
optimizing supply chain management with Al forecasting, and manufacturers enhancing production efficiency through Al-driven automation.
ImoAl has recently undergone a certification audit to ensure that its artificial intelligence management system AIMS is in compliance with ISO/IEC 42001. During the
audit, a major nonconformity related to data security protocols was identified, requiring urgent resolution. ImoAl swiftly initiated corrective actions to address the
major nonconformity. The audit follow-up, in agreement with the auditee, was scheduled six weeks after the initial audit. As part of exploring alternatives to audit
follow-up, the audit team leader chose to verify the effectiveness of the actions taken by the auditee by scheduling a specific visit to ImoAI's premises.
The follow-up audit involved a thorough evaluation of the effectiveness of these actions. The audit team leader thoroughly examined the corrections, corrective actions,
and root cause analysis conducted by ImoAl to assess whether they adequately addressed the nonconformity identified during the initial audit.
In conjunction with the external audit follow-up, ImoAl engaged its internal auditing team to oversee the progress of corrective actions. The AIMS manager of ImoAl
updated Ms. Rebecca Hayes, the internal auditor, on the status of corrections and corrective actions prompted by the nonconformity identified during the external
audit. Subsequently, Ms. Hayes thoroughly reviewed these measures, analyzing the corrections, root causes, and effectiveness of the implemented actions.
Upon satisfactory validation of the action plans, ImoAl was recommended for certification.
Which core element focuses on ensuring that the creators and operators of AI systems are responsible for the outcomes and impacts of those systems?
Question:
During a combined audit, if an auditor identifies a finding linked to one criterion, should they consider its potential impact on corresponding or related criteria of other management systems?
Scenario 6 (continued):
Scenario 6: HappilyAI is a pioneering enterprise dedicated to developing and deploying artificial intelligence Al solutions tailored to enhance customer service experiences across various industries. The company offers innovative products like virtual assistants, predictive analytics tools, and personalized customer interaction platforms. As part of its commitment to operational excellence and innovation, HappilyAI has implemented a robust Al management system AIMS to oversee its Al operations effectively. Currently. HappilyAI is undergoing a comprehensive audit process of its AIMS to evaluate its compliance with ISO/IEC 42001.
Under the leadership of Jess, the audit team began the audit process with meticulous planning and coordination, setting the groundwork for the extensive on-site activities of the stage 1 audit. This initial phase was marked by a comprehensive documentation review. The audit scope encompassed a critical review of HappilyAI's core departments, including Research and Development (R&D), Customer Service, and Data Security, aiming to assess the conformity of HappilyAI's AIMS to the requirements of ISO/IEC 42001.
Afterward, Jess and the team conducted a formal opening meeting with HappilyAI to introduce the audit team and outline the audit activities. The meeting set a collaborative tone for the subsequent phases, where the team engaged in information collection, executed audit tests, identified findings, and prepared draft nonconformity reports while maintaining a strict quality review process.
In gathering evidence, the audit team employed a sampling method, which involved dividing the population into homogeneous groups to ensure a comprehensive and representative data collection by drawing samples from each segment. Furthermore, the team employed observation to deepen their understanding of the Al management processes. They verified the availability of essential documentation, including Al-related policies, and evaluated the communication channels established for reporting incidents.
Additionally, they scrutinized specific monitoring tools designed to track the performance of data acquisition processes, ensuring these tools effectively identify and respond to errors or anomalies. However, a notable challenge emerged as the team encountered a lack of access to documented information that describes how tasks about AIMS are executed. In addition to this, the team identified a potential nonconformity within the Sales Department. They decided not to record this as a nonconformity in the audit report but only communicated it to the HappilyAI's representatives.
During the stage 2 audit, the certification body, in collaboration with HappilyAI, assigned the roles of technical experts within the audit team. Recognized for their specialized knowledge and expertise in artificial intelligence and its applications, these technical experts are tasked with the thorough assessment of the AIMS framework to ensure its alignment with industry standards and best practices, focusing on areas such as data ethics, algorithmic transparency, and Al system security.
Question:
Which observation types did the audit team use to enhance their understanding of the AI management processes?
An audit team member is tasked with evaluating a sophisticated AI system used for autonomous driving. They lack the necessary expertise but proceed without consulting a specialist. Which principle is being neglected in this scenario?
Which of the following statements regarding the interested parties related to the AIMS is correct?
According to the core element of 'Privacy and Security,’ what is essential when developing AI systems?
What certification recommendation did the auditee receive?
Scenario 8: VeridicAI. based in San Francisco. USA, specializes in market research using Al technologies to analyze customer behavior. Founded in 2023, the company
employs natural language processing, machine learning, and predictive analytics to provide real time insights to a range of businesses. VeridicAI has implemented an
artificial intelligence management system AIMS based on ISO/IEC 42001 to manage its Al technologies effectively. The AIMS scope includes select departments within
the company, for which it has received a four-year certification against ISO/IEC 42001. Committed to transparency. VeridicAI publicly shares details of this certification.
As the certification nears its end, VeridicAI is preparing for an audit to renew its certification.
The audit process was led by Sharona, the audit team leader, who is a full-time employee of the certification body. Sharona and the audit team undertook all planned
audit activities. Afterward, they organized the closing meeting with VeridicAl’s management. During the meeting, Sharona and the team made a recap on audit
objectives and scope, presented the audit findings and conclusions, presented identified nonconformities, and organized a session for questions and answers for the
auditee.
VeridicAI received a conditional recommendation for certification, underscoring its compliance with the industry's standards. Sharona confirmed that the company met
the essential requirements but noted some identified minor nonconformities. In response, VeridicAI compiled and submitted a comprehensive action plan that
addresses all identified nonconformities within a designated timeframe. Because of the comprehensive action plan, Sharona did not see the need for an additional on-
site visit to verify the effectiveness of the action plan.
Sharona played an integral role in the certification decision process. Her thorough understanding of VeridicAI's operations, gained from the audit, guided the
certification body towards a well-informed certification decision.
Based on Scenario 8, did Sharona and the audit team address all essential aspects during the closing meeting?
Scenario 8: VeridicAI. based in San Francisco. USA, specializes in market research using Al technologies to analyze customer behavior. Founded in 2023, the company
employs natural language processing, machine learning, and predictive analytics to provide real time insights to a range of businesses. VeridicAI has implemented an
artificial intelligence management system AIMS based on ISO/IEC 42001 to manage its Al technologies effectively. The AIMS scope includes select departments within
the company, for which it has received a four-year certification against ISO/IEC 42001. Committed to transparency. VeridicAI publicly shares details of this certification.
As the certification nears its end, VeridicAI is preparing for an audit to renew its certification.
The audit process was led by Sharona, the audit team leader, who is a full-time employee of the certification body. Sharona and the audit team undertook all planned
audit activities. Afterward, they organized the closing meeting with VeridicAl’s management. During the meeting, Sharona and the team made a recap on audit
objectives and scope, presented the audit findings and conclusions, presented identified nonconformities, and organized a session for questions and answers for the
auditee.
VeridicAI received a conditional recommendation for certification, underscoring its compliance with the industry's standards. Sharona confirmed that the company met
the essential requirements but noted some identified minor nonconformities. In response, VeridicAI compiled and submitted a comprehensive action plan that
addresses all identified nonconformities within a designated timeframe. Because of the comprehensive action plan, Sharona did not see the need for an additional on-
site visit to verify the effectiveness of the action plan.
Sharona played an integral role in the certification decision process. Her thorough understanding of VeridicAI's operations, gained from the audit, guided the
certification body towards a well-informed certification decision.
Question:
While preparing for an AIMS audit, a technology company faced an issue: the auditor lacked a required security clearance for accessing sensitive information related to government contracts.
The company requested a replacement auditor. Is this acceptable?
Which of the following is NOT a common feature shared by AI systems?
Question:
During the annual ISO/IEC 42001 audit at a financial company, the auditor selected and analyzed a sample of 5 out of 25 follow-up nonconformity reports to assess whether the company adheres to its follow-up process. What type of evidence did the auditor gather?
Scenario 7 (continued):
Scenario 7: ICure, headquartered in Bratislava, is a medical institution known for its use of the latest technologies in medical practices. It has introduced groundbreaking Al-driven diagnostics and treatment planning tools that have fundamentally transformed patient care.
ICure has integrated a robust artificial intelligence management system AIMS to manage its Al systems effectively. This holistic management framework ensures that ICure's Al applications are not only developed but also deployed and maintained to adhere to the
highest industry standards, thereby enhancing efficiency and reliability.
ICure has initiated a comprehensive auditing process to validate its AIMS's effectiveness in alignment with ISO/IEC 42001. The stage 1 audit involved an on-site evaluation by the audit team. The team evaluated the site-specific conditions, interacted with ICure's personnel,
observed the deployed technologies, and reviewed the operations that support the AIMS. Following these observations, the findings were documented and communicated to ICure. setting the stage for subsequent actions.
Unforeseen delays and resource allocation issues introduced a significant gap between the completion of stage 1 and the onset of stage 2 audits. This interval, while unplanned, provided an opportunity for reflection and preparation for upcoming challenges.
After four months, the audit team initiated the stage 2 audit. They evaluated AIMS's compliance with ISO/IEC 42001 requirements, paying special attention to the complexity of processes and their documentation. It was during this phase that a critical observation was made:
ICure had not fully considered the complexity of its processes and their interactions when determining the extent of documented information. Essential processes related to Al model training, validation, and deployment were not documented accurately, hindering effective control and management of these critical activities. This issue was recorded as a minor nonconformity, signaling a need for enhanced control and management of these vital activities.
Simultaneously, the auditor evaluated the appropriateness and effectiveness of the "AIMS Insight Strategy," a procedure developed by
ICure to determine the AIMS internal and external challenges. This examination identified specific areas for improvement, particularly in
the way stakeholder input was integrated into the system. It highlighted how this could significantly enhance the contribution of relevant
parties in strengthening the system's resilience and effectiveness.
The audit team determined the audit findings by taking into consideration the requirements of ICure, the previous audit records and
conclusions, the accuracy, sufficiency, and appropriateness of evidence, the extent to which planned audit activities are realized and
planned results achieved, the sample size, and the categorization of the audit findings. The audit team decided to first record all the
requirements met; then they proceeded to record the nonconformities.
Based on the scenario above, answer the following question:
Question:
Did the audit team consider all the necessary aspects when determining audit findings?
A software development company is well-known for its innovative practices and collaborative work environment. The CEO, Alex, has fostered a work culture where team input is highly valued in shaping the company’s strategic direction. Alex often organizes brainstorming sessions and workshops, inviting employees from various departments to share their insights and suggestions on new projects, company policies, and workflow improvements. While Alex ensures that every team member feels heard and valued, the final decisions on project directions, key company policies, and strategic initiatives rest with Alex. Which type of leadership does Alex most closely embody?