Prepare effectively for your Salesforce Development-Lifecycle-and-Deployment-Architect Salesforce Certified Platform Development Lifecycle and Deployment Architect (Plat-Arch-202) certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Universal Containers is starting a Center of Excellence (COE). Which two user groups should an Architect recommend to join the COE?

A.

Call Center Agents

B.

Program Team

C.

Executive Sponsors.

D.

Inside Sales Users.

Which two project situations favor a waterfall methodology? Choose 2 answers

A.

An application with many systems and inter-dependencies between components.

B.

An application with regulatory compliance requirements to be validated by outside agencies.

C.

An application in post-production, with incremental changes made by a small team.

D.

An in-house application with a fixed team size, but an open timeline and flexible requirements.

Universal Containers has a complex deployment coming up. The deployment will include several Apex classes which depend on custom settings that hold important configuration. How should an Architect manage this deployment?

A.

Script the deployment of all functionality via the Force.com Migration Tool

B.

Manually deploy and populate custom settings in production using a change set

C.

Create a custom metadata type and include this in your deployment to production

D.

Manually deploy and populate the custom settings in production prior to theApex Class deployment

What are two roles a project Steering Committee plays in determining what methodologies are used? Choose 2 answers

A.

Enforcing that corporate project stage gates are part of the chosen methodology

B.

Designing a methodology that will meet a particular project's requirements

C.

Approving deviations from the chosen methodology, when required to address project issues

D.

Setting the criteria for selecting Agile or Waterfall methodology to be used on internal projects

Universal Containers (UC) is developing a custom Force.com application. The following tools are used for development, the Force.com IDE for developing apps. Git as a source control system and a Git repository, and the Force.com Migration Tool for updating sandboxes from source control. UC's current branching strategy calls for two main branches: 1) Master 2) Develop Three supporting branches: 1) Feature 2) Release 3) Hotflix Consider that the branching strategy is in parallel as follows Feature |Develop |Release |Hotfix |Master What is the recommended practice strategy that Developers should adopt for Development?

A.

Developers work off of the Feature branch, which is pulled from the Master branch and the Feature branch is then merged with the Develop branch.

B.

Developers work off of the Feature branch, which is pulled from the Develop branch, and the Feature branch is then merged with the Develop branch.

C.

Developers work off of the Feature branch, which is pulled from the Release branch, and the Feature branch is then merged with the Develop branch.

D.

Developers work off of the Feature branch, which is pulled from the Develop branch, and the Feature branch is then merged with the Hotfix branch.

Universal Containers (UC) has many different business units, all requesting new projects to be built into a single Salesforce Org. UC management is concerned with a lack of appropriate project properties and roadmap for the Salesforce ecosystem. What should an Architect recommend?

A.

Use design Standards for Governance.

B.

Create a Center of Excellence with a charter document.

C.

Create a Release Management Process.

D.

Create project charters for each project.

What is a main characteristic of an agile team?

A.

The team uses Scrum, Kanban, and Extreme Programming.

B.

The team has biweekly sprints to ensure on-time delivery.

C.

The team delivers new releases on dates defined in the beginning of the project, following a project plan

D.

The team improves and evolves its processes and frequently delivers value to the end users.

Universal Containers CUC) has decided to improve the quality of work by the development teams. As part of the effort, UC has acquired some code review software licenses to help the developers with code quality.

Which are two recommended practices to follow when conducting secure code reviews? Choose 2 answers

A.

Generate a code review checklist to ensure consistency between reviews and different reviewers.

B.

Focus on the aggregated reviews to save time and effort, to remove the need to continuously monitor each meaningful change.

C.

Conduct a review that combines human efforts and automatic checks by the tool to detect all flaws.

D.

Use the code review software as the tool to flag which developer has committed the errors, so the developer can improve.

What are two limitations an architect should consider when designing a strategy for managing technical reference data, with multiple related objects?

Choose 2 answers

A.

Apex CPU limits

B.

Circular relationships

C.

Depth of nested relationships

D.

HTTP response size

All AppExchange products are subject to Salesforce security reviews.

What is the most common reason that the prospect AppExchange products fail the security review?

A.

Cross-site scripting

B.

CRUD/FLS (field level security)

C.

Session hacking

D.

SOQL injection

Universal Containers is looking to construct a continuous integration process to help manage code quality. Which three tools should be used to enable this? Choose 3 answers

A.

Force.com Migration Tool

B.

Full Sandbox Environment

C.

Source Control Tool

D.

Project Management Tool

E.

Continuous Integration Build Tool

Universal Containers (UC) had implemented two full sandboxes. One, known as Stage,

is used for performance, regression testing, and production readiness check. The other is used primarily for user acceptance testing (UAT). Both full sandboxes were refreshed two months ago. Currently, UC is targeting to start user acceptance testing in two weeks, and do production release in four weeks. An admin also realized Salesforce will have a major release in six weeks.

UC needs to release on the current Salesforce version, but also wants to make sure the new

Salesforce release does not break anything

What should an architect recommend?

A.

Refresh Stage now, and do not refresh UAT. This way, Stage will be on preview and UAT will not.

B.

Use the Sandbox Preview Guide to check if there is any necessary action needed. UC might have to prepare, refresh, and redeploy to UAT.

C.

Visit trust.salesforce.com to figure out the preview cutoff dates, if the dates had passed, work with support to get on the preview instance.

D.

Refresh Stage from UAT now. After preview cutoff, use the upgraded one for regression test, use the non-upgraded one for user acceptance Test.

Universal Containers (UC) has a recruiting application using Metadata API version 35, and deployed it in production last year. The current Salesforce platform is running on API version 36.A new field has been introduced on the object Apex page in API version 36. A UC developer has developed a new Apex page that contains the new field and is trying to deploy the page using the previous deployment script that uses API version 35. What will happen during the deployment?

A.

The deployment script will pass because the new field is backward compatible with the previous API version 35.

B.

The deployment script will fail because the new field is not known for the previous API version 35.

C.

The deployment script will pass because the new field is supported on the current platform version.

D.

The deployment script will fail because the platform doesn't support the previous API version 35.

Universal Containers (UC) is implementing a governance framework and has asked the Architect to make recommendations regarding release planning. Which two decisions should the Architect make when planning for releases? Choose 2 answers

A.

How to test existing functionality to ensure no regressions are introduced.

B.

Whether Salesforce will wait to upgrade the pod until after a UC release is complete.

C.

How to roll back to the previous Salesforce release if there are issues.

D.

When to test a new UC feature release if there are issues.

Northern Trail Outfitters (NTO) recently acquired Eastern Trail Outfitters (ETO). NTO's sales leadership team had hands-on experience with the ETO's Sales Optimization app and have given the feedback that the app would benefit NTO's sales team.

Which option should the architect recommend for having ETO's Sales Optimization app in NTO's Salesforce org in the shortest possible time?

A.

Create a managed package of the app and deploy in NTO's org.

B.

Create an unmanaged package of the app and deploy in NTO's org.

C.

Create users in ETO's org and provide access to NTO's sales team.

D.

Create a core team and build the Sales Optimization app in NTO's org.

Universal Containers is adopting Scrum as an agile methodology and wants to choose a software tool to support the adoption. What three key features of an agile development support tool should an architect look for? Choose 3 answers

A.

Sprint backlog management

B.

Email notifications when work is created or changed

C.

Product backlog prioritization

D.

Work (for example,user stories or tasks) assignment

E.

Kanban board

Universal Containers CUC) is hiring offshore agile development teams to decrease costs and enhance UC's capability of delivering new features to its customers. However, the CTO Is not able to follow or measure the work of those teams.

What should an architect recommend to increase transparency?

A.

Schedule a daily stand-up meeting with representatives of all offshore teams to share the progress of the teams.

B.

Request the offshore teams to send daily emails to the CTO with the progress of the teams.

C.

Ask the offshore teams to add their progress and status in a shared spreadsheet.

D.

A Request the offshore teams to share their work in progress in a virtual Kanban board tool.

Universal Containers have just acquired Planetary storage. Both companies use salesforce.com to manage their sales activities. The two companies have many customers in common and the company plans to merge the two sales organizations, but the products and sales processes between the two original companies will remain different and distinct. What factor should the company consider in merging the two Salesforce.com orgs into a single org?

A.

Transactional sales data could be combined without modification since standard objects are used

B.

Salespersons selling both product lines would need two logins, once for each product line

C.

Business processes on standard objects can be merged without modifications

D.

Customer data could be merged with modifications using standardization and de -duplication

Universal Containers is having trouble aligning releases between major, minor, and Salesforce seasonal releases.

What should an architect recommend?

A.

Gate all release decisions at the center of excellence.

B.

Create a release calendar, train and align all the teams.

C.

Share the test plans between the teams on each release type.

D.

Create a spreadsheet of metadata changes and reconcile the overlaps.

Universal Containers (UC) deploys major releases on a monthly schedule. In recent months, the team has noticed the deployment time has increased two-fold from 2 hours to 4 hours. The team wants to get back to reasonable deployment times. Which three issues could be affecting their deployment times? Choose 3 ans

A.

The number and complexity of Apex tests will have a large impact on the deployment time.

B.

Some components’ profiles, custom junction objects, and fields take longer to process than others.

C.

The deployments are being scheduled during off-peak hours, which is not the best time.

D.

Users are working in the org during deployment locking can affect users and the deployment.

E.

The team is highly constrained with pre-deployment and post-deployment changes.

Copyright © 2014-2025 Solution2Pass. All Rights Reserved