LEED-AP-O+M USGBC LEED AP Operations + Maintenance (LEED AP O+M) Free Practice Exam Questions (2025 Updated)

Prepare effectively for your USGBC LEED-AP-O+M LEED AP Operations + Maintenance (LEED AP O+M) certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 2 / 3
Total 166 questions

When conducting the Indoor Environmental Quality Credit, Occupant Comfort Survey what is the minimum percentage of building occupants that must respond?

A.

10%

B.

20%

C.

30%

D.

40%

What must the project team do regardless of building type for Energy and Atmosphere Prerequisite, Minimum Energy Performance?

A.

Compile meter data into daily and weekly summaries

B.

Use Labs21 Energy Benchmarking tool to calculate minimum energy performance

C.

Establish an ENERGY STAR® Portfolio Manager profile

D.

Benchmark building site energy data of at least three similar buildings

The minimum amount of renovation or new construction work required to qualify for Materials and Resources Credit, Purchasing - Facility Maintenance and Renovations is

A.

correlated to an increase of the floor area by at least 5%

B.

determined based upon flush-out procedure requirements

C.

determined by the project team as there is no minimum requirement

D.

correlated to alterations that include construction activity by more than one trade

Which of the following products qualifies under Materials and Resources Credit, Purchasing - Ongoing?

A.

A product labeled Sustainable Sourced

B.

An organic product produced within a 500 mi. (805 km) radius

C.

A United States Department of Agriculture (USDA) organic food product

D.

A Protected Harvest certified product purchased outside the performance period

How is the energy baseline determined in Minimum Energy Performance if the building type is not addressed by the ENERGY STAR® rating tool?

A.

Local energy supplier estimates or calibrated energy simulation

B.

Historical energy consumption data or calibrated energy simulation

C.

Historical energy consumption data or national average source energy data

D.

Short-term system measurements using data loggers or national average source energy data

A building manager has purchased and installed new T8 (fluorescent) lamps throughout the project facility. All other lamps remained the same. The project building's average picogram per lumen hour decreased. A valid explanation for this change is that

A.

both the average life of the new T8 lamps and the mercury content remained the same

B.

the average life of the new T8 lamps remained the same; however, the mercury content increased

C.

the mercury content of the new T8 lamps remained the same; however, the average life of the bulb increased the mercury content of the new T8 lamps remained the same; however, the average life of the bulb decreased

When tracking waste data during the performance period for Materials and Resources Credit, Solid Waste Management - Ongoing, which strategy may be used to document total and diverted waste?

A.

Measure and document waste in weight or volume

B.

Use replacement value as the metric for ongoing waste

C.

Extrapolate data from one month of the performance period

D.

Do not allow tenant waste outside the building's waste program to be included

What is the maximum number of points a project could achieve using innovation credits for the Innovation Credit, Innovation?

A.

One point

B.

Two points

C.

Three points

D.

Four points

For projects not eligible for the ENERGY STAR® rating, the project team could demonstrate compliance with Energy

and Atmosphere Prerequisite, Minimum Energy Efficiency Performance by

A.

conducting an energy audit that develops a commissioning plan for the building's major energy using system

B.

providing a program demonstrating no or low cost measures of improvement to increase energy efficiency

C.

developing a master list of findings identifying systems or pieces of equipment including the defects or problems

and proposed solutions

D.

demonstrating an energy efficiency of at least 25% better than the national average for typical buildings of similar

type based on energy source

Discussing the project goals to help identify the credits and options that the team should attempt is an example of

A.

documenting LEED credits

B.

creating the Basis of Design (BOD)

C.

developing the LEED Scorecard

D.

implementing the Commissioning (Cx) Plan

A building manager benchmarks a building's energy performance in ENERGY STAR® Portfolio Manager for the purposes of Energy and Atmosphere Prerequisite, Minimum Energy Performance. The use of the energy use intensity (EUI) tool in Portfolio Manager also satisfies which of the following steps performed under Energy and Atmosphere Prerequisite, Energy Efficiency Best Management Practices?

A.

Examine average and peak utility costs

B.

Develop a sequence of operations for building systems

C.

Create an energy use breakdown by major system types or end uses

D.

Establish target energy and cost reduction goals as part of the ASHRAE energy use analysis

A building owner upgrades the building automation system (BAS) to allow programmable load control. Which of the following credits can be pursued because of the upgrade?

A.

Energy and Atmosphere Credit, Demand Response

B.

Energy and Atmosphere Credit, Ongoing Commissioning

C.

Energy and Atmosphere Credit, Advanced Energy Metering

D.

Energy and Atmosphere Credit, Existing Building Commissioning – Implementation

Storage locations are required for which of the following recyclable materials?

A.

Mixed paper, paint, glass, plastics and electronics

B.

Mixed paper, corrugated cardboard, wood pallets, plastics and metals

C.

Mixed paper, batteries, glass, plastics and electronics

D.

Mixed paper, corrugated cardboard, glass, plastics and metals

Which of the following strategies is allowed under Energy and Atmosphere Credit, Renewable Energy and Carbon

Offsets, and will help a project achieve Energy and Atmosphere Credit, Optimize Energy Performance?

A.

Install an on-site photovoltaic array

B.

Purchase Green-e certified carbon offsets

C.

Purchase Green-e certified Renewable Energy Certificates (RECs)

D.

Install an on-site geothermal energy with a ground-source heat pump

What is the percentage range of total municipal waste that commercial and institutional buildings typically account

for?

A.

25% to 35%

B.

35% to 45%

C.

45% to 55%

D.

55% to 65%

A management method that could be included in a project's site management policy is the use of

A.

high-decibel equipment instead of low-decibel equipment

B.

electric-powered equipment instead of gasoline-powered equipment

C.

mechanical equipment instead of non-powered manual methods

D.

exterior maintenance beyond the minimum levels required to maintain site safety

Under Energy and Atmosphere Credit, Optimize Energy Performance, for buildings eligible to receive an energy performance rating using the Environmental Protection Agency's ENERGY STAR® Portfolio Manager what is the minimum rating to receive points?

A.

50

B.

70

C.

76

D.

85

At what point is it appropriate for the LEED AP to administer an alternative transportation survey to those that visit the building?

A.

When 50% of visitors utilize alternative transportation modes to visit the building

B.

When 80% of visitors utilize alternative transportation modes to visit the building

C.

When the daily average or typical peak number of visitors is at least 50% of the regular building occupants

D.

When the daily average or typical peak number of visitors is greater than the number of regular buildingoccupants

An essential goal of retro commissioning, re-commissioning, or on-going commissioning for a building's energy using systems is to

A.

reduce CFC-based refrigerants in HVAC&R base building systems

B.

produce a master list of findings related to the commissioning process

C.

execute an energy audit that meets requirements of ASHRAE Level 2

D.

identify opportunities for cost-effective reduction in energy consumption

The LEED AP is searching the Addenda Database for LEED Interpretations that pertain to Sustainable Sites Credit,

Light Pollution Reduction. Which interpretations must be used when attempting this credit?

A.

Sustainable Sites Credit, Light Pollution Reduction LEED Interpretation published after the project's registration date that the project thinks is relevant

B.

Energy and Atmosphere Credit, Optimize Energy Performance LEED Interpretation published on the project's

registration date that the project thinks is relevant

C.

Sustainable Sites Credit, Light Pollution Reduction LEED Interpretation published before the project's

registration date that applies to the project's rating system

D.

Energy and Atmosphere Credit, Optimize Energy Performance LEED Interpretation published before the

project's registration date that applies to the project's rating system