LEED-AP-O+M USGBC LEED AP Operations + Maintenance (LEED AP O+M) Free Practice Exam Questions (2025 Updated)
Prepare effectively for your USGBC LEED-AP-O+M LEED AP Operations + Maintenance (LEED AP O+M) certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.
When conducting the Indoor Environmental Quality Credit, Occupant Comfort Survey what is the minimum percentage of building occupants that must respond?
What must the project team do regardless of building type for Energy and Atmosphere Prerequisite, Minimum Energy Performance?
The minimum amount of renovation or new construction work required to qualify for Materials and Resources Credit, Purchasing - Facility Maintenance and Renovations is
Which of the following products qualifies under Materials and Resources Credit, Purchasing - Ongoing?
How is the energy baseline determined in Minimum Energy Performance if the building type is not addressed by the ENERGY STAR® rating tool?
A building manager has purchased and installed new T8 (fluorescent) lamps throughout the project facility. All other lamps remained the same. The project building's average picogram per lumen hour decreased. A valid explanation for this change is that
When tracking waste data during the performance period for Materials and Resources Credit, Solid Waste Management - Ongoing, which strategy may be used to document total and diverted waste?
What is the maximum number of points a project could achieve using innovation credits for the Innovation Credit, Innovation?
For projects not eligible for the ENERGY STAR® rating, the project team could demonstrate compliance with Energy
and Atmosphere Prerequisite, Minimum Energy Efficiency Performance by
Discussing the project goals to help identify the credits and options that the team should attempt is an example of
A building manager benchmarks a building's energy performance in ENERGY STAR® Portfolio Manager for the purposes of Energy and Atmosphere Prerequisite, Minimum Energy Performance. The use of the energy use intensity (EUI) tool in Portfolio Manager also satisfies which of the following steps performed under Energy and Atmosphere Prerequisite, Energy Efficiency Best Management Practices?
A building owner upgrades the building automation system (BAS) to allow programmable load control. Which of the following credits can be pursued because of the upgrade?
Storage locations are required for which of the following recyclable materials?
Which of the following strategies is allowed under Energy and Atmosphere Credit, Renewable Energy and Carbon
Offsets, and will help a project achieve Energy and Atmosphere Credit, Optimize Energy Performance?
What is the percentage range of total municipal waste that commercial and institutional buildings typically account
for?
A management method that could be included in a project's site management policy is the use of
Under Energy and Atmosphere Credit, Optimize Energy Performance, for buildings eligible to receive an energy performance rating using the Environmental Protection Agency's ENERGY STAR® Portfolio Manager what is the minimum rating to receive points?
At what point is it appropriate for the LEED AP to administer an alternative transportation survey to those that visit the building?
An essential goal of retro commissioning, re-commissioning, or on-going commissioning for a building's energy using systems is to
The LEED AP is searching the Addenda Database for LEED Interpretations that pertain to Sustainable Sites Credit,
Light Pollution Reduction. Which interpretations must be used when attempting this credit?