UiPath-ARDv1 UiPath Advanced RPA Developer v1.0 Exam (UiARD) Free Practice Exam Questions (2025 Updated)
Prepare effectively for your UiPath UiPath-ARDv1 UiPath Advanced RPA Developer v1.0 Exam (UiARD) certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.
A developer automated a business process based on the Dispatcher and Performer model using two automation projects. Each project file has several invoked workflow files. Before publishing, the developer wants to ensure all unexpected exceptions are caught.
How many Global Exception Handlers can be set?
A developer performs a review on a complex process stored in a single .xaml file. During the review, the developer discovers that the workflow cannot be easily tested. Based on best practices, which approach is recommended for improving the ability to independently test components?
A developer is automating a process which uses data from invoice documents. The business requirement is that each transaction should be uniquely identified by the invoice number and is only uploaded to the Orchestrator queue once.
What is a recommended practice to meet this requirement?
A developer needs to create an Out argument to pass the results of a Data Scraping activity to another workflow. The activity scrapes text from a structured list on a website.
From the drop-down list shown in the exhibit, select the Argument Type that should be used.
In a UiPath Studio project, the property ValidateUnconnectedNodes is set to True on a flowchart. A Log Message activity on this flowchart is not connected to any other node. What is the behavior of this setting at design time?
A developer wants to create a process which uses UI automation activities on hidden or minimized windows for a user in a Call Center. While the process is running on the user’s machine, the user also needs the ability to use the machine to look up items in a desktop application.
Which activity must be configured to be able to interact with hidden or minimized windows?
A developer needs to select a layout for integrating activities into a workflow file. They must select a layout that covers all possible cases and transitions, and accommodate processes that are not easily captured through the use of loops and If statements.
Based on best practices, which layout is recommended?
During the debugging process, which panel will help monitor the variables' values, arguments, and user-defined expressions within the scope of the executing activity?
A developer is automating a project for the Finance team. As defined in the Process Definition Document, the robot is required to log the completion of each step with the documented corresponding Log Level.
If Fatal is the highest Log Level severity for the UiPath Log Message activity, what is the correct priority sequence, from the lowest to the highest severity, of the remaining Log Levels?
Instructions: Drag and drop the lowest severity level to the top of the list and repeat until the highest severity level appears at the bottom of the list.
A developer created a process which extracts text from an element on an HTML website using a Get Text activity. The developer observed that the text can only be successfully extracted when the attribute "innertext" updates or changes from "false" to "true". The target element can take up to 20 seconds to load.
Which activity should be used before the Get Text activity to ensure the target element text can be extracted?
A developer has built a process consisting of three invoked workflows in the Main.xaml file. The second workflow should be run in Picture-in-Picture (PiP). How should the Invoke Workflow File activity properties be configured?
A developer has two collections containing data:
1) A list of strings called listA that was initialized with 2 items
2) An array of strings called arrayB that was initialized with 2 items
How can both collections be combined into a single 4-item collection called results?
A developer is running a process in UiPath Studio based on Robotic Enterprise (RE) Framework 2021.10. One asset defined in the project does not exist in the Orchestrator folder provided in the Config.xlsx file.
What is the behavior at runtime?
A developer automates a process which has an Excel file as input data. Because the Orchestrator is not connected, the developer needs to adapt the Robotic Enterprise (RE) Framework to use it with tabular data.
Where in the REFramework is it a best practice to read the data from the Excel file and store it in a global DataTable variable?
A developer created an automation project in the Robotic Enterprise (RE) Framework which needs to enter a User ID depending on the machine it runs on. The User ID is stored in Orchestrator as a Text asset using the Value Per Account-Machine method.
Which steps should the developer perform to use this asset in the project?
A developer created a sequence with a Retry Scope shown in the following exhibit:
What is the content of the Output panel after running this sequence?
A developer wants to use separate user data folders for browsers in the Main and PiP sessions. What is the correct setting of the UserDataFolderMode property on the Open Browser activity?
A developer plans to create a process to automate a web application. The web application requires HTML buttons and text boxes to be loaded. Although some assets may still be loading, the robot should perform the UI actions once the buttons and text boxes are loaded.
Which property should be configured?
If a developer wants to use a variable of type UIElement to identify a button in a Click activity, which property must be manually configured during development?
What represents an example of a full selector?