Prepare effectively for your VMware 3V0-41.22 Advanced Deploy VMware NSX-T Data Center 3.x certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 1 / 1
Total 16 questions

Task 10

You have been notified by the Web Team that they cannot get to any northbound networks from their Tampa web servers that are deployed on an NSX-T

network segment. The Tampa web VM's however can access each other.

You need to:

• Troubleshoot to find out why the Tampa web servers cannot communicate to any northbound networks and resolve the issue.

Complete the requested task. TO verify your work. ping the Control Center @ 192.168.110.10

Notes: Passwords are contained in the user_readme.txt. This task is dependent on Task 4. Some exam candidates may have already completed this task if they had done more than the minimum required in Task 4. This task should take approximately 15 minutes to complete.

Task 7

you are asked to create a custom QoS profile to prioritize the traffic on the phoenix-VLAN segment and limit the rate of ingress traffic.

You need to:

• Create a custom QoS profile for the phoenix-VLAN using the following configuration detail:

• Apply the profile on the ‘phoenix-VLAN' segment

Complete the requested task.

Notes: Passwords are contained in the user_readme.txt.

take approximately 5 minutes to complete.

Subsequent tasks may require the completion of this task. This task should

Task 15

You have been asked to enable logging so that the global operations team can view inv Realize Log Insight that their Service Level Agreements are being met for all network traffic that is going in and out of the NSX environment. This NSX environment is an Active / Active two Data Center design utilizing N-VDS with BCP. You need to ensure successful logging for the production NSX-T environment.

You need to:

    Verify via putty with SSH that the administrator can connect to all NSX-Transport Nodes. You will use the credentials identified in Putty (admin).

    Verify that there is no current active logging enabled by reviewing that directory is empty -/var/log/syslog-

    Enable NSX Manager Cluster logging

    Select multiple configuration choices that could be appropriate success criteria

    Enable NSX Edge Node logging

    Validate logs are generated on each selected appliance by reviewing the "/var/log/syslog”

Complete the requested task.

Notes: Passwords are contained in the user _ readme.txt. complete.

These task steps are dependent on one another. This task should take approximately 10 minutes to complete.

Task 3

You are asked to deploy a new instance of NSX-T into an environment with two isolated tenants. These tenants each have separate physical data center cores and have standardized on BCP as a routing protocol.

You need to:

Complete the requested task.

Notes: Passwords are Contained in the user_readme.txt. Task 3 is dependent on the Completion Of Task and 2. Other tasks are dependent On the Completion Of this task. Do not wait for configuration changes to be applied in this task as processing may take up to 10 minutes to complete. Check back on completion. This task should take approximately 10 minutes to complete.