Prepare effectively for your API API-SIEE Source Inspector Electrical Equipment certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2026, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 2 / 2
Total 110 questions

What method is used to verify tightness of accessible bolted electrical connections?

A.

Compression of the lock-nut

B.

Visual inspection of torque markings

C.

Verification of assembly check sheet

D.

Calibrated torque wrench

According to NETA, for low voltage cables a visual inspection must verify that:

A.

color codes comply with IEEE requirements.

B.

the shield on power cables is properly grounded.

C.

connections are in accordance with the single-line diagram.

D.

all cables are connected to terminals via ring tongue lugs.

What document is used for petroleum and chemical industry premium-efficiency, severe-duty, totally enclosed fan-cooled TEFC squirrel cage induction motors up to and including 370 kW 500 hp?

A.

API 546

B.

IEEE 141

C.

IEEE 841

D.

NFPA 70

What is the purpose of an insulation resistance reading?

A.

To evaluate the insulation and condition of the grounding

B.

To determine the resistance of the conductors

C.

To evaluate the condition of the insulation between conductors and ground

D.

To determine if the conductors are properly terminated

What is an advantage of the Insulation Resistance test?

A.

It is non-destructive in nature.

B.

It is not affected by higher moisture content in the air.

C.

It is not affected by increases in joint temperature.

D.

It can be conducted above the breakdown voltage of the insulation.

Final inspection and shipping preparations of switchgear typically consists of verifying all of the following except:

A.

all final manufacturing and drawing issues are closed.

B.

correct engraving of unit and master nameplates.

C.

visual inspection of packaging requirements.

D.

all items on the manufacturer's QC checkout are signed off.

The highest voltage rating on a piece of medium voltage equipment is the:

A.

basic impulse level.

B.

AC high potential.

C.

DC high potential.

D.

nominal voltage.

According to API 541, prior to mechanical running test, each mounting foot shall be checked for “soft feet.” How is this check conducted?

A.

Feeler gauges are used at the foot to base interface to verify gap tolerance has not been exceeded

B.

After torquing mounting bolts, a vertically oriented, zeroed, dial indicator is attached to each foot and a reading taken after loosening of the bolt torque to verify movement is within tolerance

C.

A dial indicator is oriented vertically and zeroed prior to base bolt tightening with a reading taken after tightening to confirm movement is within tolerance

D.

Mounting bolt torque is verified with a calibrated torque wrench with no visible gaps observed between the foot and base interface

According to IEEE 841, terminal boxes for voltages above 1000 V or for frame sizes exceeding 449T at 1000 V shall be provided with:

A.

integrally designed grounding lugs.

B.

permanent locking mechanism.

C.

corrosion-resistant replaceable automatic drainage fitting.

D.

corrosion-resistant non-sparking coating.

Which switchgear-related item is explicitly identified in the guide table of contents as an inspection topic?

A.

Cable tray color coding

B.

Metering

C.

Turbine nozzle alignment

D.

Firewater pump casing hardness

According to ANSI C57.12, the average winding temperature rise above ambient temperature shall not exceed what value?

A.

65°C

B.

70°C

C.

80°C

D.

90°C

According to IEEE C57.12.00, a durable, metal, name plate shall be affixed to each transformer by the:

A.

manufacturer.

B.

owner.

C.

purchaser.

D.

QA/QC Inspector.

Which document should identify the inspection activities to be performed by the assigned source inspector and include the applicable acceptance criteria?

A.

Purchase requisition

B.

Inspection and Test Plan (ITP)

C.

Shipping release form

D.

Supplier observation report

Page: 2 / 2