CTS AVIXA Certified Technology Specialist Free Practice Exam Questions (2025 Updated)
Prepare effectively for your AVIXA CTS Certified Technology Specialist certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.
In a request for proposal (RFP) document, what would be the BEST place to find the overall expectations and contractual requirements for the project?
A newly installed AV system is experiencing intermittent loss of video on one display. What is the FIRST step the technician should take?
What is the PRIMARY advantage of preventive maintenance?
Two computers are connected to a videoconferencing system through a switcher using HDMI cables. Computer content from PC A is being properly transmitted. However, when PC B is selected by the switcher, it does not work through the videoconferencing system. They both work when connected directly to the videoconferencing system or the monitor. The solution is to add a device that enables____management.
As the height of a character increases on a display.
Based on this image, what is the aspect ratio for WUXGA?
According to AVIXA's AV Performance Verification standard, at what point should the loudspeaker transformer tap setting be verified?
The limits of the vertical visual field indicate that displays should be positioned where in relation to the viewers' standard line of sight?
An event planner for a banquet surrounding a swimming pool has requested that the pool be lit in the client’s colors using underwater lighting. What does the technician need to consider?
By code, projection screens should be positioned in a manner that avoids blocking
As a project manager, daily or weekly updates from the____are MOST USEFUL when trying to make sure a job comes in on time and on budget.
Assuming that the screen and projector are both Ethernet controllable devices, where does the control system for the AV solution need to exist?
What does a compressor control in an audio system?
If the nominal light output of a projector was measured at 5000 ANSI lumens using an f/1.4 lens, what would happen if the lens was changed to an f/2.8 large zoom?
Which document is used to clarify a project design issue?
Which of the following terms means a complete lighting instrument composed of a lamp and housing?
A 2x2 video wall was sold with each display being Full HD resolution. Now the client wants to show live content at the best possible quality over the complete wall. Which resolution must the camera provide?
Installing an AV system generates a lot of debris. When is the BEST time to identify if there will be a place to dispose of the debris?
As part of a service agreement offering, wfwt PRIMARY role do preventive maintenance visits (PM/PMV) play?
Which of these symbols is generally used to represent a network?