Prepare effectively for your Cisco 300-615 Troubleshooting Cisco Data Center Infrastructure (300-615 DCIT) v1.1 certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2026, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 4 / 4
Total 221 questions

Refer to the exhibit. EVPN must be configured using Cisco Nexus 9000 Series Switches, but the MAC and IP address information fails to be learned in the control plane. Which command must be added to the configuration to resolve the issue?

A.

ingress-replication protocol bgp

B.

host-reachability protocol static

C.

host-reachability protocol bgp

D.

ingress-replication protocol static

Refer to the Exhibit.

An Engineer cannot log in to the Cisco IMC page of the Cisco UCS C220 server. Which action resolve the issue?

A.

Se the FQDN of the Cisco IMC webpage login page instead of the IP address for the connection to be secure.

B.

Use the DNS of the Cisco IMC webpage login page instead of the IP address for the connection to be secure.

C.

Replace the self-signed certificate that is installed on the Cisco IMC with a server certificate that is signed from the client corporate certificate.

D.

Replace the self-signed certificate that is installed on the Cisco IMC with a user certificate that is signed from the client corporate certificate.

Refer to the exhibit.

Partial configuration from N9K-1 and N9K-2 is included. The client has two WANs connected.

    WAN-1 is for normal business-day activities.

    WAN-2 is for server backups during nonworking hours of 1:00 a.m. to 5:00 a.m. daily.

The client says that at the scheduled time for backup, the data center server failed to use the WAN-2 link to back up the servers to the cloud backup system. What is the solution to this problem?

A.

The event timer must be written in epoch time format.

B.

The Cisco Nexus switch must be configured with one applet because a configuration with two applets will fail.

C.

The Cron entry must be configured without double quotes.

D.

The applet called “Backup” must include an action to remove the current static route.

Refer to the exhibit. The administrator set up two pairs of Cisco Nexus switches. The administrator set different vPC priorities on all four Nexus switches. As soon as the administrator activates the vPC between the two pairs the network faces

different issues. The problems range from both Nexus pairs declare themselves as root bridge, as well as spanning-tree inconsistencies and traffic forwarding issues. Which action resolves these issues?

A.

Change the role priority on one pair.

B.

Configure peer-config-check-bypass on both pairs.

C.

Configure a vPC peer link between both peers.

D.

Change domain ID on one pair to a different ID.

Refer to the exhibit.

A Cisco ACI fabric has a VPC policy group toward the external switch. These objects exist inside the fabric:

port channel policy LACP_Active_NoControl

NetFlow monitor policy NetFlow_POL

port channel member policy transmit rate as fast

The engineer must set the LACP timeout to 1 second. However, the engineer notices that the LACP timeout is set to 30 seconds on the CLI. Which action resolves the issue?

A.

Add policy NetFlow_Pol to Synergy-18_Bay-3_MGMT_VPC_PolGrp.

B.

Attach policy LACP_Active_NoControl to override policy.

C.

Assign override policy LACP_fast to Eth1_9_IntSel.

D.

Change port-channel member policy transmit rate to normal.

Refer to the exhibit.

An engineer is configuring a VMM domain integration, but the operation fails to complete. Which two actions resolve the issue? (Choose two.)

A.

Use a different device package.

B.

Configure the route from virtual machine managerB management network to vCenter.

C.

Update the VMware vCenter version to be compatible with the Cisco ACI release.

D.

Change the VMware vCenter access credentials.

E.

Change VMware vCenter IP address.