350-601 Cisco Implementing Cisco Data Center Core Technologies (350-601 DCCOR) Free Practice Exam Questions (2026 Updated)
Prepare effectively for your Cisco 350-601 Implementing Cisco Data Center Core Technologies (350-601 DCCOR) certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2026, ensuring you have the most current resources to build confidence and succeed on your first attempt.
An engineer must configure a Fibre Channel port channel on a Cisco Nexus 9000 Series Switch. The configuration must meet these requirements:
A port-channel protocol negotiation is performed with the peer ports.
The trunk mode must be explicitly configured for the interfaces.
VSANs from 10 to 20 must be allowed.
Which command set configures the devices to meet the requirements?
Refer to the exhibit.
An engineer must connect a Cisco MDS Series Switch to a Cisco UCS domain using a port channel, but the link fails to activate. Which command activates the interface?
What is the function of network file storage?
Which solution provides remote and direct file-level access to users and systems?
A server engineer must create a backup operation that will be used for the entire restore of the Cisco UCS system using a binary that includes a snapshot of the entre system. Which Backup type must be configured to achieve the objective?
All logins to a Cisco Nexus 9000 Series Switch must pass through the TACACS+ server at IP address 192.168.10.10. The configuration must meet these requirements:
• The TACACS+ server must be used for SSH and Telnet.
• The TACACS+ server key must be Cisco123!.
• Management VRF must be used for connectivity.
• The deployment must fail back to local credentials if the TACACS+ server fails to respond within 30 seconds.
Drag and drop the code snippets from the right onto the blanks in the code on the left to complete the configuration. Not all code snippets are used.
An engineer must back up the Cisco UCS configuration. The backup job must meet these requirements:
• It must use the TCP protocol.
• Client identification must be verified before data is transmitted.
• The backup must contain all the system and logical configuration settings.
• The operations team requires that the backup file is in a human-readable format.
Which set of configurations must the engineer use?
Which set of actions must be taken to backup service profiles, MAC pools, and VLANs and transfer the back up file to the external server using authentication?
An engineer must configure HSRP protocol on two cisco nexus 9000 series switches running a virtual port channel in addition, the HSRP implementation must meet these requirements:
Drag and drop the commands from the the right to complete a configuration of the HSRP on the left. The commands are used more than once. Not all commands are used
Which Cisco UCS component does an infra bundle “A” software upgrade?
An engineer is implementing VSANs on a Cisco MDS 9000 Series Switch with a native Fibre Channel. The deployment must meet these requirements:
The host on port fc1/1 must be assigned to VSAN 10.
The port channel 10 ISL must pass multiple VSANs. including VSAN 10.
Which configuration set meets these requirements?
Which virtualization feature is provided by network-attached storage?
Which two Cisco UCS components are upgraded when using Install Infrastructure Firmware? (Choose two.)
The network team needs permissions to access the Cisco UCS B-Series Servers via the Cisco UCS Manager GUI to configure the network and collect information about faults. The administrator wants to assign these permissions to the newly configured user called netops. Which set of tasks must the administrator perform to accomplish these goals?