EDGE-Expert EDGE Excellence in Design for Greater Efficiencies (EDGE Expert) Exam Free Practice Exam Questions (2025 Updated)

Prepare effectively for your EDGE EDGE-Expert Excellence in Design for Greater Efficiencies (EDGE Expert) Exam certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 1 / 2
Total 75 questions

A hotel developer is planning a project. The specifications are based on corporate design standards for water fittings, lighting, heating, and air-conditioning. The EDGE Base Case will:

A.

Not be suitable for certification of this project.

B.

Be adapted to accommodate corporate specifications.

C.

Use the local typical building practices or code.

D.

Be verified on a case-by-case basis for the hotel chain.

The Base Case for utility costs:

A.

Excludes the cost of virtual energy.

B.

Includes the cost of virtual energy.

C.

Excludes the cost of virtual energy only in homes.

D.

Includes the cost of virtual energy only in homes.

The EDGE Preliminary Certificate is issued by the EDGE:

A.

Auditor.

B.

Expert.

C.

Certification Provider.

D.

Operations and Management Team.

In the EDGE software, the Base Case selection of external wall materials in hotels relies on information derived from:

A.

Typical building practices as well as national building performance codes, where they are in existence.

B.

Global building practices as well as international building performance codes, where they are in existence.

C.

Hotel developers' corporate standard specifications, or materials which have been accredited by the hotel industry.

D.

Local building material suppliers who subscribe to EDGE certification for their materials, or are nationally accredited by the local standards authority.

For which of the following is EDGE Advanced certification available?

A.

New constructions

B.

Green lease agreements

C.

Infrastructure constructions

D.

Parks and landscape projects

Which of the following describes a more efficient lamp?

A.

More lumens/watt

B.

Lower watts/m²

C.

Longer life

D.

Lower wattage

Which of the following is a primary resource for the EDGE Auditor when performing the site visit?

A.

EDGE software

B.

Roof insulation U-value

C.

EDGE Auditor’s checklist

D.

Window to Wall Ratio (WWR)

As an EDGE Auditor, one requires a full set of documentation to support each green building measure selected in a project assessment. Providing this information is the responsibility of:

A.

The Client.

B.

The Facility Manager.

C.

The Building Inspector.

D.

The project design team.

Which of the following wall solar reflectivity indexes would be the most energy efficient in a hot climate?

A.

0.2

B.

0.3

C.

0.4

D.

0.7

What is the minimum percentage of efficient lightbulbs that must be installed to claim the measure EEM22 - Efficient Lighting for Internal Areas?

A.

70%

B.

80%

C.

90%

D.

100%

Which of the following parameters can be found in the EDGE App Results Bar?

A.

Building type

B.

Occupant use

C.

Incremental cost

D.

Climate conditions

The Client informs an EDGE Auditor that a key member of the design team has resigned. The Client requests the Auditor to take the member’s place for the remainder of the project’s design development as it would provide the Auditor an opportunity to identify suitable green building measures, making audit tasks much simpler. What should the EDGE Auditor do?

A.

Resign from the audit role on the basis that its position has been compromised by this direct approach by the Client.

B.

Refer the Client to an associate within the organization who works in another department, but is qualified and available to carry out the work.

C.

Accept the additional commission on the basis that this will save the Client time and money, and would reduce the volume of work required for the audit.

D.

Refer the Client to an associate within the organization who will be working with the Auditor on the EDGE audit, since the Auditor organization has spare capacity.

Which type of evidence is required at the post-construction stage for the efficiency measure window glazing?

A.

Design building elevations marking the window glass specifications

B.

Bill of quantities with the specifications for the window glass highlighted

C.

Manufacturer's data sheets showing the make and model, U-value, and SHGC of the installed glass

D.

Window schedule for the building showing the major window glass types if more than one type of glass is present

To claim efficiency measure Insulation for Cold Storage Envelope, which of the following documents is required as evidence at the preliminary certification stage?

A.

Calculations of Coefficient of Performance (COP)

B.

Manufacturer's data sheets for the HVAC system

C.

Drawing(s) showing the U-value specification of the cold storage envelope

D.

Purchase receipts showing the U-value specification of the cold storage envelope

Coefficient of Performance (COP) of the electrical chiller is defined as:

A.

Thermal output / thermal input.

B.

Thermal output / electrical input.

C.

Electrical input / thermal output.

D.

Electrical output / electrical input.

Air-cooled chillers have the following components:

A.

Cooling tower, condenser, condenser pump, evaporator.

B.

Compressor, condenser, thermal expansion valve, evaporator.

C.

Chilled water pump, condenser, thermal expansion valve, evaporator.

D.

Compressor, water-cooled condenser, thermal expansion valve, evaporator.

In the EDGE certification system, who is responsible for the entire project including providing project documentation, access to the site, and the payment of audit and certification fees?

A.

EDGE Expert

B.

EDGE Auditor

C.

Project Owner

D.

EDGE Certification Provider

Which of the following protocols should be followed when the project city is not listed in the EDGE App?

A.

Write to EDGE Certifier to request the city to be included and wait for the application to be updated.

B.

Choose the closest city to the project location and edit the climate data if necessary.

C.

Select any city in the same climate zone around the world and use that to certify the project.

D.

Choose the capital city to the project location and edit the climate data if necessary.

Which of the following BEST describes an EDGE Expert?

A.

A consultant who can issue a preliminary EDGE certificate

B.

An individual accredited by the EDGE Certifier who can serve as a consultant

C.

An individual who can serve as both an auditor and a consultant upon EDGE Committee approval

D.

An individual accredited by the EDGE Operations and Management Team who can serve as a consultant

A building owner tells an EDGE Auditor that water-efficient faucets are in the building’s restrooms. However, the specifications on the faucets are not provided. The Auditor should:

A.

Exclude the faucets in question from the project.

B.

Test the faucets’ flow rates to prove the water use and document the findings.

C.

Require the building owner to replace the faucets as the audit needs the exact specification.

D.

Find a product that has the same parameters as the building owner describes and upload this for evidence.