Summer Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: s2p65

Easiest Solution 2 Pass Your Certification Exams

H35-560 Huawei HCIA-LTE-RNP&RNO V1.0 Free Practice Exam Questions (2025 Updated)

Prepare effectively for your Huawei H35-560 HCIA-LTE-RNP&RNO V1.0 certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 1 / 2
Total 84 questions

Which of the following is not included in the survey station preparation information?

A.

Project documents

B.

Background information

C.

Existing network conditions

D.

The latest network planning base station survey table

E.

Engineering Parameter Table

In the case of FTP download or upload (or packet filling) without manual intervention, the throughput rate should be maintained at this time. If there is a sudden drop, call drops may occur.

A.

True

B.

False

Open-loop spatial multiplexing does not require PMI feedback.

A.

True

B.

False

Which of the following carrier bandwidths does LTE support? (multiple choice)

A.

40M

B.

5M

C.

15M

D.

20M

In the downlink scheduling, which factors will affect the allocation of downlink shared resources and the selection of MCS? (Multiple Choice)

A.

UE capability level

B.

The wireless environment where the user is located

C.

Cache status

D.

PHR (power headroom report) of UE

Which of the following adjustment measures has the highest priority?

A.

Antenna height

B.

Antenna direction angle antenna downtilt angle

C.

Antenna type

Which signaling is triggered by the statistics of the number of successful establishments of the RRC connection establishment?

A.

RRC connection setup

B.

RRC connection request

C.

RRC connection setup complete

D.

RRC connection reconfiguration complete

The single-station verification test only needs to verify whether the cell status in the idle mode is normal.

A.

True

B.

False

The LTE system requires an uplink synchronization system. Uplink synchronization is mainly to eliminate interference between different users in a cell.

A.

True

B.

False

In single-site verification, within the visible target coverage area of ​​the base station, which of the following principles should be met for the RSRP compliance rate of the test road?

A.

The probability that F band meets RSRP> -HOdBm and RS-SINR> -3dB is greater than 98%; D band is greater than 90%

B.

The probability that F band meets RSRP> -105dBm and RS-SINR> -3dB is greater than 98%; D band is greater than 90%

C.

The probability that F band meets RSRP> -lOOdBm and RS-SINR> -3dB is greater than 98%; D band is greater than 90%

D.

The probability that F band meets RSRP> -95dBm and RS-SINR >・3dB is greater than 98%; D band is greater than 90%

In an LTE network, an interface can be configured between eNODEB and MME. Which of the following is the interface name?

A.

S1

B.

S2

C.

X1

D.

X2

Before coverage analysis, it is necessary to obtain basic data such as the planning plan, site distribution, base station configuration, antenna feeder configuration, RS power and service load characteristics of the optimized target area. Then obtain the information of the existing network data, conduct a comparative analysis, and find out the areas where the coverage problem may exist.

A.

True

B.

False

If the UE fails to switch, it is mostly characterized by dropped calls, RRC reestablishment, and so on.

A.

True

B.

False

Assuming other conditions are unchanged, if the power parameter PB is changed from 0 to 1, then which of the following statements is correct?

A.

Cell reference signal power is increased by 3dcorrect

B.

Cell reference signal power is increased by 1dB

C.

Cell reference signal power is reduced by 3dB

D.

Cell reference signal power is reduced by 1dB

Before the cluster optimization test, the target area must be divided into clusters. Which of the following statements are correct? (Multiple choice)

A.

The cluster division should span different areas of the test (planning) full coverage business

B.

Make full use of the terrain (mountains and rivers)

C.

Refer to the existing cluster division for network engineering maintenance

D.

When dividing the cluster, the drive test in each cluster can be completed in one day, usually about 6 hours for one drive test

For the same-frequency switching scenario, which of the following parameters has little effect on the handover?

A.

ofn

B.

ocn

C.

ofs

D.

ocs

What are the wireless indicators that need to be paid attention to during the drive test? (multiple choices)

A.

Up and Downmcs

B.

RSRP&RSRQ&RSSI&SINR

C.

BLER&rate

D.

Ec/Io

Which of the following statements about LTE tools is correct? (Multiple Choice)

A.

Probe can be used for road test and playback

B.

OMStar can be used for network verification

C.

M2000 can be used to configure the network and check the message system.

D.

PRS can be used for simulation and base station selection

ASSTTANT is a front-end test tool independently developed by Huawei, which can display test data, replay test data, and export test data.

A.

True

B.

False

For the E-band of the LTE network, which system has the greatest impact on interference?

A.

GSM 900M

B.

GSM 1800M

C.

TD-SCDMA

D.

WLAN

Page: 1 / 2
Total 84 questions
Copyright © 2014-2025 Solution2Pass. All Rights Reserved