Weekend Sale - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmaspas7

Easiest Solution 2 Pass Your Certification Exams

CT-TAE ISTQB Certified Tester Test Automation Engineer Free Practice Exam Questions (2025 Updated)

Prepare effectively for your ISTQB CT-TAE Certified Tester Test Automation Engineer certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 1 / 2
Total 80 questions

When the SUT provides insight into the behaviour of the system, providing the users the with the status of the various actions performed so that they can check that expected behaviour equals actual behaviour, what is this called?

A.

Portability.

B.

Maintainability.

C.

Observability.

D.

Controllability.

You are reviewing the testability of your SUT.

Which of the following BEST refers to the characteristic of OBSERVABILITY?

A.

The ability of the SUT to perform its intended function for a specified period of time

B.

The ability to exercise the SUT by entering inputs, triggering events and invoking methods

C.

The ability of the SUT to prevent unauthorized access to its components or data.

D.

The ability to identify states, outputs, intermediate result and error messages in the SUT

If model-based testing has been selected for the overall test automation approach for a project, how does that influence the layers of the TAA?

A.

All layers are used, but the test generation layer will be automated based on the defined model

B.

There will be no need for the execution layer

C.

No adaptation will be needed because the interfaces will be defined by the model

D.

There will be no need to design the tests for the API because those will be covered by the model

Which of the following attributes should NOT be included in a test execution report associated with a suite of automated tests?

A.

Summary of the test execution results

B.

System/Application under test and its version

C.

Defect clusters identified during test execution

D.

Environment in which the tests have been executed

Consider a TAS that uses a keyword-driven framework. The SUT is a web application and there is a large set of keywords available for writing the automated tests that relate to highly specific user actions linked directly to the GUI of the SUT. The automated test written with the keywords are statically analyzed by a custom tool which highlight’s repeated instances of identical sequence of keywords. The waiting mechanism implemented by the TAS for a webpage load is based on a synchronous sampling within a given timeout. The TAS allows checking a webpage load every seconds until a timeout value

A.

Changing the scripting approach to data-driven scripting

B.

Implementing keywords with a higher level of granularity

C.

Changing the wait mechanism to explicit hard-coded waits

D.

Establishing an error recovery process for TAS and SUT

Consider the following example of TAS metrics.

Time to execute automated tests

Speed and efficiency of TAS components

Which of the following statements is TRUE?

A.

A and B are both internal TAS metrics

B.

A is an internal TAS metric and B is an external TAS metric

C.

A and b are both external TAS metric

D.

A is and external TAS metric and b is an internal TAS metric

Which of the following is NOT an advantage of test automation?

A.

The ability to perform tests which would be difficult or impossible to execute manually

B.

The ability to run more tests in less time and therefore to make it possible to run them more often

C.

The ability to find more defects with the same tests, compared to executing the same test manually

D.

The ability to enable a better use of skilled testers by freeing them from repetitive and boring tasks

You are implementing test automation for a project and you want to be able to generate test cases automatically using a series of test design tools which use a variety of test design techniques such as decision tables, pairwise testing and boundary value analysis.

You also want to generate test data automatically which can then be used by the tests.

Initially these tests will be run manually to verify their correctness and ultimately you want to include them in the test execution tool so that they can run unattended.

Which layer of the gTAA will be used to support the specification of the test cases and preparation of the test data?

A.

The generation layer

B.

The definition layer

C.

The execution layer

D.

The adaptation layer

What represents good practice when automating a manual regression test suite?

A.

Test data shared between tests should, where feasible, be stored and accessed from a single source to avoid duplication or introduction of error.

B.

All existing manual tests should be decomposed into several smaller automated tests to reduce functional overlap.

C.

Remove inter-dependencies between tests to reduce automation failures and costly error analysis.

D.

Once a manual test has been automated, execute it immediately to Identify whether it operates correctly.

What is the PRIMARY advantage of using abstraction in the TAA?

A.

It makes it more flexible for future reuse and improvements

B.

It requires a higher skill level to implement

C.

It ensures that any scripting method will be supported

D.

It improves the performance of the TAS

You have implemented a keyword-driven scripting framework, which uses a test execution tool to run the tests. This has been in use for the past year and all of the teams now use this framework as the standard approach for test execution.

The teams all work on different aspects of the SUT and they have all experienced significant benefits in the use of this scripting framework. However, on closer examination, you have discovered that there are numerous instances where the teams have the same functionality to test but are using different keywords.

One of your objectives for improvement is to create consistency among the teams.

What is the BEST way to handle this situation?

A.

Move to a model-based approach to scripting where the models include the keywords.

B.

Do nothing, each team are working in isolation and they are all experiencing significant benefits in the way they are currently working.

C.

Provide each team with a set of guidelines and naming conventions for keywords.

D.

Create a central library of keywords and associated definitions for each team to use.

You are executing the first test run of a test automation suite of 200 tests. All the relevant information related to the state of the SUT and to the automated test execution is stored in a small database. During the Automated test run you observe that the first 10 test pass, while an abnormal termination occurs when executing the 11th test. This test does not complete its execution and the overall execution of the suite is aborted. An immediate analysis of the abnormal termination is expected to be time consuming and you have been asked to produce a detailed report of the execution results for the first test run, as soon as possible.

What is the MOST important FIRST step to be taken immediately after the abnormal occurred when executing the 11th test?

A.

Re-run the test automation suite starting from the 12th test

B.

Return the database to a consistent state that allows subsequent test to run

C.

Take a backup of the database in its current state. So It can be analyzed later

D.

Re-run the test automation suite starting from the 1st test.

In order to achieve re-use of a TAS, where SHOULD the design for reuse occur?

A.

At the code level

B.

At the framework level.

C.

At the TAS level

D.

At the TAA level

A major component of your organisation's Test Automaton Solution (TAS) is a popular open-source third-party capture-replay tool for automated functional testing.

Which two of the following must the Test Automation Engineer (TAE) ensure happens for this TAS?

a) The third party tool is placed under configuration management control.

b) The annual support and maintenance costs are agreed with the tool's vendor.

c) It is Important to obtain information about updates and new versions of the tool so that the third party tool is kept up to date.

d) Ensure that the TAS test scripts are integrated into the tool's framework.

e) Ensure that no changes are made to the tool, because modifications are not allowed for third party products.

A.

a and b

B.

c and d

C.

a and c

D.

d and e

You identified a suitable project to pilot an automation tool and planned and conduced a pilot. The pilot has been successful and tool Is being deployed within your organization, with a plan to increase tool use by the one project at a time. During this rollout some test processes will be changed slightly to gain additional benefits from using the tool.

In the pilot project, a small set of manual tests were automated for the first time. You are currently monitoring the test automation efficiency and this reveals that the automation regime for the tests is not yet mature.

Which of the following statements is TRUE?

A.

The approach used for deployed this tool is aligned to the standard success factor for deployment

B.

The pilot project should have been critical so that maximum benefits were delivered

C.

The target defined for the project was inappropriate, because the automation regime for the automated tests at the end of the pilot is not yet mature.

D.

The test process should be radically changed to gain additional benefits from using the tool.

A regression test suite consist of 500 test cases which are all executed manually. The business case for a pilot project is based on the adoption of test automation using a commercial tool that will reduce the execution time by a factor of 90% for 100% of the tests in the regression test suite. The pilot project lasted one month ( as planned) and you are currently its results. At the end of the pilot project, 40% of the regression tests have been automated and their execution time has been reduce by 60%.

Which of the following statements is TRUE in this scenario?

A.

The duration of the pilot project was too short –it should last unit the success factors are achieved

B.

The target defined for the business case is too accurate –it should not be measureable

C.

The project selected for the pilot is too critical –if should not be too critical or too trivial

D.

The target defined for the business case seems difficult to hit – it should be realistic

You are the TAE for an Agile project which has six sprints for the current release. Sprint five is underway and the automated regression suite is due to start later today.

You have re-examined the results from the automated regression runs for the past four sprints. You notice that two test cases both reported a pass for sprints 1 and 4 but a fail for sprints 2 and 3. The failures have gone undetected and are therefore unexplained. Both test cases are closely coupled with other tests in the suite.

What course of action SHOULD you take?

A.

Run the regression suite as planned and see If the tests fail again if they do, determine the cause of failure.

B.

Remove the test cases from the regression suite and refer them to the test designer for manual testing for future sprints.

C.

Quarantine the test cases, run the regression suite without them, and perform root cause analysis on the test cases in parallel.

D.

Run the test cases manually now. If they still pass, keep them in the regression suite, if they fail perform root cause analysis.

Which of the following describes how a test execution report is likely to be used?

A.

To understand which test step caused the failure in a test case

B.

To identify problematic areas of the SUT by keeping a history showing which test cases fail the most

C.

To measure coverage of the test basis by a test suite

D.

To record how a test case failure has been fixed

Which of the following CORRECTLY describes how automation SHOULD be applied to confirmation testing?

A.

Confirmation tests are not good candidates for automation as they are not designed to run many times

B.

Confirmation tests should only be automated if they fail to pass on the first attempt

C.

Confirmation tests can be automated and incorporated into an automated regression suite to show whether defects that were previously fixed reoccur

D.

A confirmation test should only be automated after it has been run manually

Which of the following success factors for a test automation project is TRUE?

A.

Automated tests must be designed to capture only the data that is strictly needed for comparing expected and actual results

B.

The test cases to be automated first must always be selected based on the number of times a test will need to be run

C.

The test cases to be automated must have a high dependency on particular data values

D.

Automated tests that fail due to changes in the requirements of the SUT should be promptly fixed rather than disabled from the test suite

Page: 1 / 2
Total 80 questions
Copyright © 2014-2025 Solution2Pass. All Rights Reserved