Black Friday Sale Special - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmaspas7

Easiest Solution 2 Pass Your Certification Exams

ISTQB-CTFL ISTQB Certified Tester Foundation Level (CTFL v4.0) Free Practice Exam Questions (2025 Updated)

Prepare effectively for your ISTQB ISTQB-CTFL ISTQB Certified Tester Foundation Level (CTFL v4.0) certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 4 / 7
Total 406 questions

Which or the following is a valid collection of equivalence classes for the following problem: An integer field shall contain values from and including 1 to and including 15.

A.

Less than 0.1 through 14. 15 and more

B.

Less than 1.1 through 14. more than 15

C.

negative numbers. 1 through 15. above 15

D.

Less than 1.1 through 15. more than 15

Which of the following statements best describes an advantage of the whole team approach?

A.

It allows the team to deliver software faster by skipping testing and documentation activities.

B.

It enables the team to share responsibility for quality and collaborate with stakeholders throughout the project.

C.

It enables a better division of labor as the team shares a common workspace in one physical location.

D.

It fosters competition and individualism among team members to achieve higher performance.

Consider the following user story and its acceptance criteria:

User Story:

As a member of the "Agnotoly" association, I want to be able to pay the association’s dues through an automatic payment method so that I can forget about payment deadlines.

Acceptance Criteria:

    The member can only pay with ‘Agnesis Master’ credit card.

    The member must register their cell phone number.

    The member must register the credit card in the payment system.

    The member must select a payment method (monthly or annual).

    The member must accept the terms and conditions for the selected method.

    If terms and conditions are accepted, the system sends an OTP (one-time password) to the member’s phone for verification.

    The payment method is registered only after OTP verification.

    Once the payment method is registered, the system will charge on the first business day of the following month.

Test Cycle Results:

    Members successfully paid dues using the credit card.

    Payments were processed monthly and for over a year.

Which ONE of the following options identifies the acceptance criteria that has NOT been fully covered?

A.

Acceptance criteria 8 has not been fully covered during the above test cycle.

B.

Acceptance criteria 4 has not been fully covered during the above test cycle.

C.

All acceptance criteria have been fully covered during the above test cycle.

D.

Acceptance criteria 6 has not been fully covered during the above test cycle.

Which of the following statements is TRUE'?

A.

Unlike functional testing, non-fundional testing can only be applied to conventional systems, not artificial intelligence-based system.

B.

Functional testing focuses on what the system is supposed to do, while white-box testing focuses on how well the system does what it is supposed to do

C.

Functional testing can be applied to all test levels, while non-functional testing can be applied only to system and acceptance test levels.

D.

Black-box test techniques and experience-based test techniques may be applicable to both functional testing and non-functional testing

Which of the following statements about the test pyramid is TRUE?

A.

Each layer of the test pyramid groups tests related to a single non-functional quality charactenstic.

B.

The higher the layer of the test pyramid, the more production code a single automated test within the layer tends to cover

C.

The higher the layer of the test pyramid, the more maintainable a single automated test within the layer tends to be

D.

The higher the layer of the test pyramid, the more isolated a single automated test within the layer tends to be.

Which of the following can be considered a VALID exit criterion?

I Estimates of defect density or reliability measures.

II. The completion and publication of an exhaustive Test Report.

III. Accuracy measures, such as code, functionality or risk coverage.

IV Residual risks such as lack of code coverage in certain areas.

A.

I, III, IV

B.

I, II, III

C.

III, IV

D.

II, III, IV

Match each objective to the correct test level

Objective:

A)Verifying whetherthe functionalandnon-functlonalbehaviorsof the system are as designed andspecified.

B)Verifying whetherthe functionalandnon-functlonalbehaviorsof the interfaces are as designed.

C)Verifying whetherthe functionalandnon-functionalbehaviorsof the components are as designedand specified.

D)Establishing confidence in the quality of the systemas a whole.

Test Level:

1.Component testing.

2.Integration testing.

3.System testing.

4.Acceptance testing.

A.

A3, B2. C4. D1

B.

A2, B3, Cl, D4

C.

A3. B2. C1. D4

Which of the following options should NOT be used for writing acceptance criteria?

A.

Reaction time

B.

Scenarios

C.

Input-output mappings

D.

Test charters

Given the following review process main activities and specific review activities:

a.Planning

b.Initiate review

c.Issue communication and analysis

d.Fixing and reporting

1.Creating defect reports

2.Estimating effort and timeframe

3.Recording updated status of defects

4.Selecting the people to participate

5.Distributing the work product and other material

6.Evaluating the review findings

Which of the following BEST matches the review process main activities with the appropriate specific review activities?

A.

2-a, 4-a, 5-b, 6-c, 1-d, 3-d

B.

2-a, 5-a, 1-b, 4-b, 3-c, 6-d

C.

1-a, 4-b, 5-b, 6-c, 2-d, 3-d

D.

2-a, 4-b, 5-c, 1-d. 3-d, 6-d

Which one of the following statements relating to the benefits of static testing is NOT correct?

A.

Static testing enables early detection of defects before dynamic testing is performed.

B.

Static testing reduces testing costs and time.

C.

Static testing increases development costs and time.

D.

Static testing identifies defects which are not easily found by dynamic testing.

Which of the following is true about Oracles?

A.

Sometimes old version of a product can be used as an Oracle

B.

Oracles help in reproducing the irreproducible bugs

C.

Oracles are derived from the design

D.

Oracles can be generated automatically using data generators

Which of the following is a possible reason for introducing a defect in software code?

A.

Rushing to meet a tight deadline to turn code over for testing

B.

Improper unit testing

C.

Improper system testing

D.

Focus on static testing over dynamic testing

An alphanumeric password must be between 4 and 7 characters long and must contain at least one numeric character, one capital (uppercase) letter and one lowercase letter of the alphabet.

Which one of the following sets of test cases represents the correct outcome of a two-value boundary value analysis applied to the password length? (Note: test cases are separated by a semicolon)

A.

1xA;aB11;Pq1ZZab;7iDD0a1x

B.

aB11;99rSp:5NnN10;7iDD0a1x

C.

1xB: aB11: 99rSp: 5NnN10; 4NnN10T; 44ghWn19

D.

1RhT;rSp53;3N3e10;8sBdby

Which ONE of the following options CORRECTLY describes one of the seven principles of the testing process?

A.

The objective of testing is to implement exhaustive testing and execute as many test cases as possible.

B.

Exhaustive testing can only be carried out using behavior-based techniques.

C.

It is impossible to test all possible combinations of inputs and preconditions of a system.

D.

Automated testing enables exhaustive testing.

Which ONE of the following elements is TYPICALLY NOT part of a test progress report?

A.

Obstacles and their workarounds

B.

A detailed assessment of product quality

C.

Test metrics to show the current status of the test process

D.

New or changed risks

Which of the following are the phases of the ISTQB fundamental test process?

A.

Test planning and control, Test analysis and design, Test implementation and execution, Evaluating ex t criteria and reporting. Test closure activities

B.

Test planning, Test analysis and design. Test implementation and control. Checking test coverage and reporting, Test closure activities

C.

Test planning and control, Test specification and design. Test implementation and execution, Evaluating test coverage and reporting, Retesting and regression testing, Test closure activities

D.

Test planning. Test specification and design. Test implementation and execution. Evaluating exit criteria and reporting. Retesting and test closure activities

Which of the following statements about test reports are TRUE?

I Test reports shall be approved by the test team.

II. Test reports shall give stakeholders information as basis for decisions.

Ill Test reports shall summarize what happened through a period of testing.

IV. Test reports shall be approved by the development team, the test team and the customer

V. Test reports shall include information about remaining risks.

A.

II, III, V

B.

I, II, IV

C.

I, III, v

D.

II, III, IV

Which of the following statements about branch coverage is true?

A.

The minimum number of test cases needed to achieve full branch coverage, is usually lower than that needed to achieve full statement coverage

B.

If full branch coverage has been achieved, then all unconditional branches within the code have surely been exercised

C.

If full branch coverage has been achieved, then all combinations of conditions in a decision table have surely been exercised

D.

Exercising at least one of the decision outcomes for all decisions within the code, ensures achieving full branch coverage

Consider an estimation session in which a six-member Agile team (Memb1..... Memb6) uses the planning poker technique to estimate a user story (in story points). The team members will use a set of cards with the following values: 1,2, 3,5, 8,13,21. Below is the outcome of the first round of estimation for this session:

Which of the following answers BEST describes how the estimation session should proceed?

A.

The final estimate of the user story in story points is determined by applying the three-point estimation technique with the following input values most optimistic estimate - 1, most likely estimate - 3, and most pessimistic estimate - 21

B.

Further estimation rounds should be performed until all team members will pick the card having the same value: this value will represent the final estimate of the user story in story points.

C.

The final estimate of the user story in story points is determined by calculating the average value between the most optimistic estimate of 21 story points (Memb4> and the most pessimistic estimate of 1 story point (Memb6)

D.

Memb6 and Memb4 which have produced the most pessimistic and the most optimistic estimates respectively, should explain the reasons of their choices to stimulate a discussion between all members before proceeding to another estimation round

A test status report SHOULD:

A.

Specify the impediments to carrying out the planned test activities in the reporting period and the corresponding solutions put in place to remove them

B.

Be produced as part of test completion activities and report unmitigated product risks to support the decision whether or not to release the product

C.

Always be based on the same template within an organisation, as its structure and contents should not be affected by the audience to which the report is presented.

D.

Specify the lines of communication between testing, other lifecycle activities, and within the organisation that were chosen at the outset of the test project.

Page: 4 / 7
Total 406 questions
Copyright © 2014-2025 Solution2Pass. All Rights Reserved