Black Friday Sale Special - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmaspas7

Easiest Solution 2 Pass Your Certification Exams

ISTQB-CTFL ISTQB Certified Tester Foundation Level (CTFL v4.0) Free Practice Exam Questions (2025 Updated)

Prepare effectively for your ISTQB ISTQB-CTFL ISTQB Certified Tester Foundation Level (CTFL v4.0) certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 5 / 7
Total 406 questions

A software system checks age in order to determine which welcome screen to display. Age groups are:

Group I: 0-12

Group II; 13-18

Group III: over 18

Which of the below represent boundary values?

A.

(-1.0.12.13.18,19)

B.

(-1.0,11.12.13,14,18.19)

C.

(0.12.13.18.19)

D.

(4.5.15.20)

The following rules determine the annual bonus to be paid to a salesman of a company based on the total annual amount of the sales made (referred to as TAS).

If the TAS is between 50k€ and 80k€, the bonus is 10%. If the TAS exceeds 80k€ by a value not greater than 40k€, the bonus is 15%. Finally, if the TAS

exceeds the maximum threshold which entitles to a 15% bonus, the bonus is 22%.

Consider applying equivalence partitioning to the TAS (Note: 1k€ = 1000 euros).

Which one of the following answers contain only test cases that belong to the same equivalence partition?

A.

TC1 = 81 k€; TC2= 97k€; TC3=111k€; TC4=118k€

B.

TC1 = 40k€; TC2= 46k€; TC3=51k€; TC4=53k€

C.

TC1 = 79k€; TC2= 80k€; TC3=81k€; TC4=82k€

D.

TC1 = 90k€; TC2= 110k€; TC3=125k€: TC4=140k€

Which of the following BEST describes exploratory testing?

A.

Exploratory testing is a suitable test technique which may replace both black-box and white-box test techniques

B.

Exploratory testing is a valid and useful black-box test technique since it focuses on test cases related to the architecture and design of a system

C.

Exploratory testing requires both solid specifications and much project time available for test execution

D.

Exploratory testing may be used within defined time periods, during which the tester may follow a test charter as a guide

You are testing a room upgrade system for a hotel. The system accepts three differed types of room (increasing order of luxury): Platinum. Silver and Gold Luxury. ONLY a Preferred Guest Card holder s eligible for an upgrade.

Below you can find the decision table defining the upgrade eligibility:

What is the expected result for each of the following test cases?

Customer A: Preference Guest Card holder, holding a Silver room

Customer B: Non Preferred Guest Card holder, holding a Platinum room

A.

Customer A; doesn't offer any upgrade; Customer B: offers upgrade to Gold luxury room

B.

Customer A: doesn't offer any upgrade; Customer B: doesn't offer any upgrade.

C.

Customer A: offers upgrade to Gold Luxury room; Customer B: doesn't offer any upgrade

D.

Customer A: offers upgrade to Silver room; Customer B: offers upgrade to Silver room.

Which of the following best describes the relationship between a test progress report and a test summary report?

A.

The test report prepared during a test activity may be referred to as a test progress report, while a test report prepared at the end of a test activity may be referred to as a test summary report.

B.

The test report prepared during a test activity may be referred to as a test summary report, while a test report prepared at the end of a test activity may be referred to as a test progress report.

C.

There is no difference between a test progress report and a test summary report.

D.

Both the test progress report and the test summary report should always be generated via an automated tool.

Which ONE of the following statements about state transition testing is correct?

A.

The state transition diagram explicitly shows all invalid transitions.

B.

The size of the state table depends on the number of possible transitions between the states

C.

Usually it is not possible to create tests to cover ell transitions and all stales

D.

All transitions between states are explicitly shown in the state table.

When should component integration tests be carried out?

A.

Integration tests should always be done after system tests

B.

Integration tests should be done at the customer's site, after acceptance tests

C.

Integration tests can be done before or after system tests

D.

Integration tests should always be done before system tests

Which of the following types of tools is BEST suited for determining source code compliance with the guidelines provided by a coding standard?

A.

Containerisation tool

B.

Fault seeding tool.

C.

Static analysis tool.

D.

Test data preparation tool

"Statement Testing" is part of;

A.

Specification Based testing

B.

Decision Testing

C.

Experience based testing

D.

Structured based testing

What is typically NOT included in a test progress report?

A.

Information about test obstacles during a test period

B.

Statistics on the success of each tester in finding bugs

C.

Changed risks within the test period

D.

Test status in relation to defined test metrics (including exit criteria)

In a museum there are staggered entrance fees:

    Free admission: children under 14 years

    Reduced admission: young people aged 14 and under 18, retiree, students and welfare recipients

    Regular price: all other persons

Which of the following four options describes the minimum set of test data that reaches 100% coverage of all valid equivalence classes for the admission fees?

A.

Child (12 years), student (23 years), retiree (68 years)

B.

Youth (16 years), adult (35 years), adult (60 years)

C.

Child (12 years), welfare recipient (45 years), retiree (68 years)

D.

Child (12 years), adult (35 years), retiree (68 years)

The following part of a business process flow is specified; REPEAT (book a bill) UNTIL (User presses Cancel). How many test cases are necessary in order to achieve 100% branch coverage of the process flow?

A.

4

B.

1

C.

2

D.

Infinite

Which of the following activities does NOT belong to a typical technical review?

A.

Pre-meeting preparation by reviewers

B.

Using checklists during the meeting

C.

Inviting end-users to the meeting

D.

Preparation of a review report

A software module to be used in a mission critical application incorporates an algorithm for secure transmission of data.

Which review type is most appropriate to ensure high quality and technical correctness of the algorithm?

A.

Walkthrough

B.

Informal Review

C.

Technical Review

D.

Management Review

Which of the following statements regarding the impact of the chosen software development lifecycle model on testing is true?

A.

The chosen software development lifecycle model has no impact on the number of regression test cases.

B.

The chosen software development lifecycle model influences when testing activities should start and end.

C.

The chosen software development lifecycle model determines the type of tests to be performed.

D.

The chosen software development lifecycle model does not affect the scope of the non-functional tests and the test tools to be used.

Which ONE of the following is a characteristic of exploratory testing?

A.

Effectiveness depends on the individual testers' skills

B.

Usually conducted when there is sufficient time for testing

C.

Testing without defined time-boxes

D.

Test cases are written once the specifications become available

You are testing the latest version of an air-traffic control system prior to production deployment using exploratory testing. After following an unusual sequence of input steps, the system crashes. After the crash, you document a defect report with the following information:

•Title: System crashes unexpectedly during input.

•Brief summary: System crashes when an unusual sequence of inputs is used.

•Version: V1.001

•Test: Exploratory testing prior to production deployment

•Priority: Urgent

•Risk: High

•References: Screenshot of crashed application

What critical Information Is missing from this report?

A.

Conclusions, recommendations, and approvals.

B.

Change history.

C.

Description of the defect to enable reproduction.

D.

Status of defect

Which of the following BEST describes a benefit of test automation?

A.

More subjective assessment

B.

Reduction in repetitive manual work

C.

Availability of the test automation tool vendor

D.

Negligible effort to maintain the test assets generated by the tool

Which ONE of the following options BEST describes the third test quadrant (Q3)?

A.

This test quadrant contains smoke tests and non-functional tests (except usability tests). These tests are often automated.

B.

This test quadrant is business-facing and criticizes the system. It contains exploratory testing, usability testing, and user acceptance testing.

C.

This test quadrant contains functional tests, examples, user story tests, user experience prototypes, API testing, and simulations. These tests check the acceptance criteria and can be manual or automated.

D.

This test quadrant is technology-facing and supports the team. These tests should be automated and included in the continuous integration (CI) process.

The four test levels used in ISTQB syllabus are:

1. Component (unit) testing

2. Integration testing

3. System testing

4. Acceptance testing

An organization wants to do away with integration testing but otherwise follow V-model. Which of the following statements is correct?

A.

It is allowed as organizations can decide on men test levels to do depending on the context of the system under test

B.

It is allowed because integration testing is not an important test level arc! can be dispensed with.

C.

It is not allowed because integration testing is a very important test level and ignoring i: means definite poor product quality

D.

It is not allowed as organizations can't change the test levels as these are chosen on the basis of the SDLC (software development life cycle) model

Page: 5 / 7
Total 406 questions
Copyright © 2014-2025 Solution2Pass. All Rights Reserved