Prepare effectively for your NABCEP PVIP PV Installation Professional (PVIP) Board Certification certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 1 / 3
Total 160 questions

Which of the following voltages should be included on the dc disconnected label to indicate MAXIMUM system voltage?

A.

Temperature-corrected V

B.

Non-temperature-corrected V

C.

Source circuit V

D.

600 V

Which of the following tests measures axial uplift when performing load testing of driven-pile foundation members

A.

Resistance to horizontal movement

B.

Resistance to downward (Sinking force

C.

Resistance to twisting

D.

Resistance to withdraw (pull-out) force

A 12 kW array has a measured output of 10 kW at STC due to mismatch losses. What is the mismatch loss percentage?

A.

10%

B.

12%

C.

15%

D.

16.7%

With all other environmental parameters being the same, which would be the expected reduction in KM performance of a PV system after an irradiance drop from 810w/m2 to 740w/m2?

A.

7.4%

B.

8.6%

C.

9.5%

D.

10.2%

A site survey indicates a residential roof with a 4:12 pitch facing 20° east of south. The local latitude is 35°N, and the optimal tilt for maximum annual production is equal to latitude. What adjustment should be made to compensate for the roof’s orientation and tilt to achieve near-optimal output?

A.

Increase array capacity by 5%

B.

Install adjustable racking to match 35° tilt

C.

Rotate modules 20° west to face true south

D.

No adjustment needed; output loss is negligible

A module’s Isc is 9A at STC. At 600 W/m² irradiance, what is the expected Isc?

A.

5.4A

B.

6.0A

C.

6.3A

D.

7.2A

A PV system installation utilizes micro inverters connected to each module of the array. Each micro inverter has a nominal rated output of 250WV. Single phase. The microinverters are listed so that multiple inverters may be connected in parallel to a single feeder circuit, and each inverter has an cable and connector rated for 30A. What is the MAXIMUM number of inverters that may be wired together on a single 30A feeder circuit?

A.

15

B.

17

C.

23

D.

28

A microinverter system uses 30 modules, each rated at 320W, with an inverter efficiency of 96%. The AC output is connected to a 208V three-phase service. What is the total three-phase power output?

A.

8.8 kW

B.

9.2 kW

C.

9.6 kW

D.

10.0 kW

Which load path connections need to be analyzed when determining live and dead loads on a PV array system installed directly to a metal seam roof?

A.

Module to rail to metal seam roof, metal seam roof sheathing/rather system.

B.

Module to rail to metal seam roof, metal seam roof to top plate system

C.

Module to rail, rail to roof sheathing, roof sheathing to wall, wall to base plate/foundation system

D.

Rail to metal seam roof, metal seam roof to top plate, top plate to wall system

A rooftop PV array has conductors running through a conduit exposed to sunlight on a roof with an ambient temperature of 40°C. The conduit is 2 inches above the roof surface. What is the NEC temperature adjustment factor for 90°C-rated conductors?

A.

0.87

B.

0.91

C.

0.96

D.

1.00

A 20 kW array has a measured output of 16 kW at 800 W/m² irradiance. What is the performance loss due to irradiance?

A.

10%

B.

20%

C.

25%

D.

30%

A system’s inverter output is 9 kW at 900 W/m² irradiance. What is the expected output at 1000 W/m²?

A.

9.5 kW

B.

10.0 kW

C.

10.5 kW

D.

11.0 kW

A PV array’s output drops by 8% due to shading from 10 AM to 2 PM. If unshaded output is 12 kW, what is the shaded output?

A.

10.0 kW

B.

10.6 kW

C.

11.0 kW

D.

11.2 kW

A PV connection is being made at the center of a 300 ft. long 200 feeder. See the attack diagram. The feeder originates in the upper third of the 800A main service panel (800A main breaker) with a 200A breaker and terminates in a 200A main-lug-only subpanel. The rated output of the PV system inverter is 100A.

Which are the NIMUMUM actions required to achieve an NEC-compliant installation?

A.

Install a 325A breaker at the PV source connection point on the portion of the feeder toward the subpanel. Increase the capacity of the feeder from the main panel board to 325A breaker to the bottom of the main service panel, away from the 800 main breaker.

B.

Install a 325A at the PV source connection point on the portion of the feeder toward the subpanel, increase the capacity of this portion of the feeder to 325A, add a 200A main breaker to the subpanel, and move the 200A breaker to bottom of the main service panel, away from the 800A main breaker.

C.

Install a 200A breaker at the PV source connection point on the portion on the portion of the feeder toward the subpanel and move the 200A breaker to the top of the main service panel, adjust to the 800A main breaker.

D.

Install a 200A breaker at the PV source connection point on the portion of the feeder toward the subpanel, maintain the capacity of the entire feeder, and move the 200A breaker to the bottom of the main service panel, away from the 800A main breaker.

Which insulation color is allowed for a current-carrying root top dc conductor on a functionally grounded 6kw PV system?

A.

Red

B.

White

C.

Green

D.

Green/yellow

A technician has been called to a scale due to a low-performing array. The technician will perform tests in the 24-source circuit combiner box. After putting on the correct PPE and turning off and performing lock.tagout of the inverted and combiner disconnect. Which is the next step to safely begin electrical testing in the combiner box?

A.

Open all fuse holders in the combiner box.

B.

Test for voltage on the positive out

C.

Remove any surge suppression devices from the circuits.

D.

Test for current on each source circuit coming into the combiner box.

A 5 kW system has a PR of 0.80 and operates at 4.5 PSH. What is the monthly energy output?

A.

540 kWh

B.

600 kWh

C.

675 kWh

D.

720 kWh

An installer has decided to use 31 in. long. 3.1/2 in diameter conical ground screws as the footings for a 3.840W solar electric system. Access to he is too difficult to pour concrete footings. The soll is classified as sandy loam. The design wind speed is 90 mph with an uplift force of 32 ibs/ft2. What is the MINIMUM number of screw required to resist uplift loads?

A.

8

B.

10

C.

12

D.

14

A PV system uses 10 AWG USE-2 wire for a 150-foot source circuit run with an Isc of 8A. The terminals are rated at 75°C. What is the ampacity of the conductor after applying NEC temperature and conduit fill adjustments at 35°C?

A.

30A

B.

35A

C.

40A

D.

45A

A 15 kW system has a total derate factor of 0.90. After 5 years, output drops by 2% annually due to degradation. What is the AC output in year 5?

A.

11.5 kW

B.

12.2 kW

C.

12.9 kW

D.

13.5 kW