ITFAS-Level-1 NICET Inspection and Testing of Fire Alarm Systems Level I Exam Free Practice Exam Questions (2025 Updated)
Prepare effectively for your NICET ITFAS-Level-1 Inspection and Testing of Fire Alarm Systems Level I Exam certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.
The flash rate of visible notification appliances shall be a minimum of how many flashes per second?
Secondary power for the fire alarm primary power supply shall be tested under which load?
According to NFPA 72, which statement is true as it pertains to the testing of audible alarm notification appliances?
Which NFPA standard regulates how to perform the test of engine driven generator?
Which of the following is the inspection frequency of the candela rating of visible appliances?
Smoke alarms in one- and two-family dwellings shall be replaced when they fail to operate or they have been in place a maximum of how many years?
According to NFPA 72, which date shall be marked on batteries?
Within what time limit shall a sprinkler waterflow alarm-initiating device activate?
After 15 years from initial installation, all fixed-temperature, nonrestorable heat detectors shall be replaced or have how many detectors per 100 laboratories tested?
Which three of the following parties gets notified that the system has been restored? (Choose three.)
How often does a technician test the manual operation of a master box on a public emergency alarm reporting system?
Which of the following options is required while conducting annual testing of an audiovisual device?
How frequently should control equipment for a fire alarm system that is unmonitored for alarm, supervisory, and trouble signals be visually inspected?
The inspection phase, as opposed to the testing phase, of system control equipment should concentrate on which of the following tasks?
An abnormal condition where a system, component, or function is out of order, and the condition can result in the system or unit not functioning when required is called which of the following terms?
When is a shunt trip operated to power down an elevator?
Records of inspections, testing, and maintenance shall be provided in accordance with which section of NFPA 72?
After successful completion of an inspection, who shall be responsible for maintaining the permanent records?
Which instrument is commonly used to determine battery voltage and charging current?
Which two of the following should occur when a signal silence switch for a notification alarm is activated? (Choose two.)