Prepare effectively for your Nutanix NCS-Core Nutanix Certified Services Core Infrastructure Professional (NCS-Core 6.8) certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 2 / 5
Total 309 questions

A consultant is installing Nutanix AOS on Cisco UCS.

Which method should be used to install AOS on UCS hardware platforms?

A.

Foundation Central

B.

Foundation Applet

C.

Foundation VM

D.

Foundation as a Service

An administrator is deploying several new application VMs to a Nutanix cluster. The application is very transactional with a 28/72 random, read/write ratio.

What should the administrator do?

A.

Add a minimum of four SSDs to each node to ensure all writes go to the SSDs.

B.

Add a minimum of four virtual disks to each VM, and aggregate them on guest OS level.

C.

Add one large SSD to each node and enable Flash Mode for the VMs.

D.

Add one large virtual disk to each VM. and use it for all application data.

A customer needs to meet the following requirements for their business critical application:

* SQL Servers must be on specific hosts to lower licensing costs.

* Oracle RAC servers must be on separate hosts for licensing reasons

Which policy or policies should be implemented to meet these requirements?

A.

Configure VM-VM anti-affinity policy.

B.

Configure VM-VM affinity policy.

C.

Configure both VM-Host and VM-VM affinity policy.

D.

Configure VM-Host affinity policy.

After an onsite cluster deployment, a consultant prepares the deliverables for a project closeout.

Which two data in the As-Built Guide require adjustment or might be missing completely? (Choose two.)

A.

Nutanix Node Port Layout

B.

AHV Host information

C.

Physical Rack Layout

D.

Cluster information

Which two files should be downloaded to deploy Foundation VM on VMware ESXI or AHV Hypervisors? (Choose two.)

A.

foundation_VM-version-disk-0.geow2

B.

foundation_VM-version. tar

C.

foundation_VM-version. vmdk

D.

foundation-version.tar.gz

A consultant is reviewing a customers Pre-delivery Questionnaire.

The customer wants to deploy their cluster with ESXi as the hypervisor with vSphere Distributed Switch. The customer will be using Cisco Nexus 9k as their switch choice In the kick-off call, it is confirmed that the customer has a business requirement to use LACP in their environment.

What should the consultant ensure that the customer configures on the port-channel interface before deployment?

A.

show pore-channel

B.

no lacp graceful-convergence

C.

service unsupported-transceiver

D.

no lacp suspend-individual

A consultant is imaging a Nutanix cluster with VMware ESXi. Foundation returns an error that the media is not a supported ISO. The consultant checks the whitelist file in Foundation and confirms that the version of the ISO is not listed.

Which three actions should the consultant take to resolve this issue? (Choose three.)

A.

Replace and save whitelist file in Foundation

B.

Obtain the MD5 checksum of the ISO and confirm MD5 checksum of ISO is listed.

C.

Download the iso_whitelist.json from the Support portal.

D.

Edit the whitelist file in Foundation.

E.

Restart the imaging process in Foundation.

A consultant is performing a Nutanix Cluster installation on Dell XC Core hardware. The consultant decides to use Foundation Portable for Mac to perform the installation. When the consultant arrives onsite, Foundation Portable is unable to locate the new nodes.

Which log should the consultant check to troubleshoot this issue?

A.

/home/nutanix/foundation/log

B.

~/data/logs/foundation.out

C.

foundation.app/contents/resouces/log

D.

~/data/logs/foundation

A consultant is working on an expansion project for a customer that has an existing 7-node RF2 cluster. The customer has purchased four more nodes to add to the cluster. All of the hardware is identical between the existing hardware and newly purchased hardware.

Currently, the 7-node cluster has the following utilization:

•CPU: 48%

•Memory: 66%

•Storage: 91%

During the kick-off call, the customer mentioned they'd like to reserve storage capacity on the cluster if a node were to fail in the future.

What's the safest and best way to implement this on the cluster?

A.

Expand the cluster with the additional nodes and enable Reserve Rebuild Capacity.

B.

Enable Reserve Rebuild Capacity and expand the cluster with the additional nodes.

C.

Expand the cluster with the additional nodes and enable HA reservation.

D.

Enable HA reservation and expand the cluster with the additional nodes.

An administrator is responsible for the following Nutanix Enterprise Cloud environment:

• A central datacenter with a 20-node cluster with 1.5PB of storage

• Five remote sites each with a 4-node cluster with 200TB storage

The remote sites are connected to the datacenter via 1GB links with an average latency of 6 ms RTT. What is the minimum RPO the administrator can achieve for this environment?

A.

0 minutes

B.

15 minutes

C.

1 hour

D.

6 hours

What reference materials should be provided to the customer during the Knowledge Transfer?

A.

Questionnaire, technical slides and checklist, links to documentation and resources

B.

As-Built Guide, technical slides and checklist, Network Diagram

C.

As-Built Guide, Project Plan, links to documentation and resources

D.

As-Built Guide, technical slides and checklist, links to documentation and resources

A customer wants to run SAP HANA on a Nutanix cluster with the following characteristics:

• AHV nodes

• SAP HANA version 2

• Production database files

Which configuration should be recommended to the customer?

A.

Start with a cluster containing three or more nodes

B.

Enable only compression for the container that contains the Production database

C.

Do not enable compression, deduplication. or erasure coding on the storage container

D.

Plate the SAP HANA Database on the same socket as CVM

The consultant is deploying a 20-node AHV cluster, as part of a Nutanix Files deployment.

How many FSVMs can the consultant deploy in this environment?

A.

16

B.

18

C.

20

D.

22

Which two components must be identified to validate that software compatibility requirements are met for Nutanix Cluster Installation? (Choose two.)

A.

Guest OS

B.

AOS

C.

Firmware

D.

Hypervisor

Refer to the exhibit.

An administrator creates a security policy that isolates their financial application from accessing the Internet When viewing the policy in Prism Central, several connections from the application are outbound to the Internet.

What is causing this issue with the policy?

A.

The 0.0.0.0 address was not specified in the outbound rule.

B.

The blocked connections are illustrated for information only.

C.

The Activate box was not checked in the rule, so it is not enforcing.

D.

The policy has been left in monitor mode instead of enforcing mode.

An administrator is supporting a business critical environment and deploys metro availability to achieve a zero data loss configuration. The two clusters are connected by a 1GbE connection. A new workload is going to be deployed to this cluster. This workload requires a sustained 150MB/S of write throughput and 20MB/s of read throughput.

Which change must be made to deploy the workload successfully on this cluster?

A.

The bandwidth must be increased to support this workload.

B.

The workload must be configured to read at greater than 12.5MB/S.

C.

The replication frequency must be less than 60 minutes.

D.

Zero data loss nearsync must be used to support this workload.

A customer has a G6 AHV cluster with 4x10GbE NICs on each node and the following configuration:

* Networking is set to default

* Only two NICs are connected

The customer receives the following critical message:

The NIC is disconnected from the switch, or the switchport is failing.

What should the consultant verify to resolve the issue?

A.

The NICs are configured for active-backup.

B.

The VLANs are configured correctly on the switch or tagged on the cluster.

C.

The other two 10GbE connections are removed from the default bond.

D.

The NICs are connected for balance-slb.

For a new AHV cluster installation, a customer has 20 NX-8155-G6 nodes with quad port SFP NICs.

The customer wants to meet the following guidelines:

* Take advantage of all available 10GbE links

* Achieve maximum throughput per VM

* Use of redundant ToR switches

* Fastest reconvergence during link failure

How should the load balancing be configured on the host?

A.

ovs-vsctl set port br0-up bond_mode=balance-slb

ovs-vsctl set port br0-up other_config:bond-rebalance-interval=30000

ovs-vsctl set port br0 tag=10

B.

ovs-vsctl set port br0-up bond_mode=active-backup

ovs-vsctl set port br0-up other_config:bond-rebalance-interval=30000

C.

ovs-vsctl set port br0-up bond_mode=balance-slb

D.

ovs-vsctl set port br0-up other_config:lacp-fallback-ab=true

ovs-vsctl set port br0-up lacp=active

ovs-vsctl set port br0-up bond_mode=balance-tcp

A consultant is setting up a new vSphere cluster. Customer requirements are as follows:

* VMs should automatically failover to another host if the host crashes

* Host CPU and Memory resources should be evenly balanced

* New VMs should be placed on the host with the most resources available

Which two settings should be turned on to meet the requirements? (Choose two.)

A.

vShpere DRS

B.

vSphere HA

C.

vSphere vMotion

D.

vSphere Power Management

During the knowledge transfer session, a consultant conducts a storage management demo. In the Creating a Storage Container workflow, the customer notices the Reserved Capacity parameter and asks for best practices related to it.

How should the consultant respond?

A.

Nutanix recommends to configure at least 2 storage pools with at least one storage container each.

B.

Do not reserve less than 90% of the total space in the storage pool.

C.

Reserve capacity for a storage container only if the storage pool consists of single storage container.

D.

Reserve capacity for a storage container only if the storage pool consists of multiple storage containers.