Weekend Sale - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmaspas7

Easiest Solution 2 Pass Your Certification Exams

NCS-Core Nutanix Certified Services Core Infrastructure Professional (NCS-Core 6.8) Free Practice Exam Questions (2025 Updated)

Prepare effectively for your Nutanix NCS-Core Nutanix Certified Services Core Infrastructure Professional (NCS-Core 6.8) certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 1 / 5
Total 309 questions

A consultant and customer agree on a scope of services regarding the deployment of a new Nutanix cluster.

Which two products does this scope apply to? (Choose two.)

A.

Foundation

B.

Flow

C.

X-Ray

D.

Prism Central

What is the default password shipped on new NX hardware from the factory for the ADMIN user on IPMI?

A.

node-serial-number

B.

nutanix/4u

C.

block-serial-number

D.

ADMIN

As a consultant concludes the project for deploying a new cluster, the customer expresses plans to repeat the process in-house for one of the company's dark site locations.

What three items can the consultant deliver in closing to help ensure customer's success in deploying and supporting Nutanix clusters?

A.

. Creating an account for access to Nutanix Support Portal

· External USB drive

. Offline NCC bundle

B.

· A trial license activation code for Prism Starter

. Creating an account for access to Nutanix Support Portal

. Guide for dark site deployments using Nutanix standards

C.

. Generating cluster licenses

. What are binaries and where can they be downloaded

. Creating an account for accessing the Nutanix Support Portal

D.

· External USB drive

. Access to Nutanix FTP

. Encrypted key required for accessing clusters

A consultant is running Foundation. The cluster creation fails during the process. The host logs confirm that the nodes have been successfully imaged. The consultant decides to create the cluster manually.

Which command should the consultant use?

A.

cluster -c IP_CVM_A, IP_CVM_B, IP_CVM_n

B.

cluster create -s IP_CVM_A, IP_CVM_B, IP_CVM_n

C.

cluster -s IP_CVM_A, IP_CVM_B, IP_CVM_n create_manual

D.

cluster -s IP_CVM_M, IP_CVM_B, IP_CVM_n create

A customer is considering increasing the Redundancy Factor from 2 to 3 for a Nutanix cluster in their existing environment.

Which option would provide the company with the optimal solution?

A.

Four Compute Nodes with 25% available disk space

B.

Six Compute Nodes with 25% available disk space

C.

Three Compute Nodes with 40% available disk space

D.

Five Compute Nodes with 40% available disk space

Imaging fails for one or more nodes in the cluster

A log file displays this output:

Interface ethO has an uplink.

Downloading livefs files... Connecting to 10.249.230.171:8000 (10.249.230.171:8000) [80.852033] random: nonblocking pool is initialized

tar: short read livecd files not found.

What is the possible root cause?

A.

IPMI credentials are invalid.

B.

There is a problem connecting to the Foundation VM.

C.

Hypervisor version is not on the whitelist (iso_whitelist. j son).

D.

AOS version is incompatible.

A customer has the following requirement for a Nutanix cluster:

    Must support high-performance Nutanix Volumes iSCSI workloads

    Must utilize AHV nodes

    Must use 10 GbE interface

How should the customer optimize networking?

A.

Enable Jumbo Frame on just the Host

B.

Convert Cluster to ESXi and enable Jumbo Frame on Host and CVM

C.

Enable Jumbo Frames on just the CVM

D.

Enable the use of Jumbo Frame on Host and CVM

A consultant attempts to perform an LCM inventory after successfully creating the cluster, but is met with the following error:

LCM Exception [LcmExceptionHandler]: Could not find a module for entity with reference name nutanix.ncc.update

What is the most likely reason LCM inventory/update is failing?

A.

Nameservers are not reachable.

B.

IPMI network is unable to reach the internet.

C.

Clusters must be licensed before LCM inventory.

D.

Nutanix CVMs are blocking TCP port 54.

Refer to the exhibit.

An administrator has an existing cluster and needs to improve performance using AHV Turbo. Which two items are required to achieve even greater performance? (Choose two.)

A.

Workloads are multi-threaded.

B.

VMs have one vCPU configured.

C.

VMs have multi-queue disabled.

D.

VMs have more than one vCPU.

An alert about RX errors on eth2 on a node is reported in the cluster. The administrator logs in to the CVM in question, checks the ping_* files in the data/logs/syststats folder, and notices intermittent ping loss.

The node in question has the following network configuration:

Which action should be used to troubleshoot without disrupting the VMs running on this node?

A.

Replace the cable from eth2 to the switch

B.

Remove eth3 from br0-up and monitor for new alerts

C.

Check the port on the switch side for any errors

D.

Enable balance-s1b on br0-up and monitor if a problem persists

An administrator receives an error indicating that the CVMs in the cluster are not syncing to any NTP servers. An investigation of the issue finds:

• The NTP servers are configured in Prism

• The time on all CVMs is the same

• Both the CVMs and AHV hosts are configured for the UTC time zone

Which two steps can be taken to troubleshoot this issue? (Choose two.)

A.

Confirm that the NTP servers are reachable from the CVMs.

B.

Restart genesis on all CVMs.

C.

On a CVM. run the command a Hash ntpq -pn.

D.

Restart the chronos service on all CVMs.

A customer racks all nodes in the new cluster. The customer does not allow IPv6 for node discovery.

The consultant is not allowed to use the consultant’s own flat switch in the customer’s environment.

Which step should the consultant take to resolve this issue?

A.

Bare metal image all nodes with Foundation VM.

B.

Image each node individually with Foundation VM.

C.

Connect to the top of rack switch and discover the nodes with IPv4.

D.

Open a console to all nodes and statically assign IP addresses.

Refer to Exhibit:

A consultant is conducting cluster deployment using Foundation VM on a laptop.

What troubleshooting step is required?

A.

Disable local machine firewall to ensure its not blocking traffic.

B.

Verify Foundation VM is configured with at least 4GB of memory.

C.

Confirm that TCP port 5123 is open.

D.

Ensure that adaptive endpoint security agents are enabled.

A consultant is planning to use a flat switch for installation.

What is the network requirement for Foundation VM, CVM, Hypervisor, and IPMI

A.

Foundation VM, CVM, and Hypervisor must be on the same subnet. IPMI can be on a different subnet.

B.

CVM, Hypervisor, and IPMI must be on the same subnet. Foundation VM can be on a different subnet.

C.

Foundation VM and CVM must be on the same subnet. Hypervisor and IPMI can be on a different subnet.

D.

Foundation VM, CVM, and IPMI must be on the same subnet. Hypervisor can be on a different subnet.

Which Nutanix feature creation is described in the Knowledge Transfer?

A.

Calm Blueprints

B.

REST API

C.

Self Service Portal

D.

Data Protection Domain

A consultant needs to review a customer’s switch port configuration to identify any issues. Other customer requirements are as follows:

* Leverage LACP

* Native VLAN will not be used

* Use Multiple Upstream switches

* Use VLANs 20-25 and 30

* LACP Fallback has been Enabled

* vPC or MLAG has been configured

What must be included in a configuration in order to meet these requirements?

A.

Native VLAN set to default

Ports trucked to allow all necessary VLANs

B.

Native VLAN set to default

Ports in access mode to allow all necessary VLANs

C.

Native VLAN set to 30

Ports Trunked to allow all necessary VLANs

D.

Native VLAN set to 30

Ports in access mode to allow all necessary VLANs

A consultant creates a four-node AHV cluster with two 1GbE (eth0, etc1) and two 10GbE (eth2, eth3) NICs per node. The 1GbE NICs will not be placed into service, but the customer wants the network to be preconfigured for their eventual use.

The consultant removes the 1GbE NIC from the default bond and creates a second bridge(br1), but is unable to add the 1GbE NIC using the below command:

manage_ovs –bridge_name br1 –interfaces 1g –bond_name br1-up update_uplinks

Which parameter is missing from this command?

A.

--bond_duplex full

B.

--require_link=false

C.

--interfaces eth0

D.

--bridge_duplex full

A consultant successfully completes a Foundation using a flat switch. The consultant then works with the customer to move the cluster over to their production network. After the move, the CVMs and hypervisors can no longer communicate, which prevents the cluster from starting.

Which option should be used to resolve this issue?

A.

If the IPMI is in use, check that the IPMI can ping the default gateway over IPv6.

B.

Make sure that the IPMI and CVM VLAN is manually tagged on the Host and CVM.

C.

Verify that IPv6 Link Local and DHCP is enabled on all switch ports.

D.

If using VLANs, confirm the hypervisor/CVM VLAN is set as Native on the switch ports.

Refer to the exhibit.

What is the purpose of eth2 on the CVMs?

A.

RDMA Network Segmentation

B.

iSCSI connectivity

C.

Remote site connectivity

D.

Network Segmentation

A customer wants to use NIC teaming on an ESXi host using a vSphere Standard Switch configured with the Route based on physical NIC load load balancing option. The customer does not see the option when editing the Teaming and Failover settings for the switch.

How should the consultant resolve this issue?

A.

Change the load balancing option on the switch.

B.

Add a vSphere Distributed Switch

C.

Add another physical NIC to the team.

D.

Install a vCenter server to manage the switch

Page: 1 / 5
Total 309 questions
Copyright © 2014-2025 Solution2Pass. All Rights Reserved