Summer Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: s2p65

Easiest Solution 2 Pass Your Certification Exams

NCSE-Level-1 Nutanix Certified Systems Engineer (NCSE): Level 1 Free Practice Exam Questions (2025 Updated)

Prepare effectively for your Nutanix NCSE-Level-1 Nutanix Certified Systems Engineer (NCSE): Level 1 certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 2 / 2
Total 83 questions

A prospect needs to refresh their environment but has a very small budget for the project. Four years after their last infrastructure refresh, the prospect's core datacenter is only running at 40% utilization. In addition, they have 25 satelite offices.

Each office has a requirement to run 4 to 6 VMs locally.

Which two Nutanix platform capabilities should the SE hlight to address the prospects concerns? (Choose two)

A.

Multi-site management

B.

Pay as you grow

C.

Automated data storage tiering

D.

Software only

E.

Single node backup

Refer to the exhibit.

Based on the Sizing scenario, what level of resiliency can be inferred about the configuration?

A.

RF3

B.

N+1

C.

N+0

D.

N+2

A prospect that is currently virtualized using Dell servers is willing to provide a Live Optics report to assist with sizing a partial infrastructure refresh with Nutanix.

Which two items from an approach for sampling accurate sizing data with

Live Optics? (Choose one)

A.

24-hour windows during a period of peak utilization

B.

12-hour windows during any period

C.

24-hour windows during any period

D.

12-hour windows during a period of peak utilization

After a meeting with a new prospect to demo Nutanix for a Splunk opportunity, the prospect requests a POC.

To qualify the need for a POC, which question should an SE ask the prospect first?

A.

Are you considering other solutions?

B.

What do you plan to evaluate?

C.

Is this project budgeted?

D.

Which version of Splunk are you running?

Page: 2 / 2
Total 83 questions
Copyright © 2014-2025 Solution2Pass. All Rights Reserved