Prepare effectively for your PECB ISO-IEC-27001-Lead-Implementer PECB Certified ISO/IEC 27001 : 2022 Lead Implementer exam certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2026, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Scenario 10: CircuitLinking is a company specializing in water purification solutions, designing and manufacturing efficient filtration and treatment systems for both residential and commercial applications. Over the past two years, the company has actively implemented an integrated management system (IMS) that aligns with both ISO/IEC 27001 for information security and ISO 9001 for quality management. Recently, the company has taken a significant step forward by applying for a combined audit, aiming to achieve certification against both ISO/IEC 27001 and ISO 9001.

In preparation for the certification audit, CircuitLinking ensured a clear understanding of ISO/IEC 27001 within the company, identified key subject-matter experts to assist the auditors, allocated sufficient resources, performed a self-assessment, and gathered all necessary documentation in advance. Following the successful completion of the Stage 1 audit (which focused on verifying the design of the management system), the Stage 2 audit was conducted to examine the implementation and effectiveness of the information security and quality management systems.

One of the auditors, Megan, was a previous employee of the company. To uphold the integrity of the certification process, the company notified the certification body about the potential conflict of interest and requested an auditor change. Subsequently, the certification body selected a replacement, ensuring impartiality. Additionally, the company requested a background check of the audit team members; however, the certification body denied this request. The necessary adjustments to the audit plan were made, and transparent communication with stakeholders was maintained.

The audit process continued seamlessly under the new auditor’s guidance. Upon audit completion, the certification body evaluated the results and conclusions of the audit and CircuitLinking's public information, and awarded CircuitLinking the combined certification.

A recertification audit for CircuitLinking was conducted to verify that the company's management system continued to meet the required standards and remained effective within the defined scope of certification. CircuitLinking had implemented significant changes, including a major overhaul of its information security processes, new technology platforms, and adjustments to comply with recent legislative changes. Due to these updates, the recertification audit required a Stage 1 assessment to evaluate the impact.

Which of the following does NOT follow auditing best practices? Refer to Scenario 10.

A.

CircuitLinking’s request for background information on audit team members being denied

B.

CircuitLinking applying for a combined audit

C.

The certification body evaluating the audit findings

D.

The company notifying the certification body about a conflict of interest

SkyFleet did not submit action plans within the specified deadline and was not recommended for certification. Is this acceptable?

A.

No, SkyFleet should receive an extension

B.

No, SkyFleet should be recommended for certification

C.

Yes, SkyFleet should not be recommended for certification

Question:

Who is responsible for ensuring that the ISMS achieves its intended outcomes?

A.

IT Department

B.

Top management

C.

ISMS project manager

Scenario 10: CircuitLinking is a company specializing in water purification solutions, designing and manufacturing efficient filtration and treatment systems for both residential and commercial applications. Over the past two years, the company has actively implemented an integrated management system (IMS) that aligns with both ISO/IEC 27001 for information security and ISO 9001 for quality management. Recently, the company has taken a significant step forward by applying for a combined audit, aiming to achieve certification against both ISO/IEC 27001 and ISO 9001.

In preparation for the certification audit, CircuitLinking ensured a clear understanding of ISO/IEC 27001 within the company and identified key subject-matter experts to assist the auditors. It also allocated sufficient resources and performed a self-assessment to verify that processes were clearly defined, roles and responsibilities were segregated, and documented information was maintained. To avoid delays, the company gathered all necessary documentation in advance to provide evidence that procedures were in place and effective.

Following the successful completion of the Stage 1 audit, which focused on verifying the design of the management system, the Stage 2 audit was conducted to examine the implementation and effectiveness of the information security and quality management systems.

One of the auditors, Megan, was a previous employee of the company. To uphold the integrity of the certification process, the company notified the certification body about the potential conflict of interest and requested an auditor change. Subsequently, the certification body selected a replacement, ensuring impartiality. Additionally, the company requested a background check of the audit team members; however, the certification body denied this request. The necessary adjustments to the audit plan were made, and transparent communication with stakeholders was maintained.

The audit process continued seamlessly under the new auditor’s guidance. Upon audit completion, the certification body evaluated the results and conclusions of the audit and CircuitLinking's public information and awarded CircuitLinking the combined certification.

A recertification audit for CircuitLinking was conducted to verify that the company's management system continued to meet the required standards and remained effective within the defined scope of certification. CircuitLinking had implemented significant changes to its management system, including a major overhaul of its information security processes, the adoption of new technology platforms, and adjustments to comply with recent changes in industry legislation. Due to these substantial updates, the recertification audit required a Stage 1 assessment to evaluate the impact of these changes.

According to Scenario 10, is the request made by CircuitLinking to replace Megan acceptable?

A.

Yes, but no other auditor should have been assigned in her place

B.

No, as long as she remains impartial, she can audit CircuitLinking

C.

Yes, considering her past as an employee for CircuitLinking

D.

No, only the same auditor can complete the full audit cycle

In the SABSA framework, which layer is concerned with viewing the services at a high level?

A.

Physical security architecture

B.

Logical security architecture

C.

Component security architecture

Scenario 7: InfoSec, based in Boston, MA, is a multinational corporation offering professional electronics, gaming, and entertainment products. Following several information security incidents, InfoSec has decided to establish teams of experts and implement measures to prevent potential incidents in the future.

Emma, Bob, and Anna were hired as the new members of InfoSec's information security team, which consists of a security architecture team, an incident response team (IRT), and a forensics team. Emma’s job is to create information security plans, policies, protocols, and training to prepare InfoSec to respond to incidents effectively. Emma and Bob would be full-time employees of InfoSec, whereas Anna was contracted as an external consultant.

Bob, a network expert, will implement a screened subnet network architecture. This architecture will isolate the demilitarized zone (DMZ), to which hosted public services are attached, and InfoSec's publicly accessible resources from their private network. Thus, InfoSec will be able to block potential attackers from causing unwanted events inside the company's network. Bob is also responsible for ensuring a thorough evaluation of the nature of an unexpected event, including how the event happened and what or whom it might affect.

On the other hand, Anna will create records of the data, reviews, analyses, and reports to keep evidence for disciplinary and legal action and use them to prevent future incidents. To do the work accordingly, she should be aware of the company's information security incident management policy beforehand. Among others, this policy specifies the type of records to be created, the place where they should be kept, and the format and content that specific record types should have.

As part of InfoSec's initiative to strengthen information security measures, Anna will conduct information security risk assessments only when significant changes are proposed and will document the results of these risk assessments. Upon completion of the risk assessment process, Anna is responsible for developing and implementing a plan for treating information security risks and documenting the risk treatment results.

Furthermore, while implementing the communication plan for information security, InfoSec’s top management was responsible for creating a roadmap for new product development. This approach helps the company to align its security measures with the product development efforts, demonstrating a commitment to integrating security into every aspect of its business operations.

InfoSec uses a cloud service model that includes cloud-based apps accessed through the web or an application programming interface (API). All cloud services are provided by the cloud service provider, while data is managed by InfoSec. This introduces unique security considerations and becomes a primary focus for the information security team to ensure data and systems are protected in this environment.

Based on this scenario, answer the following question:

Does InfoSec adhere to the requirements of ISO/IEC 27001 when conducting information security risk assessments?

A.

Yes, it adhered to ISO/IEC 27001 requirements

B.

No, as it should perform them at planned intervals as well

C.

No, as it should perform them twice a year, regardless of significant changes

Scenario 4: TradeB is a newly established commercial bank located in Europe, with a diverse clientele. It provides services that encompass retail banking, corporate banking, wealth management, and digital banking, all tailored to meet the evolving financial needs of individuals and businesses in the region. Recognizing the critical importance of information security in the modern banking landscape, TradeB has initiated the implementation of an information security management system (ISMS) based on ISO/IEC 27001. To ensure the successful implementation of the ISMS, the top management decided to contract two experts to lead and oversee the ISMS implementation project.

As a primary strategy for implementing the ISMS, the experts chose an approach that emphasizes a swift implementation of the ISMS by initially meeting the minimum requirements of ISO/IEC 27001, followed by continual improvement over time. Additionally, under the guidance of the experts, TradeB opted for a methodological framework, which serves as a structured framework and a guideline that outlines the high-level stages of the ISMS implementation, the associated activities, and the deliverables without incorporating any specific tools.

The experts analyzed the ISO/IEC 27001 controls and listed only the security controls deemed applicable to the company and its objectives. Based on this analysis, they drafted the Statement of Applicability. Afterward, they conducted a risk assessment, during which they identified assets, such as hardware, software, and networks, as well as threats and vulnerabilities, assessed potential consequences and likelihood, and determined the level of risks based on a methodical approach that involved defining and characterizing the terms and criteria used in the assessment process, categorizing them into non-numerical levels (e.g., very low, low, moderate, high, very high). Explanatory notes were thoughtfully crafted to justify assessed values, with the primary goal of enhancing repeatability and reproducibility.

Then, they evaluated the risks based on the risk evaluation criteria, where they decided to treat only the risks of the high-risk category. Additionally, they focused primarily on the unauthorized use of administrator rights and system interruptions due to several hardware failures. To address these issues, they established a new version of the access control policy, implemented controls to manage and control user access, and introduced a control for ICT readiness to ensure business continuity.

Their risk assessment report indicated that if the implemented security controls reduce the risk levels to an acceptable threshold, those risks will be accepted.

Based on the scenario above, answer the following question:

Based on scenario 4, from which source did TradeB's ISMS implementation draw its methodological framework?

A.

ISO/IEC 27003

B.

ISO 10006

C.

COBIT 5

Infralink is a medium-sized IT consultancy firm headquartered in Dublin, Ireland. It specializes in secure cloud infrastructure, software integration, and data analytics, serving a diverse client base in the healthcare, financial services, and legal sectors, including hospitals, insurance providers, and law firms. To safeguard sensitive client data and support business continuity, Infralink has implemented an information security management system (ISMS) aligned with the requirements of ISO/IEC 27001.

In developing its security architecture, the company adopted services to support centralized user identification and shared authentication mechanisms across its departments. These services also governed the creation and management of credentials within the company. Additionally, Infralink deployed solutions to protect sensitive data in transit and at rest, maintaining confidentiality and integrity across its systems.

In preparation for implementing information security controls, the company ensured the availability of necessary resources, personnel competence, and structured planning. It conducted a cost-benefit analysis, scheduled implementation phases, and prepared documentation and activity checklists for each phase. The intended outcomes were clearly defined to align security controls with business objectives.

Infralink started by implementing several controls from Annex A of ISO/IEC 27001. These included regulating physical and logical access to information and assets in accordance with business and information security requirements, managing the identity life cycle, and establishing procedures for providing, reviewing, modifying, and revoking access rights. However, controls related to the secure allocation and management of authentication information, as well as the establishment of rules or agreements for secure information transfer, have not yet been implemented. During the documentation process, the company ensured that all ISMS-related documents supported traceability by including titles, creation or update dates, author names, and unique reference numbers. Based on the scenario above, answer the following question.

Based on scenario 3. did Infralink adequately prepare for the implementation of the information security controls?

A.

No, it only prepared technical specifications

B.

No, it should not have identified intended results before implementation.

C.

Yes, it undertook appropriate preparation.

Based on scenario 3. did Infralink adequately prepare for the implementation of the information security controls?

A.

No, it only prepared technical specifications

B.

No, it should not have identified intended results before implementation.

C.

Yes, it undertook appropriate preparation.

Scenario 8: SunDee is an American biopharmaceutical company, headquartered in California, the US. It specializes in developing novel human therapeutics, with a focus on cardiovascular diseases, oncology, bone health, and inflammation. The company has had an information security management system (ISMS) based on SO/IEC 27001 in place for the past two years. However, it has not monitored or measured the performance and effectiveness of its ISMS and conducted management reviews regularly

Just before the recertification audit, the company decided to conduct an internal audit. It also asked most of their staff to compile the written individual reports of the past two years for their departments. This left the Production Department with less than the optimum workforce, which decreased the company's stock.

Tessa was SunDee's internal auditor. With multiple reports written by 50 different employees, the internal audit process took much longer than planned, was very inconsistent, and had no qualitative measures whatsoever Tessa concluded that SunDee must evaluate the performance of the ISMS adequately. She defined SunDee's negligence of ISMS performance evaluation as a major nonconformity, so she wrote a nonconformity report including the description of the nonconformity, the audit findings, and recommendations. Additionally, Tessa created a new plan which would enable SunDee to resolve these issues and presented it to the top management

Based on scenario 8. does SunDee comply with ISO/IEC 27001 requirements regarding the monitoring and measurement process?

A.

Yes. because the standard does not Indicate when the monitoring and measurement phase should be performed

B.

Yes, because the standard requires that the monitoring and measurement phase be conducted every two years

C.

No, because even though the standard does not imply when such a process should be performed, the company must have a monitoring and measurement process in place

Org Y. a well-known bank, uses an online banking platform that enables clients to easily and securely access their bank accounts. To log in. clients are required to enter the one-time authorization code sent to their smartphone. What can be concluded from this scenario?

A.

Org Y has implemented an integrity control that avoids the involuntary corruption of data

B.

Org Y has incorrectly implemented a security control that could become a vulnerability

C.

Org Y has implemented a security control that ensures the confidentiality of information

What risk treatment option has Company A Implemented If it has decided not to collect information from users so that It is not necessary to implement information security controls?

A.

Risk avoidance

B.

Risk retention

C.

Risk modification

Following a repotted event, an Information security event ticket has been completed and its priority has been assigned. Then, the event has been evaluated to determine If it is an information security incident, which phase of the incident management has been completed?

A.

initial assessment and decision

B.

Detection and reporting

C.

Evaluation and confirmation

Scenario 8: SunDee is an American biopharmaceutical company, headquartered in California, the US. It specializes in developing novel human therapeutics, with a focus on cardiovascular diseases, oncology, bone health, and inflammation. The company has had an information security management system (ISMS) based on SO/IEC 27001 in place for the past two years. However, it has not monitored or measured the performance and effectiveness of its ISMS and conducted management reviews regularly

Just before the recertification audit, the company decided to conduct an internal audit. It also asked most of their staff to compile the written individual reports of the past two years for their departments. This left the Production Department with less than the optimum workforce, which decreased the company's stock.

Tessa was SunDee's internal auditor. With multiple reports written by 50 different employees, the internal audit process took much longer than planned, was very inconsistent, and had no qualitative measures whatsoever Tessa concluded that SunDee must evaluate the performance of the ISMS adequately. She defined SunDee's negligence of ISMS performance evaluation as a major nonconformity, so she wrote a nonconformity report including the description of the nonconformity, the audit findings, and recommendations. Additionally, Tessa created a new plan which would enable SunDee to resolve these issues and presented it to the top management

Based on scenario 8. did the nonconformity report include all the necessary aspects?

A.

Yes, the report included all the necessary aspects

B.

No, the report must also specify the root cause of the nonconformity

C.

No, the report must also specify the audit criteria

Which layer of the SABSA-model focuses on aligning security architecture with business requirements and drivers?

A.

Contextual architecture

B.

Component architecture

C.

Logical architecture

Infralink is a medium-sized IT consultancy firm headquartered in Dublin, Ireland. It specializes in secure cloud infrastructure, software integration, and data analytics, serving a diverse client base in the healthcare, financial services, and legal sectors, including hospitals, insurance providers, and law firms. To safeguard sensitive client data and support business continuity, Infralink has implemented an information security management system (ISMS) aligned with the requirements of ISO/IEC 27001.

In developing its security architecture, the company adopted services to support centralized user identification and shared authentication mechanisms across its departments. These services also governed the creation and management of credentials within the company. Additionally, Infralink deployed solutions to protect sensitive data in transit and at rest, maintaining confidentiality and integrity across its systems.

In preparation for implementing information security controls, the company ensured the availability of necessary resources, personnel competence, and structured planning. It conducted a cost-benefit analysis, scheduled implementation phases, and prepared documentation and activity checklists for each phase. The intended outcomes were clearly defined to align security controls with business objectives.

Infralink started by implementing several controls from Annex A of ISO/IEC 27001. These included regulating physical and logical access to information and assets in accordance with business and information security requirements, managing the identity life cycle, and establishing procedures for providing, reviewing, modifying, and revoking access rights. However, controls related to the secure allocation and management of authentication information, as well as the establishment of rules or agreements for secure information transfer, have not yet been implemented. During the documentation process, the company ensured that all ISMS-related documents supported traceability by including titles, creation or update dates, author names, and unique reference numbers. Based on the scenario above, answer the following question.

Based on the controls implemented by Infralink. which category of information security controls do They fall under? Refer to scenario 3.

A.

Technological

B.

People

C.

Organizational

Which of the following is categorized under the organizational controls of ISO/IEC 27001?

A.

Annex 5.3 Segregation of duties

B.

Annex 7.6 Working in secure areas

C.

Annex 8.8 Management of technical vulnerabilities

BioLooVitalis is a biopharmaceutical firm headquartered in Singapore Renowned for its pioneering work in the fie d of human therapeutics. BioLooVitalis places a strong emphasis on addressing critical healthcare concerns particularly in the domains of cardiovascular diseases, oncology bone health, and inflammation BioLooVitalis has demonstrated its commitment to data security and integrity by maintaining an effective information security management system (ISMS) based on ISO/IEC 77001 for the past two years. After noticing an increase m failed login attempts over several weeks. bioLooVitalis IT security learn reviewed log data, correlated it with user behavior patterns, and mapped it against known attach vectors to determine potential causes. Based on their findings, they prepared a technical report detailing the nature of the anomalies and submitted it to the compliance function. The compliance team then summarized the findings and presented them to the executive management during the quarterly ISMS performance review. To proactively track system behavior following the spike n failed login attempts. BioLooVitalis's IT security team configured a dashboard showing real time login activity. system response times, and end point availability across departments. This helped the team quickly detect abnormal behavior without waiting formal reporting cycles. Following The implementation of the real time access control dashboard BioLooVitalis internal audit team assessed whether the new processes and tools effectively reduced unauthorized access attempts and met both technical and policy-based requirements. Lastly, the internal auditors collected system-generated access logs, reviewed user access reports, and conducted interviews with IT personnel. These data sources helped them verify whether the new controls were functioning as intended and aligned with internal ISMS objectives. Based on The scenario above, answer the following question.

According to Scenario 8. which reporting method was used by BioLooVitalis?

A.

Operational dashboard

B.

Strategic scorecard

C.

Gages

Scenario 4: UX Software, a company specializing in L.JXfUl design. QA and software testing. and mobile application development. recognized the need to improve its information security measures, As such. the

company implemented an ISMS based on ISO/IEC 27001- This strategic move aimed to enhance the confidentiality. availability, and integrity Of information shared internally and externally, aligning with industry

standards and best practices.

The integration of ISMS into UX Software's existing processes and ensuring that these processes are adjusted in accordance with the framework of ISMS signified an important milestone. underscoring the

organization'S commitment to information security. UX Software meticulously tailored these procedures to align with the ISMS framework, ensuring they ate contextually and culturally appropriate while avoiding

mismatches. This proactive stance reassured their employees and instilled confidence in their clients, ensuring the protection of sensitive data throughout their operations.

UX Software'S top management took action to define the Scope Of their ISMS to adhere to ISOflEC 27003 to drive this initiative forward. Sven, a key member Of the top management team at UX Software. assumed

the role of project sponsor. a critical position responsible for ensuring the execution of ISMS implementation with adequate resources. Sven's leadership was pivotal in steering the project towards compliance with

27001, thus elevating the organization's information security posture to the highest level-

In parallel with their dedication to information security. UX Software incorporated the technical specifications Of security controls within the justification section Of their Statement Of Applicability This approach

demonstrated their Commitment to meeting ISO/IEC 27001 requirements and ensured thorough documentation and justification Of Security controls, thereby Strengthening the overall Security framework Of the

organization. Additionally. UX Software established a committee responsible for ensuring the effectiveness of correctrve actions, managing the ISMS documented information, and continually improving the ISMS

while addressing nonconformities.

By implementing an ISMS based on ISO/IEC 27001, UX Software improved its information security and reinforced its position as a reliable partner. This dedication to information security serves as a testament to

UX Software's commitment to delivering high-quality software solutions while safeguarding the interests of its internal stakeholders and valued clients.

Based on scenario 4, which of the following committees did UX Software establish?

A.

Information security committee

B.

Steering committee

C.

Operational committee

Nimbus Route, a cloud-native logistics optimization company based in the Netherlands, offers Al-driven route planning fleet management tools, and real time shipment tracking solutions to clients across Europe and North America. To safeguard sensitive logistics data and ensure resilience across its cloud services. Nimbus Route has implemented an information security management system (ISMS) based on ISO/lEC 27001. The company is also integrating intelligent transport systems and predictive analytics to increase operational efficiency and sustainability. As part of the ISMS implementation process, the company is determining the competence levels required to manage its ISMS. It has considered various factors when defining these competence requirements, including technological advancements, regulatory requirements, the company's mission. strategic objectives, available resources. as well as the needs and expectations of its customers. Furthermore, the company has established clear guidelines for internal and external communication related to the ISMS, defining what information to share, when to share it. with whom, and through which channels. However, not all communications have been formally documented: instead, the company classified and managed communication based on its needs. ensuring that documentation is maintained only to the extent necessary for the ISMS's effectiveness To support its expanding digital services and ensure operational scalability. Nimbus Route utilizes virtualized computing resources provided by an external cloud service provider. This setup allows the company to configure and manage its operating systems, deploy applications. and control storage environments as needed while relying on the provider to maintain the underlying cloud environment. To further enhance is predictive capabilities. Nimbus Route is adopting machine learning techniques across several of its core services Specifically, it uses machine learning for route optimization and delivery time estimation, leveraging algorithms such as logistic regression and support vector machines to identify patterns in historical transportation data. As Nimbus Route's ISMS matures, the company has chosen a chased approach to its transition into full operational mode Rather than waiting for a formal launch, individual elements of the ISMS, such as risk treatment procedures, access controls, and audit logging, are being activated progressively as soon as they are developed and approved Based on the scenario above answer the following question.

As indicated in scenario 6. what does Nimbus Route s approach to managing its computing environment suggest about the type of cloud service model it uses?

A.

Infrastructure as a service

B.

Software as a service

C.

Platform as a service

Copyright © 2014-2026 Solution2Pass. All Rights Reserved