Pre-Summer Sale Special - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmaspas7

Easiest Solution 2 Pass Your Certification Exams

FlashArray-Implementation-Specialist Pure Storage Pure Certified FlashArray Implementation Specialist (FAIS) Exam Free Practice Exam Questions (2026 Updated)

Prepare effectively for your Pure Storage FlashArray-Implementation-Specialist Pure Certified FlashArray Implementation Specialist (FAIS) Exam certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2026, ensuring you have the most current resources to build confidence and succeed on your first attempt.

An Implementation Engineer is installing a FlashArray//XL chassis with two DirectFlash Shelves. What is the minimum rack space required for this installation?

A.

9U

B.

11U

C.

12U

Prior to running the puresetup command, which command should an Installation Engineer run on a new install of a FlashArray//XR4 array?

A.

pureboot list

B.

cobalt check . py

C.

purehw list

Which Purity command can be used to validate I/O is balanced across initiators?

A.

purehost iobalance check

B.

purehost monitor --balance

C.

purehost list --balance

When adding a data pack into a FlashArray chassis or a DFS shelf, the drives show "unrecognized" status when running puredrive list.

What is the cause of this status on the newly inserted drives?

A.

The Purity version of the FlashArray/DFS is incompatible with the new drives.

B.

The drives exceed the max space supported for the controller model.

C.

There is a hardware fault that needs to be corrected.

D.

The drives have not yet been logically admitted into the array.

Which enablement feature will cause Mirrored Write statistics to appear in the Analysis section of the FlashArray Purity 6.x GUI?

A.

FA File

B.

ActiveCluster (AC)

C.

ActiveDR

An Implementation Engineer arrives on site to complete a shelf evac. What action must take place before Pure Support can run the completion commands?

A.

Enable Remote Assist (RA).

B.

Power off the shelf.

C.

Set maintenance tag.

An Implementation Engineer is upgrading a FlashArray//X50R3 to an //X50R4. The array has 10 SAS and 10 DirectFlash modules in the chassis.

What type of controller is required to complete the upgrade?

A.

FLASHARRAY//X50 R4, SE

B.

FLASHARRAY//X50 R4, NS

C.

FLASHARRAY//X50 R4, Base

D.

FLASHARRAY//X50 R4, NVMe

An Implementation Engineer is replacing a failing component in a FlashArray//XR4 and must ensure proper service clearance at the front and rear of the array.

What is the required service depth clearance for the front and rear panels of the FlashArray//XR4?

A.

Front panel: 216 mm (8.5 in.), Rear panel: 530 mm (20.9 in.)

B.

Front panel: 530 mm (20.9 in.), Rear panel: 530 mm (20.9 in.)

C.

Front panel: 530 mm (20.9 in.), Rear panel: 216 mm (8.5 in.)

D.

Front panel: 216 mm (8.5 in.), Rear panel: 216 mm (8.5 in.)

An Implementation Engineer needs to run the puresetup replace procedure on a FlashArray//XR5 during a controller upgrade. What command should the engineer run to identify the array model?

A.

hwconfig --all

B.

pureversion -a

C.

hwconfig --model

A customer wants to expand the capacity of their FlashArray//X10 from 5/5 to 11/11. Which is the correct action to take?

A.

Evacuate and swap one pack at a time.

B.

Perform a drive-by-drive swap of the modules.

C.

Install a swing shelf with loan capacity to evacuate to.

An Implementation Engineer has completed a hardware NDU, but after the upgrade, Purity reports a "health not responding" status when running pureadm status.

Before contacting support, which command should the Implementation Engineer run to review a list of possible logged issues?

A.

puremessage list --open --hidden

B.

purearray diagnose --log

C.

purealert watcher list --live

D.

purehw diagnose --verbose

A customer has submitted a Pure Engagement Request (PER) / Implementation Workbook (IWB) and the stated array name is "123".

What is the issue with this array name?

A.

Array name cannot start with a digit.

B.

Array name must be 4 characters or more.

C.

Array name must be alphanumeric.

D.

Array name cannot contain hyphens.

An Implementation Engineer is onsite to install a new DirectFlash Shelf on a FlashArray//XL that does NOT have any installed. There is an I/O card installed and in use on the default slot for the first shelf.

Where should the Implementation Engineer install the PCIe card for connectivity?

A.

PCIe Slot 8

B.

PCIe Slot 6

C.

PCIe Slot 5

D.

PCIe Slot 2

Which ports are used by default for replication on a FlashArray//XR4?

A.

ETH 2 and ETH 3

B.

ETH 3 and ETH 4

C.

ETH 0 and ETH 1

D.

ETH 4 and ETH 5

Which power cable receptacle type does the FlashArray//X accessory kit contain?

A.

C19 to C20

B.

C14 to C15

C.

C13 to C14

A customer has scheduled the installation of a FlashArray//X70R4. Core services such as DNS, NTP, and SMTP are currently unavailable due to a network outage, but the Implementation Engineer proceeds with the installation as planned.

What should the Implementation Engineer expect during the installation?

A.

The array will automatically skip configuration of all network-dependent features and require a full reinitialization later.

B.

Purity will set itself to NOT start on bootup due to services unable to be verified during installation.

C.

Core service validation checks will fail during setup, but the installation can complete and services can be verified later once restored.

D.

The puresetup command will lock the array into maintenance mode until Pure Support authenticates the bypass.

Which command should the Implementation Engineer use to easily verify connectivity to Pure1 from a FlashArray?

A.

purearray test pinghome

B.

puresupport phonehome

C.

purearray phonehome test

After rebooting a controller, which command should an Implementation Engineer run to verify all the Purity services have started successfully?

A.

pureadm

B.

pureadm list

C.

pureadm status --all

An Implementation Engineer is installing a second DirectFlash Shelf (DFS) on a FlashArray//XR4 controller. How should the Implementation Engineer complete the installation?

A.

Install a DFS card in PCIe Slot 0 and use these ports for Shelf connectivity.

B.

Install a DFS card in PCIe slot 4 and use it to connect the second DirectFlash Shelf.

C.

Install a DFS card in PCIe slot 3 and use it to connect the second DirectFlash Shelf.

When accessing the FlashArray GUI, which management IP address is recommended for use?

A.

CT1 management IP

B.

CT0 management IP

C.

Virtual management IP

Copyright © 2014-2026 Solution2Pass. All Rights Reserved