FlashArray-Implementation-Specialist Pure Storage Pure Certified FlashArray Implementation Specialist (FAIS) Exam Free Practice Exam Questions (2025 Updated)
Prepare effectively for your Pure Storage FlashArray-Implementation-Specialist Pure Certified FlashArray Implementation Specialist (FAIS) Exam certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.
Total 75 questions
If a Technical Support Engineer (TSE) is not available to perform health checks after an installation, what action should the Implementation Engineer take?
An Implementation Engineer is onsite to add two 4-port FC cards to a FlashArray//X20R3. In what state should the controller be in before performing the card add procedure?
An Implementation Engineer needs to run the puresetup replace procedure on the FlashArray//X during a controller upgrade.
Which command should the Implementation Engineer run on the new controller to determine its model?
On a FlashArray//XR20R2/3 Fibre Channel (FC) array, what is the default type and placement of the PCIe FC card?
A customer would like to reduce SafeMode settings for retention and eradication with their current policy.
How is authorization obtained to make the requested changes?
The Customer’s Implementation Workbook specifies that the SMTP reply is “outlook.microsoft.com:587”. What correction should be made for array initialization to be successful?
Which enablement feature will cause Mirrored Write statistics to appear in the Analysis section of the FlashArray Purity 6.x GUI?
Which default speed FC SFPs are shipped in FlashArray//XCR4 FC arrays?
After runningpuredb run giveback --safecommand once CT0 has been upgraded, how long should the Implementation Engineer wait before continuing with the controller upgrade?
After an Implementation Engineer installs a new FlashArray and runs health checks, they see that Phonehome and Remote Assist are NOT working correctly.
Which outbound port needs to be open for all management ports (physical and virtual)?
Which command should an Implementation Engineer use to allow Support access to an array?
What is the redundancy of the FlashArray//XL PSUs?
In a situation where iSCSI cards need to be re-used during a controller upgrade, which is a valid transfer path?
What is the minimum AC voltage required to operate a FlashArray//X20R4 array?
What is the maximum number of SAS shelves supported for FlashArray//XL?
Which I/O card type is compatible across all FlashArray models?
In a situation where FC cards need to be re-used during a controller upgrade, which is a valid transfer path?
A customer would like to consolidate their SAS shelves and wants to evacuate multiple shelves in parallel. What is a prerequisite for this procedure?
A customer wants to expand the capacity of their FlashArray//X10 from 5/5 to 11/11. Which is the correct action to take?
An Implementation Engineer is onsite to install a new DFM data pack (DP) to CH0.BAY10-CH0.BAY19 of a FlashArray.
After adding the drives to the chassis, which command should the Implementation Engineer run to verify if the new DP is in a wide write group?
Total 75 questions