Prepare effectively for your SAP C_IBP_2305 SAP Certified Application Associate - SAP IBP for Supply Chain (2305) certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 1 / 2
Total 84 questions

You are evaluating criteria for choosing the solver to support planning for a complex supply chain. What are some of the points that should be reviewed?Note: There are 2 correct answers to this question.

A.

Push and Pull production models are used by the optimizer.

B.

Finite heuristics can achieve demand prioritization and pegging.

C.

Planning results can be generated faster by the optimizer.

D.

Prioritization of demand elements one by one is achieved by unconstrained heuristics.

Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)?Note: There are 3 correct answers to this question.

A.

Transportation lead times

B.

Maximum lot size

C.

Minimum lot size

D.

Adjusted transport receipts

E.

Aggregated constraints

Which conditions have to be fulfilled as a prerequisite to maintain a key figure disaggregation?Note: There are 2 correct answers to this question.

A.

The key figure is calculated and system editable.

B.

The key figure is stored and all editable.

C.

The key figure is stored and system editable.

D.

The key figure is calculated and all editable.

Which of the following are features of lag-based snapshots?Note: There are 2 correct answers to this question.

A.

Target key figures for these snapshots must have lag as a root attribute in its base planning level.

B.

The number of lag-based snapshots are limited to nine levels.

C.

Lag-based snapshots are created in the Configuration app for a fixed time range.

D.

Target key figures for these snapshots are exposed to the user in planning views.

You are working to realign the data due to a recent warehouse closure.What should you be aware of in regards to the realignment steps settings?Note: There are 2 correct answers to this question.

A.

The name of the realignment step should be no longer than 20 characters.

B.

You must mark the realignment step as "shared" and assign the steps to users.

C.

The number of steps in the realignment run is limited to 255.

D.

A realignment step can change master data, planning objects and key figures.

You created a key figure and want to add calculations.Which of the following rules do you consider?Note: There are 2 correct answers to this question.

A.

Aggregation calculations using SUM or MAX functions must be based on a higher aggregation level.

B.

The calculation chain for a key figure must always result in a calculated key figure.

C.

Key figures can be calculated across different planning levels.

D.

All key figure calculations have calculation inputs, which can be marked as stored or calculated.

What are the possible ways that an attribute intended for use as an attribute as a key figure can be created and assigned?

A.

Created as type NVARCHAR and assigned to an external master data type

B.

Created as type INTEGER and assigned to a compound master data type

C.

Created as type INTEGER and assigned to a simple master data type

D.

Created as type DECIMAL and assigned to a compound master data type

What do you need to be aware of when using multiple pairs of key figures in one copy operator? Note: There are 2 correct answers to this question.

A.

Copying multiple key figures can be processed sequentially.

B.

If necessary source key figures values are disaggregated.

C.

Copying multiple key figures on different planning levels is not possible.

D.

If necessary target key figures values are disaggregated.

What are some of the capabilities of the Planner Workspaces app?Note: There are 2 correct answers to this question.

A.

It supports sharing with other users or user groups.

B.

It supports favorites created in SAP IBP, add-in for Microsoft Excel

C.

It supports embedding analytic stories as a workspace component

D.

It supports simulating the effect of the changes

You are adding a value-based filter to a planning view.Which of the following conditions apply?Note: There are 3 correct answers to this question.

A.

You can only apply one value-based filter per planning view.

B.

The alerts dashboard is not available if a value-based filter is set for the open planning view.

C.

You can add (or delete) planning objects to a planning view after these filters are applied.

D.

These filters can be used together with attribute totals in the same planning view.

E.

These filters are always applied based on the values stored in the database.

Which features apply to quota violations modeled with the optimizer?

A.

Quotas can be modeled for sourcing location, production, and consensus demand.

B.

Because quota violations shouldn't be possible, the non-delivery cost rate is less than quota violation cost.

C.

Min and Max Quotas have to be the same as sourcing ratios.

D.

The optimizer will only violate quotas if quotas are maintained as time-dependent key figures.

Which of the following are functions of SAP IBP for demand?Note: There are 2 correct answers to this question.

A.

Demand sensing of demand data using predictive analytics tools

B.

Embedded, on-the-fly demand analytics

C.

Detailed statistical analysis of demand data using predictive analytics tools

D.

Consideration of demand-driven analysis for buffer positioning.

Analytics charts are created by the user in the Advanced Analytics application.What can the user do in the Advanced Analytics app?Note: There are 2 correct answers to this question.

A.

Group data.

B.

Open graphics in Excel.

C.

Apply filters on your data.

D.

Merge charts together.

What are the relevant use cases for helper key figures?Note: There are 2 correct answers to this questions.

A.

Used at any level of calculation level except the Request Level

B.

Used when you have more than three inputs at different planning levels in one calculation

C.

Used by end-users in planning views to help visualize cross-period calculations

D.

Used to break down a large calculation into manageable subcalculations

Forecast Error CV is an input to which of the following?

A.

Time-Series-Based Supply Planning Optimizer

B.

Calculate Target Inventory Components in Inventory Planning Profile Operator

C.

Forecast Error Calculation in Inventory Planning Profile Operator

D.

Multistage Inventory Optimization in Inventory Planning Profile Operator

You are working on a mid-range plan that spans the seasonal peak and you are evaluating the need for additional crewing.Which of the following parameters can you model to plan production with extra shift(s)?

A.

Capacity expansion with additional costs

B.

Adjusted production interactive values

C.

Incremental production values

D.

Production source validity at the start of seasonal peak

A time profile is defined with these levels: day, technical week, week, month, quarter, and year. What condition in configuration will allow you to have a different value in the current week, versus all other time buckets?

A.

IF("PERIODID4" ="$$PERIODID4CU$$...)

B.

IF("PERIODID2" ="$$PERIODID2CU$$...)

C.

IF("PERIODID3" ="$$PERIODID3CU$$...)

D.

IF("PERIODID5" ="$$PERIODID5CU$$...)

What actions can be performed in the Advanced Dashboards application?Note: There are 3 correct answers to this question.

A.

Link two analytics charts.

B.

Rename the charts.

C.

Add process templates.

D.

Display all assigned analytics on a single UI.

E.

Use drill-down functionality.

You are starting a new implementation project for SAP IBP and are considering the possible system architecture.What are the possible approaches for setting up the system landscape?Note: There are 2 correct answers to this question.

A.

Create additional planning areas in the test system to support training needs.

B.

Set up a three-tier landscape using transport, starting from the development system to test and production.

C.

Set up a two-tier landscape, and have the configuration of the development system regularly updated from the production system.

D.

Create additional test planning areas in the production system to support cutover needs.

Which functional capabilities are included in SAP IBP for response and supply?Note: There are 2 correct answers to this question.

A.

Gating Factors

B.

Planning with Product Allocations

C.

Analyze Supply Usage

D.

Detailed Production Scheduling