Weekend Sale - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmaspas7

Easiest Solution 2 Pass Your Certification Exams

C_S43_2022 SAP Certified Application Associate - SAP S/4HANA Asset Management Free Practice Exam Questions (2025 Updated)

Prepare effectively for your SAP C_S43_2022 SAP Certified Application Associate - SAP S/4HANA Asset Management certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 2 / 2
Total 80 questions

How is Phase-based Maintenance Processing activated in the SAP system? Note: There are 2 correct answers to this question

A.

Through Best Practices scope items 4HH and 4HI.

B.

Phase-based maintenance is always active in all S/4HANA 2021 editions and above

C.

By installing the corresponding enhancement pack and activating the related business function

D.

By manually activating the corresponding Business Feature in case Best Practices are not used.

You settle a refurbishment order with the batches (valuation types) having price control standard price. What is the effect? Note. There are 2 correct answers to this question.

A.

The effective costs are posted as a credit memo to a price difference account

B.

The effective costs are posted to the respective batch (valuation type).

C.

The goods receipt for the batch refurbished is posted with the value of the standard price.

D.

The goods receipt for the batch refurbished is posted with the value of the moving average price

What are valid item categories for a BOM used in Asset Management? Note: There are 3 correct answers to this question.

A.

D (Document item)

B.

I (PM Structure element)

C.

F (Functional location)

D.

L (Stock item)

E.

E (Equipment)

What can be determined using the offset within a maintenance strategy? Note: There are 2 correct answers to this question.

A.

The first due date of a maintenance package

B.

A one-time shift of a maintenance package

C.

A preliminary buffer shifting the reference date of the maintenance order

D.

The call date for the maintenance order

Page: 2 / 2
Total 80 questions
Copyright © 2014-2025 Solution2Pass. All Rights Reserved