Prepare effectively for your SAP C_S43_2022 SAP Certified Application Associate - SAP S/4HANA Asset Management certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 1 / 2
Total 80 questions

Which functions characterize a Strategic analysis as opposed to embedded analysis within the SAP S/4HANA core system? Note: There are 2 correct answers to this question

A.

Preconfigured Core Data Service (CDS) containing SQL views

B.

A collection of tools that are not included with core SAP S/4HANA

C.

SAP Business Objects as a part of SAP Business Warehouse (BW)

D.

SAP Business Objects Business Intelligence for Visualization

You want to set up a scenario for regular maintenance. The first event should take place after 1 year, after that, it is a regular cycle of 6 months. Which parameter do you have to use to map this in the system?

A.

Package hierarchy

B.

Scheduling indicator

C.

Maintenance package offset

D.

Cycle modification factor

You want to set up a general maintenance task list for inspection rounds using the overall time confirmation as a simplified way to record measurement documents. What do you need to do? Note: There are 2 correct answers to this question

A.

Assign a measuring point as a production resources/tools (PRT) to a task list operation.

B.

Assign a piece of equipment with an allocated measuring point to a task list operation

C.

Assign an inspection lot to the task list header

D.

Assign an inspection document as a PRT to the task list operation.

What happens if you change the primary key of a functional location?

A.

The user must define a new labelling system for the new primary key.

B.

The functional location cannot be assigned to a new superior functional location when the new label is entered.

C.

Changing the superior functional location via alternative labeling is not possible.

D.

The user must decide whether the functional location is assigned to a new superior functional location.

You want to create a new functional location. Which selling is part of the Customizing for the functional location category? Note: There are 3 correct answers to this question

A.

Warranty category

B.

Usage period

C.

Object information

D.

Measuring point category

E.

Status profile

During the implementation project you need to define the organizational units relevant for Plant Maintenance. Which of the following objects can you directly assign to a maintenance plant? Note: There are 2 correct answers to this question

A.

Maintenance work center

B.

Maintenance planner group

C.

Organizational unit

D.

Storage location

Which operations can the responsible person perform after a maintenance order is technically completed? Note: There are 2 correct answers to this question

A.

Lock or unlock the order

B.

Update the estimated costs

C.

Change the settlement rule

D.

Change the planned costs

What are characteristics of the structure indicator? Note: There are 2 correct answers to this question

A.

It limits the types of characters in the edit mask to Alpha and Numeric.

B.

It restricts the number of hierarchical levels to no more than 6

C.

It defines the allowed characters for a functional location

D.

It sets the hierarchy levels of the functional location structure.

The planner adds non-stock material in a released maintenance order. What are possible options within the maintenance order? Note: There are 3 correct answers to this question?

A.

A purchase requisition can be created automatically as soon as the order is saved.

B.

The maintenance order can be set to TECO before the invoice is created

C.

A goods receipt can be posted after the maintenance order is technically completed.

D.

A purchase order is created automatically as soon as the order is saved.

E.

A purchase requisition will ALWAYS be created as soon as the order is saved.

Which operations are possible when you cancel the technical completion of a maintenance order? Note: There are 2 correct answers to this question

A.

Cancel status Released.

B.

Change the pronty

C.

Book a goods receipt.

D.

Change the estimated costs.

How does a performance-based maintenance plan calculate the interval between start date and planned date?

A.

Cycle length divided by (monthly performance x 12)

B.

Cycle length divided by annual performance

C.

Cycle length divided by ((scheduling period) x (cycle modification factor))

D.

Cycle length divided by (annual performance/365)

You want to have several plan dates calculated in a maintenance plan.Which scheduling parameter do you use?

A.

Scheduling indicator

B.

Scheduling period

C.

End Date for Scheduling

D.

Call horizon

Which SAP UI technology is used for the Report and Repair Malfunction app?

A.

Web Dynpro

B.

SAP GUI for HTML

C.

SAPUI5

D.

Business Server Pages

The planner adds stock materials in the maintenance order. What are possible options for handling of reservations within a maintenance order? Note: There are 2 correct answers to this question

A.

Open reservations can be cleared when a maintenance order operation is finally confirmed.

B.

Reservations are created only after a material availability check has been performed

C.

For the combination of order type and planner group, you can decide when reservations are created

D.

All open reservations are closed when the maintenance order is set to TECO.

You want to implement SAPUI5 apps in your SAP Fiori Launchpad. Which are mandatory elements? Note. There are 2 correct answers to this question?

A.

Web Dynpro Apps

B.

Transactions

C.

Catalogs

D.

Tile Groups

Which parameter in a maintenance strategy do you use to set the start/end date of the maintenance order?

A.

Package offset

B.

Scheduling type

C.

Initial/subsequent buffer

D.

Call horizon

Which of these are necessary steps of the Inspection Checklist process? Note: There are 2 correct answers to this question

A.

Generate Inspection Lols within the checklists view.

B.

Link PM task list with assigned inspection point type to a maintenance item.

C.

Record the usage decision for an Inspection Lot

D.

Generate Inspection Lots assigned to maintenance order headers.

You want to schedule a performance-based maintenance plan. Which parameters are mandatory? Note: There are 2 correct answers to this question

A.

Scheduling period

B.

Start counter reading

C.

Estimated annual performance

D.

Counter overflow reading

How do you set up the visible tiles for a specific user in SAP Fiori Launchpad? Note: There are 2 correct answers to this question

A.

By assigning a PFCG role with an SAP Fiori catalog

B.

By assigning a portal role with an SAP Fiori catalog

C.

By assigning a PFCG role with an SAP Fiori tile group

D.

By assigning the tiles directly

Which objects have been enhanced with linear data in maintenance processes? Note: There are 3 correct answers to this question

A.

Maintenance plan header

B.

Work order confirmation

C.

Maintenance plan item

D.

Equipment task list

E.

Notification item