C_S43_2023 SAP Certified Associate - SAP S/4HANA Cloud Private Edition Asset Management Free Practice Exam Questions (2025 Updated)

Prepare effectively for your SAP C_S43_2023 SAP Certified Associate - SAP S/4HANA Cloud Private Edition Asset Management certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 2 / 2
Total 80 questions

What is characteristic for a maintenance order with status REL- if you also consider the capabilities of business functions? Note: There are 3 correct answers to this question.

A.

Goods receipts for external services can be entered.

B.

The planner can change planned costs at the operation level

C.

The planner can change estimated costs only at the header level

D.

The controller can determine actual cost surcharges.

E.

The assignment of the notification to the maintenance order header cannot be deleted.

Which parameter in a maintenance strategy do you use to set the start/end date of the maintenance order?

A.

Package offset

B.

Scheduling type

C.

Initial/subsequent buffer

D.

Call horizon

What do you have to consider when planning maintenance work that is to be carried out by an external company?

A.

If you assign a control key for an external order operation, the actual values must always be entered as a goods receipt in the system.

B.

In the control key assigned to the order operation, the "Service" indicator must always be activated.

C.

If you assign a control key with indicator "Service" for an external service, you have to enter the actual values via the service entry sheet.

D.

For the maintenance order type, you have to assign the Enhanced Procurement Mode.

Which of these are necessary steps of the Inspection Checklist process? Note: There are 2 correct answers to this question

A.

Generate Inspection Lols within the checklists view.

B.

Link PM task list with assigned inspection point type to a maintenance item.

C.

Record the usage decision for an Inspection Lot

D.

Generate Inspection Lots assigned to maintenance order headers.