Summer Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: s2p65

Easiest Solution 2 Pass Your Certification Exams

C_TS413_2021 SAP Certified Application Associate - SAP S/4HANA Asset Management Free Practice Exam Questions (2025 Updated)

Prepare effectively for your SAP C_TS413_2021 SAP Certified Application Associate - SAP S/4HANA Asset Management certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 1 / 2
Total 87 questions

You want to display vehicle-specific data for a piece of equipment. How do you proceed?

A.

Assign a view profile to an equipment category for fleet equipment.

B.

Assign a view profile to the combination of fleet object type and equipment category.

C.

Define the field selection for the vehicle equipment master data.

D.

Assign a view profile to the combination of fleet object type and usage type.

Which of the following can you assign to an equipment category via a view profile? Note: There are 2 correct answers to this question.

A.

Configuration

B.

Manufacturer data

C.

Serial data

D.

Warranty

Which parameter in a maintenance strategy do you use to set thestart/end date of the maintenance order?

A.

Initial/subsequent buffer

B.

Package offset

C.

Call horizon

D.

Package hierarchy

Which statement is correct when planning maintenance work thatis to be carried out by an external company?

A.

In the control key assigned to the order operation, the "Service" indicator must always be activated.

B.

A service master record must always be assigned to the external order operation.

C.

If you assign a control key with indicator "Service" for an external service, you have to enter the actual values via the service entry sheet.

D.

If you assign a control key for an external order operation, theactual values must always be entered as a goods receipt in the system.

Which parameter in the material master is a prerequisite for refurbishment?

A.

Valuation class 8000

B.

Valuation category C (condition-based)

C.

Valuation type H (origin)

D.

Valuation category B (in-house/external procurement)

Which steps are available for the maintenance technician when using the Report Malfunction tile? Note: There are 3 correct answersto this question.

A.

Select and print the maintenance order shop papers.

B.

Display the current location of the technical object.

C.

Add a URL to provide further information.

D.

View details of the technical object by navigating to the Asset Viewer.

E.

Input estimated costs for repair malfunction.

Which of the following statements about SAP Asset Manager aretrue? Note: There are 3 correct answers to this question.

A.

SAP Asset Manager can run on smart watches.

B.

SAP Asset Manager is available for Windows platform.

C.

SAP Asset Manager can be used offline.

D.

SAP Asset Manager can be used offline.

E.

SAP Asset Manager is available for SAP S/4HANA and SAPERP.

In which of the following locations can object information can be found

A.

Din master record of technical object

B.

In document

C.

In Notification

D.

In Order

The first release of SAP asset manager mobile application is based on

A.

ios and android

B.

Android only

C.

Windows only

D.

ios only

E.

IOS,Android, Windows

Which of the following statements are correct for SAP S/4HANACIoud - Asset Management? Note: There are 2 correct answers to this question.

A.

You do NOT have access to the SAP S/4HANA back end system.

B.

You have access to the SAP S/4HANA back end system.

C.

You can configure SAP S/4HANA Cloud via the SAP Asset Intelligence Network.

D.

You can configure SAP S/4HANA Cloud via the self-service configuration UI.

You want to assign a maintenance planning plant directly to an organizational unit. Which of the following units can you use?

A.

Maintenance work center

B.

Maintenance planner groups

C.

Location

D.

Controlling area

In which cases are projects (PS) used in the area of SAP S/4HANAAsset Management? Note: There are 2 correct answers to this question.

A.

Condition-based maintenance

B.

Investments

C.

Shutdowns and overhaul

D.

External refurbishment

You want to create a new functional location. Which configurationsteps are required? Note: There are 2 correct answers to this question.

A.

Define the functional location category.

B.

Define the number range for the functional location category.

C.

Define the reference functional location.

D.

Define the structure indicator.

You want to display additional document information within the document flow of a maintenance order. For which type of documentmust this be customized?

A.

Invoice

B.

Service entry sheet

C.

Purchase order

D.

Goods movement

You want to schedule a performance-based maintenance plan. Which parameters are mandatory? Note: There are 2 correct answers to this question.

A.

Shift factors

B.

Start counter reading

C.

Estimated annual performance

D.

Scheduling period

Where can the maintenance planner perform a material availability check? Note: There are 2 correct answers to this question.

A.

Via the Manage Maintenance Order List SAP Fiori app

B.

Via the Change Maintenance Order SAP Fiori app

C.

Within the SAP Fiori-based background job

D.

Via the multi-level order list (SAP GUI)

You are analyzing the data transfer of the cost center of an equipment. What are the possible data origins? Note: There are 2correct answers to this question.

A.

The reference functional location of the superior functional location

B.

The individual maintenance of the cost center in the equipment master record

C.

The cost center of the related maintenance work center

D.

The cost center of the superior equipment

You want to assign components to an equipment task list. There isno BOM assigned to the equipment. What is the prerequisite for using the free assignment of material?

A.

Free assignment of material is always possible without any prerequisites.

B.

Assign the header material of a material BOM to the equipmenttask list header.

C.

Assign the header material of a material BOM as assembly to atask list operation.

D.

Assign the BOM usage for free assignment of material in Customizing.

Which of the following are components of cloud-based SAP Intelligent Asset Management? Note: There are 2 correct answers tothis question.

A.

SAP Work Manager

B.

Worker safety applications

C.

SAP Asset Manager

D.

SAP Predictive Maintenance and Service

Which of the following statements about orders with operation account assignment (OAA) are correct? Note: There are 3 correct answers to this question.

A.

The settlement rule is maintained on header level.

B.

Purchase requisitions have the operation as account assignment.

C.

A technical object must be assigned to an order operation.

D.

Costs are only stored for the operation object.

E.

Overall costs are dynamically summed up on header level.

Page: 1 / 2
Total 87 questions
Copyright © 2014-2025 Solution2Pass. All Rights Reserved