Prepare effectively for your SAP C_TS422_2022 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 1 / 2
Total 80 questions

How would you define pegging in the context of Advanced Planning?

A.

An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements

B.

An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements

C.

An evaluation to verify if there are material or capacity shortages in the ^ network after the production planning run

D.

An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run

in your Plant, MRP is activated.

which options do you have to exclude a material from the MRP run?

Note: there are 2 correct answers to this question.

A.

Use a specific material status

B.

Use a specific material group

C.

Use a specific MRP type

D.

Use a specific MRP list

Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA?

Note: There are 2 correct answers to this question.

A.

Order (pool) chart

B.

Capacity requirements chart

C.

Work center capacities chart

D.

Orders (dispatched) chart

You use planning strategy Finite Scheduling with Reverse and want to allow scheduling the past. How can you parameterize this in the strategy profile?

A.

Specify a negative planning horizon.

B.

Specify a positive planning horizon.

C.

Specify a positive offset time.

D.

Specify a negative offset time.

Mode selection is one of the scheduling options available with Advanced Planning in SAP S/4HANA. When can you use mode selection?

A.

When multiple production versions are maintained for one product

B.

When multiple operations are maintained for one product

C.

When alternative resources are used within one operation

D.

When multiple planned orders exist on one resource

You want to reduce planning efforts for B and C materials. Which planning procedure do you recommend?

A.

Manual Planning Without Check

B.

Consumption-Based Planning

C.

Material Requirements Planning

D.

Advanced Planning

What are some benefits of planning with planned independent requirements? Note: There are 2 correct answers to this question.

A.

Reduced production times

B.

Reduced delivery times

C.

Option to use make-to-order production

D.

Option to forecast planning for production resources

Your production planners must execute planning only for specific resources. How can you achieve this in Advanced Planning (PP/DS)?

A.

Use a propagation range.

B.

Use a resource group

C.

Use a planning area.

D.

Use a planning group.

You Have a scheduling agreement with a vendor, you want classic MRP to automatically create

schedule lines in case of material shortage, what must you do?

Note: there are 2 correct answers to this question.

A.

Add the agreement to the source list and mark it for MRP relevance.

B.

Set the creation indicator for purchase requisition on the initial screen of the MRP run.

C.

Add the agreement to the quota arrangement and mark it for MRP relevance.

D.

Set the creation indicator for delivery schedule lines on the initial screen the MRP run.

Where do you maintain data to determine the duration of an operation for production? Note: There are 2 correct answers to this question.

A.

Routing

B.

Work Center

C.

Bill of material (BOM)

D.

Material Master

which actions does the system perform by default when you save a confirmation for a finished

product in repetitive manufacturing?

Note: There are 3 Correct answers to this question.

A.

Posting of production costs to the production cost collector

B.

posting of goods receipt for the product

C.

Reduction of associated capacity requirements

D.

Archiving of document for assembly scrap

E.

Material staging for next order in sequence

How can you set up the supply source for the Kanban process in SAP S/4HANA?

Note: There are 3 correct answers to this question.

A.

Use stock transfer reservations for stock transfer.

B.

Use purchase orders for external procurement.

C.

Use quotations for internal and external procurement

D.

Use run schedule quantities for in-house production.

E.

Use purchasing costs for automated source prioritization.

In the Capacity Scheduling Table, which settings can you select for the planning strategy?

Note: There are 3 correct answers to this question.

A.

Finiteness level

B.

Fixed pegging

C.

Scheduling control

D.

Planning mode

E.

Direction

What does forecasting in the demand planning cycle include?

Note: There are 3 correct answers to this question

A.

One-off events

B.

Past quotation quantities

C.

Past sales order quantities

D.

Market intelligence

E.

Past production planning quantities

What does a line hierarchy in repetitive manufacturing represent?

A.

A production line with more than one work center

B.

A production line with prioritized work centers

C.

A production line with a parallel sequence in the routing

D.

A production line with an alternative sequence in the routing

What do you need to consider when working with material master numbering in SAP S/4HANA?

Note: There are 2 correct answers to this question.

A.

Material numbering is defined cross-client.

B.

Material numbering is defined at client level.

C.

The maximum material number length is 18 for external numbers and 18 for internalnumbers.

D.

The maximum material number length is 40 for external numbers and 18 for internal numbers

Which standard item categories can you select inside a bill of material (BOM)?

Note: There are 2 correct answers to this question

A.

Work item

B.

Variable-size item

C.

Non-stock item

D.

WBS item

Under what circumstances can you change the material type for a material if stocks, reservations, or purchasing documents exist? Note: There are 2 correct answers to this question.

A.

The same batch management level is used

B.

The same base unit of measure is used.

C.

The quantity and value updates are the same

D.

The same account category is used

You want to schedule an operation finitely, without removing other operations. Which scheduling strategy do you select?

A.

Insert operation

B.

Squeeze in

C.

Schedule in working time only

D.

Find Slot

Generic Parent » Generic 1 pt

What is the purpose of collective orders?

A.

To manage production orders for an entire finished product on multiple levels

B.

To combine order management of co-products and by-products with the main product

C.

To post production costs on a cost collector instead of the production order

D.

To post any component withdrawal as single backflush with order confirmation