Prepare effectively for your SAP C_TS422_2023 SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 1 / 2
Total 80 questions

Where does the system check master data selection settings during the creation of planned orders or production orders? Note: There are 3 correct answers to this question.

A.

In the production version

B.

In the work centers

C.

In the bill of material (BOM)

D.

In the MRP controller

E.

In the routing

Your company produces a finished good based on a forecast and expects it to be in stock when customers order it. If customers order more than the forecasted quantity, this must NOT have any impact on the production program. Which planning strategy do you use?

A.

Assembly processing with production orders (82)

B.

Planning with final assembly (40)

C.

Planning without final assembly (50)

D.

Make-to-stock production (10)

How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question.

A.

By material type

B.

By plant

C.

By period

D.

By material status

What does the material type influence? Note: There are 2 correct answers to this question.

A.

Which document types and class categories are allowed

B.

Which plant-specific and plant-independent statuses are allowed

C.

Which material master screens appear and in which sequence

D.

Whether the material is produced in-house, procured externally, or both

How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.

A.

Execute an infinite production planning run for the critical resources.

B.

Reduce the planning time interval.

C.

Determine a time period with available capacity on the planning board.

D.

Increase the capacity supply in a time-phased interval.

E.

Form optimum sequences to reduce setup times.

Which options do you have to plan both quantities and capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question.

A.

Assign planned orders manually in the planning table.

B.

Run MRP with quota arrangement.

C.

Run MRP with automatic selection of production version.

D.

Run PP/DS heuristics for repetitive manufacturing.

How would you define pegging in the context of Advanced Planning?

A.

An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements

B.

An evaluation to identify overstock situations in the balance between the receipt and the issue elements after the production planning run

C.

An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements and stock

D.

An evaluation to identify material or capacity shortages in the bill-of-material structure after the production planning run

Which of the following processes lead to an entry in the MRP planning file? Note: There are 2 correct answers to this question.

A.

Changing the delivery address in transportation management

B.

Changing the storage bin in warehouse management

C.

Changing the procurement type in the product master

D.

Changing the stock in inventory management

Why do you use Engineering Change Management? Note: There are 2 correct answers to this question.

A.

To monitor document table changes

B.

To enable integration into a sales order

C.

To save multiple changes for an object

D.

To monitor document object changes

Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA Cloud Private Edition? Note: There are 2 correct answers to this question.

A.

Order (pool) chart

B.

Capacity requirements chart

C.

Orders (dispatched) chart

D.

Work center capacities chart

You want to insert an operation at a certain time on a work center in the graphical planning table. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place?

A.

The previously dispatched operation stays as is; the new operation is inserted before the dispatched operation.

B.

The previously dispatched operation stays as is; the new operation is inserted after the dispatched operation.

C.

The new operation is inserted at the desired time; the previously dispatched operation is moved forward.

D.

The new operation is inserted at the desired time; the previously dispatched operation is moved backward.

What will happen in the MRP run if you have created a new MRP-relevant material that supports both in-house production and external procurement?

A.

The MRP run assumes external procurement.

B.

The MRP run assumes in-house production.

C.

The MRP run plans the material only if a quotation has been maintained.

D.

The MRP run does NOT consider the material; it has to be planned interactively.

Mode selection is one of the scheduling options available with Advanced Planning in SAP S/4HANA Cloud Private Edition. When can you use mode selection?

A.

When several operations are maintained for one product

B.

When alternative resources are used within one operation

C.

When several production versions are maintained for one product

D.

When multiple planned orders are scheduled in parallel on one resource

Which of the following automation options can you use for production orders? Note: There are 2 correct answers to this question.

A.

You can use trigger points to automatically create rework orders via confirmations.

B.

You can use mass processing to set production orders to technically complete.

C.

You can use the production scheduling profile to automatically set orders to technically complete.

D.

You can use mass processing to read PP master data for production orders.

Your production planners are allowed to execute planning only for specific resources. How can you achieve this in Advanced Planning (PP/DS)?

A.

Use a resource group.

B.

Use a planning group.

C.

Use a propagation range.

D.

Use a planning area.

Where do you maintain the work center that represents the production line for repetitive manufacturing? Note: There are 2 correct answers to this question.

A.

Production cost collector

B.

Production version

C.

Repetitive manufacturing profile

D.

Routing

You want to set up a make-to-order planning scenario for a finished product. The bill of material contains two components: one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements. Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?

A.

Choose planning strategy 50 (Planning without final assembly) and select the corresponding Individual/Collective indicator.

B.

Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP indicator.

C.

Choose planning strategy 50 (Planning without final assembly) and select the corresponding Mixed MRP indicator.

D.

Choose planning strategy 20 (Make-to-Order) and select the corresponding Individual/Collective indicator.

Why would you use phantom assemblies? Note: There are 3 correct answers to this question.

A.

To simplify the structure of bills of material

B.

To reduce the number of changes required in bills of material

C.

To reduce the number of material masters

D.

To make the assignment of components easier

E.

To increase the number of planning levels

What data can you maintain in the sub-items of a bill of material (BOM)? Note: There are 2 correct answers to this question.

A.

Quantity

B.

Status

C.

Installation point

D.

Scrap percentage

Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers to this question.

A.

Production orders

B.

Planned orders (firmed)

C.

Planned orders (unfirmed)

D.

ATP quantities