Prepare effectively for your SAP C_TS452_2022 SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 2 / 2
Total 80 questions

What are some characteristics of the material Ledger? Note: There are 3 correct answers to this question.

A.

It is mandatory in SAP S/4HANA.

B.

It must be activated per controlling area.

C.

It is used to valuate materials in different currencies.

D.

It is used to calculate the standard price.

E.

It is used to calculate different prices for material valuation.

What are some advantages of a stock transport order compared to a stock transfer posting between two plants? Note: There are 3 correct answers to this question.

A.

You can post goods receipt in consignment.

B.

You can issue from inspection stock.

C.

You can post goods receipt to consumption.

D.

You can create stock transport requisitions via MRP.

E.

You can plan delivery costs.

Which of the following are features of a scheduling agreement? Note: There are 3 correct answers to this question.

A.

A scheduling agreement can be used for a consignment process.

B.

A scheduling agreement item is always plant-specific

C.

A material master record is optional in a scheduling agreement item.

D.

Scheduling agreement delivery schedule lines can only be created manually.

E.

Item category M (Material unknown) can be used in a scheduling agreement.

Your MRP run detects a shortage of 2000 pieces for a material with an active quota arrangement. Each of your two suppliers can only supply 1000 pieces at once.

What must you maintain to have MRP generate a procurement proposal for 1000 pieces for each supplier?

Note: There are 2 correct answers to this question.

A.

Set a maximum lot size in the quota arrangement item and activate the lx checkbox

B.

Set a maximum quota quantity in the quota arrangement item for each supplier

C.

Assign a rounding profile in the material master record of the planned material

D.

Assign the indicator for quota splitting to the lot-sizing procedure being used