CSQA Software Certifications CSQA Certified Software Quality Analyst Free Practice Exam Questions (2025 Updated)
Prepare effectively for your Software Certifications CSQA CSQA Certified Software Quality Analyst certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.
Which of the following is the correct definition of productivity?
The theory of levels of maturity is that organizations can skip a level if business needs require them to be at a higher maturity level.
In the context of the PDCA cycle, Work Processes represent the _____ component and the Check Processes represent the ___________component.
As per Crosby, to reduce Total Product Cost, the best approach is to:
Which of the following is NOT a major concerns during the operation and maintenance of a purchased application or software?
____________ Listening is when the listener is performing an analysis of what the speaker said.
Which type of control method does not cause interpersonal problems?
Controls are placed near the end of a process or workbench because this is the most appropriate location.
The Pareto analysis statistical quality tool is more commonly known as:
Which of the following would be considered a standard unit of measurement?
Which tool is used by teams to help create order out of chaos, by categorizing large numbers of ideas?
Measurement is an algorithm, connecting the desired result with the contributors or causes, that will enable that result to be achieved. These contributors are:
The effort required for testing a program to insure it performs its intended function is called:
Which of the following is associated with "Big-Q" quality as proposed by Dr. Juran?
The unit testing performed by a programmer is an example of:
One of the primary objectives of process control is to:
Which of the following is not a planning activity?
The methods that an organization uses for hiring, training, supervising, and evaluating personnel are what types of controls:
What type of software testing is most closely associated with testing after a change has been made to the software or operational software has been changed to maintain the software?
Within an ISO process assessment, a capability level is said to be established 'only' and 'only if' all the process attributes are 'fully achieved'.
__________ is a software metric, developed by Thomas J. McCabe, used to indicate the complexity of a program.
If your customer complains that you made an error, you need to do the following:
A common term that is used today for contracting for software development is "performance based contracting." Performance based contracting means:
At what process maturity level in the SEI process maturity model would you expect that the most effort would be devoted to quality control?
SEI's CMMi maturity level 5 focuses on:
Which of the following tool(s) can be applied to determine the change in process scope?
Which of the following is not included in 'Failure Cost' under 'Cost of Quality'?
Which of the following artifacts should be subjected to Quality Control?
What is the correct definition for the term "testable requirements"?
If you had seven programs and the size in function points were 80, 20, 20, 60, 40, 50, and 150. What is the median size of those seven programs in function points?