Prepare effectively for your USGBC LEED-AP-BD+C LEED AP Building Design + Construction (LEED v5 AP BD+C) certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2026, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 5 / 7
Total 454 questions

Which of the following strategies is allowed under Energy Atmosphere Credit, Renewable Energy Production, and will help a project achieve Energy Atmosphere Credit, Optimize Energy Performance?

A.

Install an on-site photovoltaic array

B.

Purchase Green-e certified carbon offsets

C.

Purchase Green-e certified Renewable Energy Certificates (RECs)

D.

Install a ground-source heat pump

The architect increased the head height of fixed windows from 8 ft. (2 m) to 10 ft. (3 m). The windows have exterior solar control and are located in regularly occupied areas of the building. Which Indoor Environmental Quality Credit (EQ) will be impacted?

A.

Occupant Experience

B.

Resilient Spaces

C.

Accessibility and Inclusion

D.

Enhanced Air Quality

Building Product Disclosure and Optimization is based on market

A.

reliability

B.

durability

C.

transparency

D.

consumption

A hospital certified underLEED V5in 2018 is designing and constructing a 21,000 ft² (1,950.96 m²) vertical addition, plus vegetated terraces and a mechanical penthouse.

The original hospital achieved the Gold certification level and was built with the capacity to add three floors—levels six through eight—to the top of the structure. This addition requires partial demolition of the roof and the floor below.

The project is designed to be architecturally cohesive with the existing building façade and is targeting Platinum certification under LEED v5.

The campus is in a dense urban area adjacent to several bus stops, a light-rail transit station within a 2,500 ft. (762 m) walking distance, and a bicycle docking point at the main entrance to the property. An on-campus shuttle service connects patients, visitors, and staff from the parking areas to each medical building and the light-rail station.

The healthcare campus has existing infrastructure; therefore, no new roads, sidewalks, parking structures, or ground-level landscaping will be installed.

The new floors have separate mechanical systems in the penthouse, but piping for public and patient restrooms, janitor closets, and staff break rooms connects directly to the main hospital plumbing system.

The newly installed medical equipment uses gas, steam, and chilled water supplied by the campus central plant.

The project team is designing the maternity ward to increase patient interaction with the vegetated terraces and green roof to promote healing and reduce recovery time. Which of the following credits or prerequisites can be achieved through this design approach?

A.

EQc2: Occupant Experience

B.

SSc1: Biodiverse Habitat

C.

IPp2: Human Impact Assessment

To assess the feasibility of earning Location and Transportation Credit, Reduced Parking Footprint, the project team should be familiar with what local government regulation?

A.

Design guidelines for orientation of parking garages along street frontages

B.

Minimum dimensions for on-street parking spaces required by the zoning code

C.

Building code standards for structured parking garages

D.

Minimum number of parking spaces required by the zoning code

In order to comply with Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, Option 2, Additional Enhanced Air Quality Strategies:

A.

All entrances to the building must have entryway systems10 ft. (3 m) longin the direction of travel

B.

All particle filters in the ventilation system must meetComité Européen de Normalisation (CEN) standard Class F7 or better

C.

CO₂ monitors must be fitted in all densely occupied spaces and configured to provide an alert

D.

All outdoor air supply systems must have an airflow measurement device that measures at least90% of the airflow

What is the maximum walking distance allowed between short-term bicycle storage and a main entrance according to LTc4: Transportation Demand Management?

A.

600 ft. (182.88 m)

B.

800 ft. (243.84 m)

C.

400 ft. (121.92 m)

Radiant-floor heating is proposed in a sensory zone to improve thermal variability in a new school. Which option in EQc3: Occupant Experience Performance will this design decision contribute to?

A.

Adaptable environment

B.

Solar glare

C.

Outdoor connections

D.

Resilient spaces

A LEED AP is evaluating whether Indoor Environmental Quality Credit, Acoustic Performance is feasible for a LEED

AP Building Design and Construction: Healthcare project. Which of the following groups of documents would best inform this decision?

A.

Airport flyover maps, mechanical plans, wall sections

B.

Patient records, wall sections, ceiling panel cut sheets

C.

Occupancy statistics, patient records, MRI machine specifications

D.

MRI machine specifications, mechanical plans, occupancy statistics

What document allows a LEED AP to register a project and sign the Certification Agreement?

A.

Owner Confirmation of Agent Authority

B.

Architect Code of Professional Conduct

C.

Commissioning (Cx) Agent Construction Permit

D.

LEED AP Standard Form of Agreement Between Owner and Architect

The project landscape architect suggests reducing the area planned for surface parking and replacing it with additional vegetated space. What benefit would this strategy provide to the owner?

A.

Increases the overall solar reflectance (SR) of the hardscape area

B.

Increases the rainwater infiltration capacity

C.

Decreases the amount of bicycle parking that must be provided

What is the best strategy for a LEED AP to suggest in order to quantify the impact of increasing the window-to-wall ratio on a Building Design and Construction project?

A.

Compare the current project to other similar projects

B.

Monitor the HVAC loads throughout the life of the project

C.

Perform a simple box energy model before the completion of the schematic phase

D.

Review Green Business Certification Inc. (GBCI) ' s comments on the energy model submission

Which strategy should be employed to improve daylighting when designing a new building?

A.

Increase the building depth

B.

Increase the number of skylights

C.

Increase the height of interior partitions

D.

Decrease the number of exterior light shelves

Which of the following products are eligible for a WaterSense label?

A.

Tankless toilets

B.

Waterless urinals

C.

Public lavatory faucets

D.

Private lavatory faucets

The project team wants to modify the design of an office building copy room to minimize the risk of airborne contamination to the surrounding space. The design includes a separate exhaust, but due to design constraints the partition walls of the room cannot run deck-to-deck. What can the team do to achieve Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies?

A.

Use MERV 8 (F5), or higher, filters

B.

Provide a hard-lid ceiling

C.

Create positive pressure in the room

D.

Provide a large opening to dilute air contaminates

If a commercial building is considered to have 100 peak visitors in a day, what is the minimum number of short-term

bicycle storage spaces that must be provided to earn one point under Location and Transportation Credit, Bicycle

Facilities?

A.

Three

B.

Four

C.

Five

D.

Ten

The Lakeside Resort is a hotel in a rural area located about 60 mi. (96.6 km) from the nearest town, which has a population of 10,500. There are no other towns for over 200 mi. (321.9 km). The surrounding community is largely made up of ranches and federal- and state-owned land.

The project consists of a single building that includes the following:

• 150 guest rooms

• A small restaurant

• An indoor pool

• Conference spaces

• Event spaces

• Six tenant spaces

A lease has been secured for a future spa, gift shop, coffee shop, and tour operator. Two of the six tenant spaces have not yet been leased. The property is 10 acres, adjacent to a lake, and has trail access to public lands for hiking. It is anticipated that occupants will mostly arrive by car, but there is one public bus trip per day from the nearest town.

The project consists of the building, parking lots for overnight guests and daily visitors, a walking path to the lake, and hiking trails leading to the public lands. The project has a goal of being Gold certified under LEED for New Construction.

When determining occupancy for the project, how should the project team account for the occupancy for the future spa, gift shop, coffee shop, tour operator space, and the two unknown tenant spaces?

A.

Use zero as the number of occupants for unleased spaces

B.

Use an estimate of the number of occupants based on the project team ' s discretion

C.

Use the default occupancy counts from the LEED Reference Guide for the incomplete spaces

A design team is evaluating strategies to ensure that a healthcare facility remains operational for critical services during frequent power outages. The building currently relies on a diesel generator for emergency power, but the owner is interested in sustainable alternatives that can also contribute to the project’s energy efficiency during normal operations.

Which of the following strategies should the design team recommend to provide energy resilience for the healthcare facility while enhancing energy efficiency during regular operations?

A.

Install a new natural-gas generator as the primary source of backup power

B.

Implement solar photovoltaic panels with a battery energy-storage system

C.

Increase the capacity of the existing diesel generator

Which site preparation and construction method contributes to earning the Materials and Resources Credit, Construction and Demolition Waste Management?

A.

Reuse excavated soil and land-clearing debris

B.

Implement in situ soil remediation and post removal of the existing concrete pavement

C.

Salvage and recycle 50% of the existing materials (based on volume) generated during site demolition for three material streams

D.

Ensure reduction of pollution from construction activities by using airborne dust generation capture systems

An urban office building project is installing a cooling tower. To save on potable water, the project would like to use a nonpotable water source to provide 20% of the cooling tower makeup water to achieve the maximum number of points under Water Efficiency Credit, Cooling Tower Water Use. Which nonpotable water source would be the most appropriate for use?

A.

Municipally supplied tap water

B.

Ground surface stormwater runoff

C.

Rainwater collected from the building roof

D.

Graywater from the building ' s hand-washing sinks