Prepare effectively for your USGBC LEED-AP-BD+C LEED AP Building Design + Construction (LEED v5 AP BD+C) certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2026, ensuring you have the most current resources to build confidence and succeed on your first attempt.
For a bicycle network to demonstrate compliance with Location and Transportation Credit, Bicycle Facilities, the bicycle network must connect to
For a new project with a $10 million construction cost, the weight of the total recycled content is 0.9 tons (816.5 kilograms) each for post-consumer and pre-consumer recycled content. The value of the total recycled content is one million each for post-consumer and pre-consumer recycled content. What is the percentage of recycled content that contributes toward Materials and Resources Credit: Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2, Leadership Extraction Practices?
Which of the following statements is true for SSp1: Minimize Site Disturbance, Erosion and Sedimentation Control (ESC) plan compliance?
Green Infrastructure (GI) and Low-Impact Development (LID) rainwater management strategies improve upon the conventional approach for rainwater management by
The LEED AP has identified a pilot credit that is relevant to the project. This would be documented in LEED Online as a(n)
When preparing the Sustainable Sites Prerequisite, Construction Activity Pollution Prevention, the Construction General Permit must contain which of the following?
Which of the following statements is correct when defining the project boundary?
Which of the following project types is required to consider the perimeter floor area instead of the regularly occupied floor area under the Indoor Environmental Quality Credit, Daylight calculations?
Massing and orientation in Integrative Process Credit. Integrative Process evaluates how rotating the building 90 degrees affects
The Exemplary Performance threshold for Sustainable Sites Credit, Rainwater Management requires:
Increasing which of the following variables will require an increase in the outdoor airflow rate under Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?
The design team has specified products to achieve Materials and Resources Credit: Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2. Leadership Extraction Practices for the project. At the end of the construction, it was discovered that the transporter who shipped a portion of the wood did not have chain-of-custody (CoC) certification. The design team should do which of the following?
Which of the following sinks is classified as a private lavatory faucet under Water Efficiency Credit, Indoor Water Use Reduction?
Which of the following strategies can be used to reduce the internal load of a building?
An existing vacant office building will be completely renovated and new mechanical, electrical and plumbing systems will be installed. 20% of the building ' s gross floor area will be complete at the time of certification. There will be a data center and some retail stores on the ground floor of the building at a future date. Which rating system is applicable for the building?
A project team reviews office chairs with a Type III environmental product declaration (EPD) for the five different categories of environmental impact reduction. Which of the following must the chairs demonstrate for product optimization?
The Lakeside Resort is a hotel in a rural area located about 60 mi. (96.6 km) from the nearest town, which has a population of 10,500. There are no other towns for over 200 mi. (321.9 km). The surrounding community is largely made up of ranches and federal- and state-owned land.
The project consists of a single building that includes 150 guest rooms, a small restaurant, an indoor pool, conference spaces, event spaces, and six tenant spaces. A lease has been secured for a future spa, gift shop, coffee shop, and tour operator. Two tenant spaces have not yet been leased. The 10-acre property is adjacent to a lake and provides trail access to public lands.
When drawing the LEED boundary for this project, the project team should include all:
Which rating system is being used if all of the credits below have been submitted towards certification?
- Location and Transportation Credit, Reduced Parking Footprint
- Energy and Atmosphere Credit, Fundamental Refrigerant Management
- Indoor Environmental Quality Credit, Acoustic Performance
- Materials and Resources Credit, Persistent, Bio accumulative, and Toxic (PBT) Source Reduction - Lead, Cadmium, and Copper
A design team is working on a new building project and is employing an integrated, whole-building approach. The architects want to increase the size of a glazed opening on the south facing wall. Which team members are first
affected by this change?
What standard should an engineer use when establishing minimum ventilation rates for a new mechanically ventilated space to earn Indoor Environmental Quality, Minimum Indoor Air Quality Performance?