LEED-AP-BD+C USGBC LEED AP Building Design + Construction (LEED v5 AP BD+C) Free Practice Exam Questions (2026 Updated)

Prepare effectively for your USGBC LEED-AP-BD+C LEED AP Building Design + Construction (LEED v5 AP BD+C) certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2026, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 7 / 7
Total 454 questions

The project team is working to reduce the building ' s total energy costs in a cold climate. Which is the best strategy for the project team to consider?

A.

Additional envelope insulation

B.

Window shades

C.

Highly reflective roof

D.

Increased cooling efficiency

Which individual occupant lighting control meets the requirements of Indoor Environmental Quality Credit, Interior Lighting?

A.

Two Level (on, off)

B.

Three Level (on, 25%, off)

C.

Three Level (on, 50%, off)

D.

Three Level (on, 75%, off)

A school wants to incorporate natural daylighting in classrooms on all sides of the building. What can the project design team explain to the school district about how this strategy will affect the operational energy cost?

A.

Heat gain will reduce the air conditioning load

B.

Having the lights off reduces the electricity use

C.

Reduction in lighting fixture use reduces re-lamping

D.

There would be passive solar heating benefits to all of the classrooms

An electrical team installs photovoltaic panels over a parking lot. This action contributes to which of the following credits?

A.

Optimize Energy Performance

B.

Light Pollution Reduction

C.

Low-Emitting Materials

D.

Demand Response

The design team is attempting to achieve the Increased Ventilation strategy in the Indoor Environmental Quality Credit, Enhanced Indoor Air Quality in a conference room. The associated ASHRAE standard requires 400 CFM (11.3 CMM) of ventilation air, but the local code requires 500 CFM (14.1 CMM) of ventilation air. What is the required minimum amount of ventilation air to achieve this credit?

A.

650 CFM (18.4 CMM)

B.

500 CFM (14.1 CMM)

C.

400 CFM (11.3 CMM)

D.

520 CFM (14.7 CMM)

The Volatile Organic Compounds (VOC) emissions evaluation criteria for adhesives and sealants should be obtained for wet-applied products installed within:

A.

A non-structural wall

B.

The air or vapor barrier membrane

C.

Storefront systems

A design team pursuing LEED for a new office building project calculated that with the water fixtures specified for the project, a 24% water reduction can be achieved compared to the LEED baseline. What does this mean to the team in terms of pursuing LEED?

A.

The project cannot pursue LEED

B.

The project may pursue Water Efficiency Credit, Indoor Water Use Reduction

C.

The project does not meet Water Efficiency Prerequisite, Indoor Water Use Reduction, but can make up the points elsewhere in the rating system

D.

The project can meet the Water Efficiency Prerequisite, Indoor Water Use Reduction, but cannot earn any points under Water Efficiency Credit, Indoor Water Use Reduction

A LEED AP is calculating water use for a new construction project. Considering WEp2: Minimum Water Efficiency, what is the total water use from the following fixtures and appliances?

• Toilet: 600 gal. (2,271.2 L)

• Urinal: 300 gal. (1,135.6 L)

• Kitchen faucet: 100 gal. (378.5 L)

• Commercial dishwasher: 200 gal. (757.1 L)

• Lavatory faucets: 200 gal. (757.1 L)

A.

1,400 gal. (5,299.6 L)

B.

1,200 gal.(4,542.5 L)

C.

900 gal. (3,406.9 L)

D.

1,100 gal.(4,163.9 L)

Which system is eligible for the Energy and Atmosphere Credit, Renewable Energy Production?

A.

Ground-source heat pumps

B.

Tidal-based electrical production

C.

Municipal solid waste combustion

D.

Passive solar and daylighting strategies

For Location and Transportation Credit, Access to Quality Transit, a project team preparing timetables and service-level documentation must ensure the materials include

A.

verification that a weighted daily average has been used for each qualifying route

B.

confirmation that functional entries of the project are within 3/4 mi. (1.20 km) of the stop

C.

verification that a weighted building average has been used for each qualifying functional entry

D.

confirmation that each qualifying route features paired route service (service in opposite directions)

Which of the following characteristics are a requirement of a compliant water meter?

A.

Must be digital

B.

Must be permanently installed

C.

Must transmit data to a remote location

D.

Must be capable of storing data for 36 months

Which of the following should be evaluated to assess a project’s human-use and health impacts?

A.

Access to essential transportation routes

B.

Proximity to manufacturing plants

C.

Access to medical services

A comprehensive rainwater management plan may include design elements such as

A.

artificial turf, bioretention pond, cisterns and hay bales

B.

cisterns, porous pavement, swales and vegetated roofs

C.

soil compaction, swales, vegetated roofs and xeriscaping

D.

bioretention pond, cisterns, porous pavement and stabilized construction entrance

Which system is eligible for EAc4: Renewable Energy?

A.

Tidal energy conversion

B.

Municipal solid waste combustion

C.

Ground-source heat pumps

D.

Passive solar and daylighting strategies

Which strategy should be employed to improve daylighting when designing a new building?

A.

Decrease the number of exterior light shelves

B.

Increase the height of interior partitions

C.

Increase the building depth

D.

Increase the number of glare-control devices

A project has a potable water source as well as two alternative water sources. Which of the following statements is applicable for a project using two alternative water sources?

A.

A project may not use two alternative water sources

B.

Target the uses that require the least treatment first

C.

Match uses by location: indoor sources to indoor uses, outdoor sources to outdoor uses

D.

All alternative water sources should be treated to potable water standards

Page: 7 / 7