Winter Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: s2p65

Easiest Solution 2 Pass Your Certification Exams

LEED-AP-ID+C USGBC LEED AP Interior Design + Construction (LEED AP ID+C) V4 Free Practice Exam Questions (2025 Updated)

Prepare effectively for your USGBC LEED-AP-ID+C LEED AP Interior Design + Construction (LEED AP ID+C) V4 certification with our extensive collection of free, high-quality practice questions. Each question is designed to mirror the actual exam format and objectives, complete with comprehensive answers and detailed explanations. Our materials are regularly updated for 2025, ensuring you have the most current resources to build confidence and succeed on your first attempt.

Page: 1 / 2
Total 100 questions

For a bicycle network to demonstrate compliance with Location and Transportation Credit, BicycleFacilities, the bicycle network must connect to

A.

five bicycle trails

B.

at least eight diverse uses

C.

a restaurant, a grocery shop, a church and two bus lines

D.

a rapid transit stop that is within 3 mi. (5 km) biking distance of the project boundary

A project owner requests that additional outside air be provided to the building occupants in order to improve employee health, welfare, well-being and productivity. However, doing so could make it more difficult to achieve which credit?

A.

Indoor Environmental Quality Credit, Acoustic Performance

B.

Energy and Atmosphere Credit, Advanced Energy Metering

C.

Energy and Atmosphere Credit, Optimize Energy Performance

D.

Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies

A project needs 5,000 ft2 (464.5 m2) of raised flooring. The tenant wants to refurbish and install an existing raised floor from another building as part of the project. If this material will equate to 14% of the overall project materials cost, which credit would this contribute towards?

A.

Innovation Credit, Option 1. Innovation

B.

Materials and Resources Credit, Construction and Demolition Waste Management

C.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2. Leadership Extraction Practices

D.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 1. Raw Material Sourcing and Extraction Disclosure

The WaterSense label or local equivalent requirement in Water Efficiency Prerequisite, Indoor Water Use Reduction ensures that eligible newly installed plumbing fixtures will

A.

be advertised as LEED compliant

B.

be both water efficient and high performing

C.

comply with mandatory federal government regulations

D.

comply with all international plumbing system requirements

A project has access to two alternative water sources. How should they determine which source to use where?

A.

A project may not use two alternative water sources

B.

Target the uses that require the least treatment first, such as toilet flushing or irrigation

C.

Match uses by location: indoor sources to indoor uses, outdoor sources to outdoor uses

D.

All sources should be treated to potable water standards and used to supplement the municipal supply

A 1,500 ft2 (139 m2) mobile home is built in the downtown area of a major city. 90% of the project's gross floor will be

completed by the time of occupancy. LEED certification is being sought. Which rating system would be the most

appropriate one to use?

A.

LEED Interior Design and Construction

B.

LEED Building Design and Construction

C.

LEED for Homes

D.

No rating system

In addition to the Material Type, what other information needs to be included in the Construction and Demolition Waste Management Calculation?

A.

Waste stream, total waste, diverted waste, waste to landfill

B.

Waste volume, commingled waste, wood for energy, reused items

C.

Donated waste, landfill waste, percentage of cardboard with recycled content, diverted waste

D.

Percentage of alternative daily cover (ADC) produced by the sorting facility, total of donated items, total of wood recycled, total of wood reused

When developing the overall energy strategy of the project, which credit should the client consider to work synergistically with the Energy and Atmosphere Credit, Enhanced Commissioning, on an ongoing basis?

A.

Advanced Energy Metering

B.

Renewable Energy Production

C.

Green Power and Carbon Offsets

D.

Enhanced Refrigerant Management

A single tenant occupies an entire building but wishes to renovate and achieve LEED certification on only a portion of the building. This is possible if

A.

the project boundary includes 75% of the construction scope and is drawn at a clear, physical barrier

B.

the project boundary includes 100% of the construction scope and is drawn at a clear, physical barrier

C.

the project boundary excludes no more than 40% of the construction scope and is drawn at a clear, physical barrier

D.

the project boundary excludes no more than 60% of the construction scope and is drawn at a clear, physical barrier

Which systems must be commissioned to earn Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification?

A.

Fire suppression

B.

Irrigation controls

C.

Building Envelope

D.

Daylighting controls

A project team member has prepared a map and an accompanying table as documentation for Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 2. Diverse Uses. The map includes the location of each use, the location of the project, and the main entrance of the building. The table includes the distance to each use, the name of each use, and the category of each use. The team lead reviews the documentation and notes an important missing item. Which of the following s the most important item to add to the documentation?

A.

A description of each use

B.

The location of parking lots near each use

C.

Walking routes from the project to each use

D.

A calculation of the expected number of project occupants who will visit each use

A project incorporates steel beams as an interior architectural feature, but no recycled content information is available. When calculating the recycled content of the beams, which default content amount should be used?

A.

10%

B.

15%

C.

20%

D.

25%

A project team wants to achieve Materials and Resources Credit, Building Product Disclosure and

Optimization - Material Ingredients. By what means can a product demonstrate their material ingredient optimization?

A.

Green Seal

B.

Manufacturer Inventory

C.

GreenScreen v1.2 Benchmark

D.

Chemical Abstract Service Registration Number (CASRN)

Based on the results of a six-hour waste stream study, the team for an Interior Design and Construction Retail project plans to provide dedicated areas for four recyclable waste streams: cardboard, plastic, metal, and paper.

The project is open to the public 10 hours a day, six days a week. Which of the following actions should be the project team's top priority in order to demonstrate the minimum requirements to achieve Materials and Resources Prerequisite, Storage and Collection of Recyclables?

A.

Take appropriate measures for the safe collection, storage and disposal of batteries

B.

Make a waste stream projection for the entire year based on the six hours of the waste stream study

C.

Make a waste stream projection for the entire week, based on the six hours of the waste stream study

D.

Extend the waste stream study to cover a representative time period of a minimum of 24 hours to identify the top five recyclable waste streams

For a retail LEED Interior Design and Construction project, the products include 25% by cost Cradle to Cradle v3, Gold certified products, and 25% by cost products assessed with the GreenScreen List Translator. Which of the following Materials and Resources and Innovation credits can the project team achieve?

A.

Materials and Resources Credit, Interiors Life-Cycle Impact Reduction Option 3. Design for Flexibility and Innovation Credit, Exemplary Performance

B.

Materials and Resources Credit, Building Product Disclosure and Optimization - Material Ingredients, Option

1. Material Ingredient Reporting and Innovation Credit, Exemplary Performance

C.

Materials and Resources Credit, Building Product Disclosure and Optimization - Material Ingredients, Option

2. Material Ingredient Optimization and Innovation Credit, Exemplary Performance

D.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials,

Option 2. Leadership Extraction Practices and Innovation Credit, Exemplary Performance

Regarding the Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2. Leadership Extraction Practices, in addition to materials costs, what information is needed to determine the total cost of each product?

A.

Taxes and delivery costs

B.

Taxes and installation costs

C.

Installation equipment and labor

D.

Transportation costs and installation labor

Which sentence is true about Renewable Energy Certificates (RECs)?

A.

RECs can be used to mitigate the effects of all scope two emissions.

B.

RECs can be used toward both electric and nonelectric energy use.

C.

RECs can be used to mitigate emissions from purchased electricity.

D.

RECs can be used to mitigate emissions from electricity produced on site.

For the achievement of Materials and Resources Credit, Interiors Life Cycle Impact Reduction, Option 1. Interior Reuse, how are hazardous materials accounted for in the calculation?

A.

Included in the numerator only

B.

Included in the denominator only

C.

Included in both the numerator and denominator

D.

Excluded from both the numerator and denominator

The project team for a bank project located in a mall is wondering whether they can earn Location and Transportation Credit Surrounding Density and Diverse Uses, Option 2. Diverse Uses. When evaluating a map of nearby diverse uses, which of the following would you recommend to be entered in the calculation?

A.

Health club, Laundromat, Post office, Restaurant

B.

Hair salon, Movie Theater, Pharmacy, Restaurant

C.

Clothing store, Commercial office, Eye doctor, Supermarket

D.

Convenience store, Furniture store, Hardware store, Pharmacy

Which of the following is required for a cooling tower and evaporative condenser in the Water Efficiency Prerequisite, Indoor Water Use Reduction?

A.

Alkalinity testing, drift eliminators and energy star rating

B.

Makeup water meters, conductivity controllers and overflow alarms

C.

Non potable water sources, makeup water meters and bacteria testing

D.

Water treatment calculations, overflow alarms and system performance narrative

Page: 1 / 2
Total 100 questions
Copyright © 2014-2025 Solution2Pass. All Rights Reserved